Home India RAILWAYS Parliament Question: Water Logging due to RUBs in Tirupati L...
Date: 2025-12-17 Category: Not Applicable State: Union Government Country: India

Parliament Question: Water Logging due to RUBs in Tirupati Lok Sabha Constituency

Issued by RAILWAYS · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This document summarizes the government's response to a starred question in Lok Sabha regarding water logging issues in Road Under Bridges (RUBs) within the Tirupati Lok Sabha Constituency. The document outlines measures taken to address and prevent water logging, as well as coordination efforts with local municipal bodies. The response was addressed on December 17, 2025, and is a statement laid on the Table of the House. **Key Points / Main Content** * **ROB/RUB Sanctioning:** Sanctioning of Road Over Bridge (ROB) and Road Under Bridge (RUB) projects is a continuous process prioritized based on safety, train mobility, road user impact, and feasibility. * **Construction Numbers:** * Between 2004-14, 4,148 ROBs/RUBs were constructed. * Between 2014-25 (October), 13,653 ROBs/RUBs were constructed. * **Project Costs:** As of November 1, 2025, 4,689 ROBs/RUBs have been sanctioned at a cost of ₹1,11,583 crore, including 316 in Andhra Pradesh at ₹11,686 crore. Six ROB/RUB projects are sanctioned in the Tirupati Lok Sabha Constituency at a cost of ₹208 crore. * **Water Logging Issues:** 43 RUBs exist in Tirupati Lok Sabha Constituency. Water logging during the last monsoon season has been reported in three RUBs, which are addressed with heavy-duty pumping arrangements, stationary watchmen, warning signs, and gate barriers. * **Remedial Measures:** Railways are working with municipal and local bodies for integrated drainage solutions and have implemented the following: * Adequate drainage arrangements for new RUBs/Subways. * Remedial measures like water flow diversion, cover sheds, humps, cross drains, and joint sealing for existing RUBs/subways. * Pumping arrangements for identified RUBs. * **Survey and Actions:** As of April 1, 2025, 2,670 of 14,745 RUB/Subway locations were identified as prone to water logging. Permanent remedial measures have been taken on 1,351 RUBs/Subways. Temporary dewatering arrangements are also provided, and vulnerable RUBs are manned by RUB Mitra/Stationary Railway Watchmen. * **Objective:** The objective is to keep RUBs/Subways functional throughout the year. **Impact Analysis** **Stakeholder:** Road Users (pedestrians, vehicles, animals) *Impact:* The document directly addresses the safety and convenience of road users affected by water logging in RUBs. The implemented measures aim to reduce hazards and ensure the functionality of RUBs during periods of rainfall. *Action Required:* Road users should be aware of warning signs and temporary traffic arrangements implemented during heavy rainfall. **Stakeholder:** Ministry of Railways *Impact:* The Ministry is responsible for the construction, maintenance, and remediation of water logging issues in ROBs/RUBs. The document confirms their active role in prioritizing projects, allocating resources, and implementing both temporary and permanent solutions. *Action Required:* Continue to monitor RUBs for water logging issues, implement remedial measures as needed, and coordinate with local bodies for long-term drainage solutions. **Stakeholder:** Local Municipal Bodies *Impact:* The document emphasizes the need for coordination with local municipal bodies for integrated drainage planning around RUB projects. *Action Required:* Collaborate with the Railways to ensure effective drainage solutions and address water logging issues in and around RUB locations.

