See Full Document Text
GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
I & CAD Department – Godavari Delta System – O & M Works – Plough
back Funds – Utilization for saving of Rabi crop in water scarcity situation –
Clarifications – Orders – Issued.
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
IRRIGATION & COMMAND AREA DEVELOPMENT (W.R.G) DEPARTMENT
G.O.Rt. No. 370, Dated:28-03-2012
Read the following:
1. From the Engineer-in-chief, Irrigation, Hyderabad Letter No.
ENC(I)/ DCF.IV/OTGDS/AEE.2/1421/6911 Rabi 2011-12, dt.19-
12-2011.
2. From Collector, East Godavari District, Kakinada Letter No. Nil
dt. 22-12-2011.
3. From the Engineer-in-Chief, Irrigation, Hyderabad Letter No.ENC(I)
/DCE.IV/OTGDS/AEE.2/1421/6911 Rabi 2011-12, dt. 27-12-2011.
4. From the Collector, West Godavari District, Eluru Letter No.D3/
7735/ 2011(Rev), dt. 31-12-2011.
5. From the SE (Irrigation Circle), Dowlaiswaram Lr. No. SE/IC/
Dowlm/OTIC/543, dt. 27-12-2011.
6. G.O. Rt.No. 87, I&CAD (WRG) Dept., Dt. 25-01-2012.
7. From the Engineer-in-Chief, Irrigation, Hyderabad Letter No.
ENC(I)/DCE.IV/OT(GDS)/AEE.2/1421/6911 Rabi 2011-12,
dt. 25-02-2012.
8. Commissioner CAD Note No. nil, dt. 15-03-2012.
9. Govt. Memo No. 7774/Drainage.2/2011-5 dt. 23-11-2011.
---
ORDER:
In the G.O. Rt. No.87 dt. 25-01-2012 respective Water User
Associations (WUAs), Distributory Committees (DCs) and Project Committees
(PCs) were permitted to incur expenditure for cross bunding of drains, oil
charges for pumping and weed removal from canals, to enable raising of Rabi
crop in water scarcity situation The SE, Dowlaiswaram and the District
Collector, East Godavari proposed to allow these works up to an amount of
Rs.876.36 lakhs while sanctioning these works, the Collector and SE
(Irrigation) were asked to exercise caution as the amount of plough back funds
available from the previous year was only Rs.3.33 crores.
2. In the meanwhile, farmers from East Godavari District have represented
to the Hon’ble Minister(M&MI) during his visit to the East Godavari District
on 6th and 7th of February 2012 regarding difficulty experienced by them to
save Rabi crop. The Engineer-in-Chief, Irrigation, Hyderabad in his letter
dt. 25-02-2012, has sought approval of the following:
PTO-2-
a) for weed removal and deployment of staff at a cost of Rs. 160.86 lakhs.
b) for lifting of water through electrical motor and diesel pumps at Goppirevu
of Kajuluru(M) at a cost of Rs. 36.25 (3.27 + 32.98) lakhs to supplement
tail end ayacut of 3,400 acres.
c) to release the funds of Rs. 607.95 (571.70 + 36.25) lakhs from other source
and to recover the same from future water tax collections.
d) to form cross bunds on canals to avoid entry of water into closed canals
and arrest leakages.
3. In the meanwhile, Office of the Commissioner, CAD has furnished
following data about the water tax collection and utilization from East
Godavari District for the years 2008-09, 2009-10 and 2010-11. The
Commissioner, CAD has also furnished the information about LOC released
against the water tax collection. Government in G.O.Rt.No.87 dt. 25-01-2012
sanctioned annual maintenance of drains in Godavari Delta by meeting the
expenditure from Plough Back Funds. The following table shows year wise
water tax, LOCs released by Commissioner, CAD and amount sanctioned at
Government level for East Godavari Dist.
79% Plough
back funds as LOC Sanctioned Total Balance
Water
per GOMs released by Govt. Plough plough
Tax
No.170, by towards back back
Collecti
Year I&CAD Commr. maintenanc funds funds
on
(General-IV- CAD e of drains utilized available
(Rs.
1) Dept., dt. (Rs. (Rs. (Rs. (Rs.
Crores)
14-10-2008 Crores) Crores) Crores) Crores)
(Rs. Crores)
2008-09 48.15 38.03 2.32 0 2.32 35.71
2009-10 19.21 15.17 5.11 0 5.11 10.06
2010-11 5.78 4.56 4.23 1.97 6.20 -1.64
Total 73.14 57.76 11.66 1.97 13.63 44.13
4. Thus enough savings from Plough Back Funds of previous years are
available to meet the cost of cross bunding, pumping and weed removal
described in table under para 3 of G.O.Rt. No.87, dt.25-01-2012.
5. The Government, after careful examination of the matter, in partial
modification of para 8 of the said G.O. 6th read above, hereby clarify that the
District Collector, East Godavari District and Superintending Engineer,
Irrigation Circle, Dowlaiswaram can permit the respective Water User
Associations, Distributory Committees(DCs) and Project Committees(PCs) to
incur expenditure up to the limit as was proposed in the table i.e., up to
Rs.876.36 lakhs, towards cross bunding, pumping, weed removal etc., in order
to save the Rabi crop.
…3…-3-
6. Since unutilized Plough Back Funds are available, Government hereby
allow the respective Farmer Organizations to incur expenditure for pumping
from Goppirevu of Kajuluru(M) to supplement tail end ayacut of 3,400 acres
subject to a limit of Rs. 36.25 (3.27 + 32.98) lakhs. Government also permit the
Engineer-in-Chief, Irrigation, Hyderabad for cross bunding on canals to avoid
entry of water into closed canal and to arrest leakages.
7. This order issues with the concurrence of the Finance (Exp.PW) Dept.,
vide their U.O. No. 8373/340/a1/ Exp.PW-12, dt. 28-03-2012.
(BY ORDER AND IN THE NAME OF THE GOVERNMENT OF ANDHRA PRADESH)
Dr. Prasanta Mahapatra
Principal Secretary to Government
To
The Engineer-in Chief, Irrigation, Hyderabad.
The Commissioner, CADA, I&CAD Dept.
The Collector, East Godavari District, Kakinada.
Copy to:
The Superintending Engineer, Irrigation Circle, Dowlaiswaram, E.G. District.
The Engineer-in-Chief, General, Hyderabad.
The Director of Treasuries and Accounts, Hyderabad for necessary action.
The O.S.D to Hon’ble Minister for Major & Medium Irrigation.
The O.S.D to Hon’ble Minister for M.I. APSIDC, LI, GWD &WALAMTARI.
The P.S. to Prl. Secretary to Govt.(I), I&CAD Dept.
SC/SF.
//Forwarded::By Order//
SECTION OFFICER