See Full Document Text
Ministry of Tourism
PROMOTION OF CARAVAN TOURISM
Posted On: 16 MAR 2026 3:44PM by PIB Delhi
Development and promotion of tourist destinations and products, including caravan tourism is primarily
undertaken by the respective State Government / Union Territory (UT) Administration. The Ministry of
Tourism promotes India in a holistic manner, through various initiatives.
The Ministry of Tourism through its central sector schemes of ‘Swadesh Darshan’, ‘Pilgrimage
Rejuvenation and Spiritual, Heritage Augmentation Drive (PRASHAD)’ and ‘Assistance to Central
Agencies for Tourism Infrastructure Development’ extends financial assistance to the State Governments /
UT Administrations for tourism infrastructure development in the country. The central financial assistance
is being extended according to guidelines and based on proposals / detailed project reports received from
the States and UT Governments.
The Ministry of Tourism has not supported any Caravan Tourism Project in Andhra Pradesh. However, the
list of other infrastructure projects sanctioned in Andhra Pradesh is given at Annexure.
******
ANNEXURE
List of projects sanctioned in the State of Andhra Pradesh:
S. No. Name of Project Amount Status
Sanctioned
(in ₹
Crore)
A Swadesh Darshan 1.0
i. Development of Kakinada - Hope Island - Coringa 67.83 Completed
Wildlife Sanctuary - Passarlapudi - Aduru - S Yanam –
Kotipally (March 2015)ii. Development of Nellore - Pulikat Lake - Ubblamadugu 49.55 Completed
Waterfalls – Nelapattu- Kothakoduru- Mypadu -
Ramateertham – Iskapalli (December 2015)
iii. Development of Buddhist Circuit: Shalihundam- 35.24 Completed
Bavikonda- Bojjanakonda -Amravati- Anupu (September
2017)
Total Sanction Cost 152.62
B Swadesh Darshan 2.0
i. Borra Cave Experience Araku-Lambasingi 29.88 Ongoing
(March 2024) (32.31% physical
progress)
ii. Development of Suryalanka Beach Experience, Bapatla 97.52 Ongoing
(March 2025)
(16.57% physical
progress)
Total Sanction Cost 127.40
C Challenge Based Destination Development (CBDD)
i. Enriching Buddhist Heritage and Cultural Experiences at 25.00 Ongoing
Nagarjuna Sagar (March 2025)
(21.27% physical
progress)
ii. Ahobilam-A spiritual Odyssey (March 2025) 24.99 Ongoing
(34.39% physical
progress)
Total Sanction Cost 49.99
D PRASHAD
i. Development of Amaravati Town, Guntur District as a 27.77 Completed
Tourist Destination (July 2020)
ii. Development of Srisailam Temple (October 2021) 43.08 Completediii. Sri Varaha Lakshmi Narsimha Swami Vari Devasthanam 54.04 Ongoing
at Simhachalam in Vishakhapatnam Temple (December
(95.58% physical
2022)
progress)
iv. Development of Pilgrimage Tourism Infrastructure in 25.33 Ongoing
Annavaram Temple Town (December 2024)
(33.11% physical
progress)
Total Sanction Cost 150.22
E Special Assistance to States for Capital Investment (SASCI)
i. Gandikota- Enriching the Fort and Gorge Experience 77.91 Ongoing
(November 2024)
(49.16% physical
progress)
ii. Akhanda Godavari: (Havelock Bridge & Pushkar Ghat) 94.44 Ongoing
(November 2024, Revised Sanction in Dec 2025) (31.78% physical
progress)
Total Sanction Cost 172.35
F Assistance to Central Agencies
i. Sound and Light Show at Puttaparthy, Andhra Pradesh 7.08 Completed
(November 2017)
ii. Construction of Cruise-Cum-Costal Cargo Terminal at 38.50 Completed
Channel berth area in Outer Harbour of Visakhapatnam
Port (December 2018)
iii. Tirupati Railway Station (February 2017) 5.75 Completed
iv. Glass Top Coaches: 4.00 Completed
1. Vizag-Arakku Valley Vishakhapatnam, Andhra
Pradesh. (2017-18)
Total Sanction Cost 55.33
Total Central Assistance 707.91
This information was given by Union Minister for Culture and Tourism Shri Gajendra Singh Shekhawat in
a written reply in Lok Sabha today.*****
M Annadurai
(Release ID: 2240663) Visitor Counter : 185
Read this release in: Urdu , ही , Telugu