Key Entities Referenced

Ministry of Railways: The primary government entity responsible for the subject matter of the question, regarding road under bridges. Road Under Bridges (RUBs): The core subject of the policy question, specifically regarding water logging issues. Tirupati Lok Sabha Constituency: The specific geographic area to which the question and answer pertain. Lok Sabha: The house of parliament where the question was raised.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA STARRED QUESTION NO.255 TO BE ANSWERED ON 17.12.2025 WATER LOGGING DUE TO RUBS IN TIRUPATI LOK SABHA CONSTITUENCY *255. SHRI MADDILA GURUMOORTHY: Will the Minister of RAILWAYS be pleased to state: (a) whether the Government is aware that the existing Road Under Bridges (RUBs), especially in Tirupati Lok Sabha Constituency are leading to frequent water logging even during light to moderate rainfall, making them hazardous for pedestrians, vehicles and animals; (b) if so, the details of the specific locations where such engineering failures have been reported; (c) the immediate measures taken/proposed to be taken by the Government to mitigate water stagnation in these existing RUBs, including drainage redesign/pump installation; (d) whether the Government has conducted a technical audit/review of the design flaws causing this issue and if so, the details thereof; (e) the steps incorporated/being incorporated in the planning and execution of new RUBs to avoid such water logging issues in the future and whether any accountability has been fixed for flawed designs and if so, the details thereof; and (f) whether coordination with local municipal bodies is ensured for integrated drainage planning in and around RUB projects and if so, the details thereof? ANSWER MINISTER OF RAILWAYS, INFORMATION & BROADCASTING AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (f): A Statement is laid on the Table of the House. *****STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (f) OF LOK SABHA STARRED QUESTION NO. 255 TO BE ANSWERED ON 17.12.2025 (a) to (f) : Sanctioning of works of Road over Bridge (ROB)/Road under Bridge (RUB) in lieu of Level crossings (LCs) is a continuous and dynamic process of Indian Railway. Such works are prioritised and taken up on the basis of its impact on safety in train operations, mobility of trains & impact for road users and feasibility etc. Nos. of ROBs/ RUBs constructed on Indian Railways during the period 2004-14 vis a vis 2014-25 (Oct’25) is as under: Period ROBs/ RUBs constructed 2004-14 4,148 Nos. 2014-25 (Oct’25) 13,653 Nos. As on 01.11.2025, 4689 Nos. ROBs/ RUBs are sanctioned at the cost of ₹1,11,583 Cr on Indian Railways including 316 Nos. Road Over Bridge (ROB)/Road Under Bridge (RUB) at a cost of ₹ 11,686 crore in the State of Andhra Pradesh, which are at various stages of planning and execution. 06 Nos. ROBs/RUBs works are sanctioned at a cost of ₹ 208 crore in Tirupati Lok Sabha Constituency. 43 Nos. RUBs exist in Tirupati Lok Sabha Constituency. During heavy rains, problem of water logging has been reported for short duration during last monsoon season in three RUBs (RUB Nos. 85A at Km 63/100-200, 90A at km 64/300-400 and 95A at km 69/900-70/0 on Gudur Junction-Renigunta junction section), which are addressed promptly by provision of heavy duty pumping arrangement. Further, stationary watchman, warning signs and gate barriers have been provided. Railways are working with municipal bodies and other local bodies for integrated drainage solutions at subway locations. Further, Railwayshave taken several remedial measures to mitigate the problem of water logging in subways as under: (i) Adequate drainage arrangement is made as integral part of planning of new Road Under Bridge (RUB)/Subways. (ii) In existing RUBs/subways remedial measures like water flow diversion to nearby bridge and nallahs/drains, provision of cover shed on approach roads, provision of hump at entry to Road under Bridge (RUB), provision of cross drains, sealing of joints etc. are made as per feasibility, suitability and site requirements. (iii) Pumping arrangement is also been made for identified RUBs, to drain out water expeditiously in case of emergency and provision to stop road traffic in exceptional/unusual rainfall situation for safety of road users. Based on detailed survey of RUB/Subways, as on 01.04.2025, 2670 locations were identified by zonal railways prone to water logging out of total 14,745 RUB/Subways already constructed. Railways have taken up the work of permanent remedial measures on these RUB/Subways and with consistent efforts, 1351 RUBs/Subways have been provided with necessary infrastructure to prevent water logging and maintain its functionality in future. Balance RUB/Subways have also been provided by temporary solution i.e. dewatering arrangements. Moreover round the clock manning of vulnerable RUBs where there is possibility of flooding are also being done by deputing RUB Mitra/Stationery Railway Watchman. The objective of all this exercise is to keep RUBs/Subways functional throughout the year. *****

Continue your research