GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
R&B Department- Construction of DTO office Building in the premises
of Collectorate Complex at Mahaboobnagar - Revised administrative
sanction for Rs.135.00 Lakhs - Accorded - Orders-Issued
TRANSPORT, ROADS AND BUILDINGS (B.I) DEPARTMENT
G.O.Rt..No. 303 Dated:21 -03-2012
Read the following:-
1. G.O.Rt.No.1653, TR&B(B.1) Dept., dt. 5-12-2007.
2. From the Engineer-in-Chief, (R&B), Buildings, Hyderabad
letter No.TA9/AEE4/MSB/Err.18969/2008, dt.19-9-2009 and
dt.12-12-2011.
@@@
O R D E R:
In the reference 1st read above, Govt. have accorded
administrative sanction for an amount of Rs.1,88,95,000/- for the
construction of 9 sub-treasury office buildings in the state and the work
of construction of District Treasury Office building in the premises of
Collectorate Complex at Mahaboobnagar in Mahaboobnagar District is
one among 9 sub treasury buildings and an amount of Rs.82.00 lakhs
earmarked for this work.
2. In the letter 2nd read above, the Engineer-in-Chief, (R&B), Buildings,
Hyderabad has submitted that as per the site conditions the estimate for
the above work was Technically approved for Rs.135.00 lakhs duly
restricting the technical sanction to the extent of administrative sanction
of Rs.82.00 lakhs. Since there was no response in tenders for 3 calls the
work was let out to the contractor at 4.95% excess over ECV based on
common SSR 2008-09 with a stipulation period to complete the work
within 15 months. The 1st extension of time was granted up to 30-6-2011
without liquidated damages. He has therefore requested the
Government to accord Revised Administrative Sanction for an amount of
Rs.135.00 lakhs as against the original Administrative Sanction of
Rs.82.00 lakhs, for arranging payment to the contractor for construction
of DTO Office Building in the premises of Collectorate Complex at
Mahaboobnagar District.
3. The Government after careful examination of the matter hereby
accord revised administrative sanction for an amount of Rs.135.00 lakhs
(Rupees one crore and thirty five lakhs) as against the original
Administrative Sanction of Rs.82.00 lakhs, for construction of DTO Office
Building in the premises of Collectorate Complex at Mahaboobnagar
District.
4. The expenditure sanctioned in para 3 above, shall be debited to the
Head of Account “4059 COL on PW – 60 Other Buildings –GH 051
Construction, GA(11) Normal State Plan -SH(12) Constn. of buildings for
treasuries -530- Major Works- 531 Other expenditure”.
(PTO)::2::
5. The Engineer-in-Chief, (R&B), Buildings, Hyderabad shall take
necessary action accordingly and he should also take action as per
G.O.Ms.No.94, I&CAD Dept., dt.1-7-2003.
6. This order issues with the concurrence of Finance (Exp.PW) Dept.
vide their U.O.No.4544/182/A2/Exp.PW/12, dt.21-2-2012.
(BY ORDER AND IN THE NAME OF GOVERNOR OF ANDHRA PRADESH)
S.P.SINGH
PRINCIPAL SECRETARY TO GOVERNMENT
To
The Engineer-in-Chief, (R&B), Buildings, Hyderabad
Copy to:
The Collector & District Magistrate, Mahaboobnagar
The Accountant General,A.P., Hyderabad.
The District Treasury Officer, Mahaboobnagar
The Superintending Engineer (R&B) Circle, Mahaboobnagar
The Executive Engineer (R&B), Mahaboobnagar
The Finance (Expr.PW) Department.
The PS to Hon’ble M(R&B)
SF/SC
//FORWARDED: BY ORDER//
SECTION OFFICER