GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
R&B Department – APRDC– Widening and Strengthening of Elkaturthy
– Siddipet Road from Km. 19/4 to 21/0 and from Km. 22/4 to 23/9 in
Karimnagar District-Administrative Sanction - Permission –Accorded-
Orders-Issued
--------------------------------------------------------------------------
TRANSPORT, ROADS & BUILDINGS (R.IV) DEPARTMENT
G.O.Rt.No. 357 Dated:03-04-2012
Read the following:
From the CE(R&B) CRN & MD, APRDC, Lr.No.APRDC / KMNR /
GM / EE / DEE 8 / AEE 17/ 2011, dt. 24.8.2011 and 27-2-2012.
***
ORDER:
In the letter read above, the Chief Engineer (R&B) CRN &
Managing Director, Andhra Pradesh Road Development Corporation,
Hyderabad, has stated that Elkathurthy – Siddipet Road is an
important MDR connecting two important State Highways i.e.,
Hyderabad – Karimnagar – Ramagundam Road and Rayapatnam –
Kodad Road. The total length of the road is 46 km out of which the
stretch from km. 21/0 to 22/4 & from km 23/9 to 65/4 is double lane
road. The stretch from km 19/4 to 21/0 and from 22/4 to 23/9 is
single lane road necessitating the road widening in this reach. The
existing road width is 3.66 m and the crust is 400 mm. The existing
formation width is 7 m and is proposed to be widened to 10m. The
proposed stretch is renewed during 1996/97. The traffic intensity on
the road is 8264 PCU’s per day.
2. The Chief Engineer (R&B) CRN & Managing Director, Andhra
Pradesh Road Development Corporation, has also stated that as per
the IRC 64 -1990 guidelines for capacity roads in Rural areas, the
recommended design service volume for single lane road in plain
terrain with low degree of curvature (i.e., 0-50 degrees per kilometer)
is 2000 PCU’s per day, where as the recommended design service
volume for Intermediate lane road in plain terrain with low degree of
Curvature is 6000 PCU’s per day. As the traffic intensity on the above
road i.e., 8264 PCU’s per day is greater than the design service
volume for Intermediate lane road, the above road requires to be to
be widened to two-lanes.
3. The Chief Engineer (R&B) CRN & Managing Director, Andhra
Pradesh Road Development Corporation, Hyderabad, has therefore
requested the Government to accord permission for “widening and
strengthening of Elkathurthy – Siddipet Road from km. 19/4 to 21/0
and from 22/4 to 23/9 in Karimnagar District” for administrative
sanction of Rs. 200.00 lakhs(two hundred lakhs only) under any
relevant head of account of Corenet roads by providing of funds.
(PTO)-2-
4. After careful examination of the matter, Government hereby
accord administrative sanction of Rs. 200.00 lakhs (two hundred lakhs
only) for “widening and strengthening of Elkathurthy – Siddipet Road
from km. 19/4 to 21/0 and from 22/4 to 23/9 in Karimnagar District”,
under the head of Account”5054-Capital Out Lay on Roads and
Bridges – 04- District and Other Roads – MH-800 Other Expenditure -
GH-11- Normal State Plan– SH-33-Core Network Roads(Works)- 530-
Major Works – 531- Other Expenditure’.
5. The Chief Engineer (R&B) CRN & Managing Director, Andhra
Pradesh Road Development Corporation, Hyderabad, shall take further
necessary action in the matter.
6. This orders issues with the concurrence of Finance (Expr.PW)
Department vide their U.O.No.6612/261/A2/Exp.PWD/2012, dated:
15-03-2012
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA
PRADESH)
S.P.SINGH
PRINCIPAL SECRETARY TO GOVERNMENT
To
The Chief Engineer (R&B) CRN & Managing Director,
A.P. Road Development Corporation, Hyderabad
Copy to:
The Advocate General, A.P,Hyderabad.
The Pay and Accounts Officer, Hyderabad.
The Finance (Expr.PW) Dept.
The PS to M(R&B)/Prl.Secy.(R&B)/ Secy. to CM.
Sf/Sc.
//FORWARDED BY ORDER//
SECTION OFFICER