GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
Minor Irrigation – Mahabubnagar District - Construction of the two check dams in
Jadcherla and Balanagar Mandals of Mahabubnagar District - Administrative
Approval for Rs.91.10 lakhs - Accorded – Orders – Issued
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
IRRIGATION & CAD (MI T) DEPARTMENT
G.O.Rt.No. 361 Dated: 28.3.2012
Read the following:-
From the Chief Engineer, Minor Irrigation, Hyderabad Letter
No.DCE.Spl/OT(D)/AEE2/SCP/Mbnr/11, Dated 3.6.2011 and even No. Dated
14.12.2011.
@@@
ORDER:
In the letter read above, the Chief Engineer, Minor Irrigation, Hyderabad has
submitted two estimates for construction of Check dams in Mahabubnagar District to
accord administrative approval for Rs.91.10 under SCP stating that the villagers of
Jadcherla and Balanagar Mandals have no tank irrigation facilities. During rainy
season, adjacent vagu flood water is going waste. At present, the main source of
irrigation is through open wells and bore wells only. There are small poor and
marginal farmers and majority of them belong to SC community. The Dy.Director,
GWD has recommended the two sites for construction of check dams. Therefore it
is proposed to construct check dams to stabilize the ayacut under the bore wells and
open wells. The details of the 2 schemes proposed in Jadcherla and Balanagar
Mandals of Mahabubnagar District are as shown below.
S Name of the work Ayacut Cost
No (Acres) (Rs.in
(indirect) Lakhs)
1 Construction of Check dam No.1across 97.27 42.00
Polepally Vagu near Polepally (V),Jadcherla (M),
Mahabubnagar Dist
2 Construction of Check dam across Mallepally Vagu near 140.00 49.10
Mallepally(V), Balanagar (M), Mahabubnagar Dist
Total 237.27 91.10
Further, the CE/MI has stated that no component can be tagged with MGNREGS.
Hence, he has requested to accord administrative approval for Rs.91.10 lakhs for
construction of (2) check dams in Jadcherla and Balangar Mandals of
Mahabubnagar District under SCP funds.
(PTO)2
2. Government, after careful examination of the matter, hereby accord
administrative approval for Rs.91.10 lakhs (Rupees ninty one lakhs and ten
thousands only) for the following works.
S Name of the work Ayacut Cost
No (Acres) (Rs.in
(indirect) Lakhs)
1 Construction of Check dam No.1across 97.27 42.00
Polepally vagu near Polepally (V),Jadcherla (M),
Mahabubnagar Dist
2 Construction of Check dam across Mallepally vagu near 140.00 49.10
Mallepally(V), Balanagar (M), Mahabubnagar Dist
Total 237.27 91.10
3. The expenditure sanctioned in para 2 above shall be debitable to the Head of
Account “4702 COL on MI Sources – MH 789 – SCP – GH (11) – NSP – SH (12) – C
& R of MI -530 Major Works / 531 Other Expenditure”
4. This order issues with concurrence of the Finance (Expr.PW) Department vide
their U.O.No.1810/60/A1/Expr.PW/12, dated 28.1.2012
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
Dr.Prasanta Mahapatra
Principal Secretary to Government
To,
The Chief Engineer, Minor Irrigation, Hyderabad
The District Collector, Mahabubnagar.
Copy to:
The Account General, AP, Hyderabad.
The Director of Works & Accounts, MJ Road, Hyderabad
The OSD to M (MI, APSIDC, LI, WALAMTARI & GWD)
The PS to Principal Secretary to Government (I)
The PS to Special Secretary to Government
SF/SC
// FORWARDED: BY ORDER //
SECTION OFFICER