GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
I&CAD – Pakhal Medium Irrigation Project – Financial Sanction accorded earlier
for lifting of water to the ayacut under Sangam sluice – Cancelled – Orders –
Issued.
=================================================
IRRIGATION AND CAD(IW:WRG) DEPARTMENT
G.O.Rt. No. 315, Dt.17-03-2012
Read the following:
1. From the Collector & District Magistrate, Warangal D.O. Lr. No.
CC/ PR/2011, dt. 06-11-2011.
2. From the Engineer-in-Chief, Medium Irrigation, Hyderabad
Letter No. ENC/Med/DCE-III/OT5/AEE(B)/Pakhal, dt.15-11-2011
3. G.O.Rt.No.1163,I&CAD(IW:WRG)Dept.,dt. 21-11-2011
4. Govt. Memo.No. 26309/WRG/2011-1, dt.:25-08-2011.
5. From the Executive Engineer, I&CAD, Irrigation Division,
Mahaboobabad, Warangal Dist. Lr. No. EE/DB/1050-53/2No’s/M.
dt. 28-11-2011.
-----000-----
ORDER:
The Collector & District Magistrate, Warangal District, in the reference 1st
read above, while furnishing the water level at the Pakhal Medium Irrigation
Project as on 06-11-2011 and its ayacut under Tower and Sangam sluices, has
stated that there is sufficient water in the tank to support the requirements of
drinking water, Tower sluice and enables to pump some water into the Sangam
sluice. Pumping of water into the Sangam sluice using the motor pumps was
needed to supply water upto 30-11-2011 to save the standing crops under the
sluice and requested the Govt. for suitable instructions in this matter. He has,
further, informed over phone that it would be possible to temporarily deploy the
required pumps from the Singareni Collieries, agencies of Devadula Lift
Irrigation Scheme Project and others, at nominal hire charges, with the help of
the representatives of the Water User Associations.
2. In the reference 2nd read above, the Engineer-in-Chief, Medium Irrigation,
Hyderabad, while explaining the situation, has requested the Govt. to accord
permission to the Collector, Warangal to lift the water by deploying pumps at
Sangam sluice to save the standing crop.
3. In the reference 3rd read above, the Govt. have accorded permission to
the Executive Engineer, Irrigation Division, Mahaboobabad, Warangal District
for lifting the water by deploying pumps at Sangam sluice under Pakhal Medium
Irrigation Project to save the standing crop and an amount of Rs.10.00 lakhs
(Rupees Ten Lakhs only) was sanctioned towards payment of (a) Energy
Charges, (b) Transportation of pumps, (c) payment of nominal rents if any and
(d) other incidental expenses, under certain conditions.
PTO-2-
4. In the reference 4th read above, orders were issued to the Engineer-in-
Chief, Medium Irrigation, Hyderabad and Chief Engineer, Central Designs
Organization, Hyderabad to explore the design alternatives to avoid need for
pumping of water in future and furnish report to the Govt. by the end of Feb.
2012.
5. The Engineer-in-Chief, Medium Irrigation, Hyderabad and the
Superintending Engineer, Irrigation, Warangal have personally apprised to the
Prl. Secretary(I) that they were able to save the crop by proactive and vigilance
of water regulation. The amount sanctioned for pumping of water has not been
utilized and was not required. They have reviewed the question of design
alternatives and opined that the design changes will not be cost effective,
considering that this kind of situation calling for pumping of water is rare. The
problem will reduce after completion of the canal modernization works being
taken-up with JICA funds.
6. The Executive Engineer, I&CAD, Irrigation Division, Mahaboobabad,
Warangal District, in the reference 5th read above, while explaining the
situation, has stated that the most of the standing crops under Sangam sluice
would be attained harvesting state within a week and can be saved with
effective water regulation and utilizing entire available water. The proposal for
lifting water to the aycut under Sangum sluice has been withdrawn and water
regulation was being continued on Sangum Canal.
7. Government, after careful examination of the matter, hereby cancel
orders issued in the G.O. 3rd read above.
8. This order issues with the concurrence of the Finance Department vide
their U.O. Note No. 809/32/A1/Exp.PW/12, dt. 19-01-2012.
(BY ORDER AND IN THE NAME OF THE GOVERNMENT OF ANDHRA PRADESH)
Dr. Prasanta Mahapatra
Principal Secretary to Government
To
The Executive Engineer, Irrigation Division, Mahaboobabad, Warangla District.
The Superintending Engineer, Irrigation Circle, Warangal.
The Engineer-in-Chief, Medium Irrigation, Hyderabad.
The Collector & District Magistrate, Warangal.
Copy to:
The Commissioner, CADA, I&CAD Dept., Hyderabad.
The Director of Treasuries and Accounts, Hyd. for necessary action.
The District Treasury Officer, Warangal for necessary action.
The O.S.D to Hon’ble Minister for Major & Medium Irrigation.
The O.S.D to Hon’ble Minister for M.I. APSIDC, LI, GWD & WALAMTARI.
The P.S. to Prl. Secretary to Govt.(I), I&CAD Dept.
SC/SF.
//Forwarded::By Order//
SECTION OFFICER