GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
NABARD - RIAD - Face III R&B Department, - Construction of High Level
Bridge across Gundlavagu in K.M.2/8-10 of Pasra - Gundala Road in
Warangal District Extra depth in foundation excavation executed involving
excess amount of Rs,12,98,846/- Recovery from (4) officers- concerned
Orders- Issued.
TRANSPORT, ROADS & BUILDINGS (Vig.I) DEPARTMENT
G.O.Rt.No. 306 Dated:22.03.2012
Read
Chief Engineer (R&B) - Rural Roads/ NABARD, Lr.No.2526/DCE (N)
/(IV) DEE-I/ III/ AEE 3/RIAD/2009 dt.05-12-2011.
****
ORDER:
The Chief Engineer, Rural Roads (R&B), (NABARD), has reported vide
reference read above, that 4 (R&B) Engineers in Warangal District allowed
execution of unwarranted extra depth in foundations excavation, involving
unfruitful excess expenditure of Rs.12,98,846/- in the work construction of
High level bridge across Gundlavagu in KM.2/8-10 of Pasra - Gundala Road
in Warangal District.
2. He has requested that the above said amount of Rs.12,98,846/- may
be recovered from (1) Rs.4,43,000/- from Sri M.Bhushanam, the then
Superintending Engineer (R&B) Warangal (Retired on 31-08-2009);
(2) Rs.2,23,474/- from Sri J.Satyanarayana Rao, the then Executive
Engineer (R&B) Warangal Division, presently Deputy Superintending
Engineer (Rural circle), Hyderabad; (3) Rs.2,68,798/- from Sri B.Raju Naik,
the then Deputy Executive Engineer (R&B), Mulugu sub-division, now Deputy
Executive Engineer (R&B), sub-division Sultanabad, Peddapally Division,
Karimnagar District, and, (4) Rs 3,63,574/- from the legal heirs of Sri
P.Satyanarayana the then Assistant Engineer, Mulugu, Warangal Division,
(expired on 29.09.2009).
3. In the circumstances stated by the Chief Engineer, Rural Roads/
NABARD in the reference read above Government, decide and hereby order
that Rs.12,98,846/- shall be recovered from the concerned R&B Engineers of
Warangal District, i.e., (1) Rs.4,43,000/- from Sri M.Bhushanam, the then
Superintending Engineer (R&B), Warangal (Retired on 31-08-2009), (2)
Rs.2,23,474/- from Sri J.Satyanarayana Rao, the then Executive Engineer
(R&B), Warangal Division, presently Deputy Superintending Engineer (Rural
circle), Hyderabad; (3) Rs.2,68,798/- from Sri B.Raju Naik, the then
Deputy Executive Engineer (R&B), Mulugu sub-division,now Deputy Executive
Engineer (R&B), sub-division Sultanabad, Peddapally Division, Karimnagar
District and (4) Rs 3,63,574/- from the legal heirs of Sri P.Satyanarayana,
the then Assistant Engineer Mulugu, Warangal Division, (expired on
29.09.2009).
4. The Engineer-In-Chief (R&B), Administration, shall take necessary
further action accordingly, in the matter.
(BY ORDER AND IN THE NAME OF THE GOVENOR OF ANDHRA PRADESH)
S.P.SINGH
PRINCIPAL SECRETARY TO GOVERNMENT
To
The Engineer-In-Chief, (R&B), Administration, & NH.,
Hyderabad.
Copy to:
The Chief Engineer, (R&B), Rural Roads/ NABARD,
Hyderabad.
SF/SC. //FORWARDED BY ORDER//
SECTION OFFICER