GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
Minor Irrigation – Nalgonda Disgtrict - Improvements to Kalvapally Bandham,
Kalvapally Village, Garidepally Mandal, Nalgonda District – Administrative
Approval for Rs.84.15 lakhs – Accorded – Orders – Issued.
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
IRRIGATION & CAD (MI T) DEPARTMENT
G.O.Rt.No. 241 Dated: 1.3.2012
Read the following:-
From the Chief Engineer, Minor Irrigation, Hyderabad Letter No. DCE-II /
OT1 / SO1 / K.Bandham / Kalwapally / Nlg Dist / 2011, Dated 28.12.2011
@@@
ORDER:
In the letter read above, the Chief Engineer, Minor Irrigation, Hyderabad
has submitted an estimate for the work “Improvements to Kalvapally Bandham,
Kalvapally Village in Garidepally Mandal of Nalgonda District” to accord
administrative approval for Rs.84.15 lakhs stating that the anicut is situated across
Vemuloor Vagu. The anicut is constructed long back at the time of Nizam
Government. The ayacut under this anicut is 350.63 Acres. The left and right side
of the earthen bund are eroded and slipped on either side and became very weak.
The bund is fully covered with thick jungle. The body wall of anicut is badly
damaged horizontally and vertically, cracks were developed, top layer washed out
and possibility of collapse of body wall in rainy season. The apron wings are also
to be repaired. The canals carrying capacity also reduced due to slipped earth.
The farmers under this tank have requested to take up repairs to bring system
functioning. Therefore it is proposed the said work to stabilize the ayacut under
the Kalvapally Bandham. Further, he has stated that an amount of Rs.88461/- will
be taken up under MGNREGP. Hence, the Chief Engineer, Minor Irrigation,
Hyderabad has requested to accord administrative approval in the matter.
2. Government, after careful examination of the matter, hereby accord
administrative approval for Rs.84.15 lakhs (Rupees eighty four lakhs and fifteen
thousand only) for the work “Improvements to Kalvapally Bandham, Kalvapally
Village in Garidepally Mandal of Nalgonda District”
3. Out of the amount sanctioned in para 2 above, an amount of Rs.83,26,539/-
shall be debitable to the Head of Account “4702 COL on MI - MH (101) – Surface
Water GH – (11) Normal State Plan SH – (12) Construction & Restoration of MI
sources – 530 Major Works / 531 Other Expenditure”.
(PTO)2
4. The Rural Development Department have agreed to include the component
of LIS & RIS Bandham dismantling works & jungle clearance under shelf of project
for taking it under MGNREGP. Hence, the remaining amount of Rs.88,461/- for
the component of LIS & RIS Bandham dismantling works & jungle clearance shall
be proposed under MGNREGP funds in consultation with Rural Development
Department.
5. The Chief Engineer, Minor Irrigation, Hyderabad shall take further action
accordingly.
6. This order issues with the concurrence of Finance (Expr.PW) Department
vide their U.O.No.2243 / 83 / A1 / Expr. PW / 2012, Dated 30.1.2012 and PR & RD
(RD) Department vide their U.O.No.4786/RD.II/A1/2012, Dated 29.2.2012.
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
Dr.Prasanta Mapatra
Principal Secretary to Government
To,
The Chief Engineer, Minor Irrigation, Hyderabad
The District Collector, Nalgonda District.
Copy to:
The Commissioner, Rural Development Department,
The Accountant General, AP, Hyderabad.
The Director of Works & Accounts, MJ Road, Hyderabad.
I & CAD (General.II) Department
PS to Special Chief Secretary to CM
The OSD to M (MI, APSIDC, LI, WALAMTARI & GWD).
The PS to Principal Secretary to Government (Irrigation).
The PS to Principal Secretary to Government, PR&RD (RD) Dept.
The PS to Special Secretary to Government, I & CAD Dept.
SF/SC
// FORWARDED: BY ORDER //
SECTION OFFICER