See Full Document Text
GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
Medium Irrigation β Rallapadu Project-Prakasam District - Extension of Left
Main canal of Rallapadu Project in Lingasamudram (M) Prakasam District -
Administrative approval accorded -Orders-Issued.
--------------------------------------------------------------------------------------
IRRIGATION & C.A.D.(PW. M&MI-R1) DEPARTMENT
G.O.Ms.No. 24 Dated:30-03-2012.
Read the following:-
1) G.O.Ms.No.106 I&CAD(P.W.Maj.Irr.II)Dept, dated 01.06.2006
2) From the Engineer-in-Chief, Medium Irrigation, Hyderabad
Lr.No.ENC/Med.DCE-III/OT3/AEE/Rallapadu/09dt. 25.5.2011
3) From the Engineer-in-Chief , Medium Irrigation, Hyderabad
Lr.No.ENC/Med.DCE-III/OT3/AEE/Rallapadu/09 dated: 28.07.2011.
4) From the Engineer-in-Chief, Medium Irrigation, Hyderabad
Lr.No.ENC/Med.DCE-III/OT3/LMC/RP/11 dated:17.11.2011.
,
O R D E R:
In G.O. first read above, administrative approval was accorded for
Rs.160.00 crores for extension of the North Feeder Channel of Somasila
Project to feed Rallapdu Reservoir in Prakasam district for stabilization of the
total ayacut of 40,000 acres.
2. The Engineer-in-Chief, Medium Irrigation, Hyderabad through his
letters in references 2nd, 3rd and 4th read above has submitted proposals for
extension of Left Main canal for the following reasons.
i. The JICA have communicated concurrence for taking up the above
Medium Irrigation Project for Modernization under APILIP. Hence
Modernization of Rallapadu Medium Irrigation Project has been taken
up for Modernization under APILIP with JICA loan assistance.
ii. The head sluice of Rallapadu Left Main canal already constructed
to discharge 100 cusecs of water to irrigate full ayacut of 4,000
acres. At present the left main canal water carrying capacity is
only 30 cusecs to irrigate 1,500 acres of existing ayacut. As
such the left main canal section is to be increased to carry 100
cusecs of water duly extending it from km.3.00 to km 15.875
km to irrigate its full ayacut of 4,000 acres to stabilize a total
ayacut of 40,000 acres under Rallapadu reservoir.
iii. By the time the work of extension of left main canal of Ralapadu
project is taken up and completed, the work of extension of
North Feeder canal of Somasila Project beyond km.72.42 to
km.104.50 will also be completed so that, the Rallapadu project
can receive 1.50 TMC of water and the stabilization of total
ayacut of 40,000 acres under this project can be achieved. As
such the purpose of taking up extension of left main canal of
Rallapadu project will be served.
P.T.O.// 2 //
3. In view of the above circumstances, the Engineerβin- Chief, Medium
Irrigation, Hyderabad has requested the Government to accord
administrative approval for an amount of Rs 2144.00 Lakhs (Two Thousand
One Hundred and Forty Four Lakhs only) for taking up the work β Extension
of Left Main canal of Rallapadu Project in Lingasamudram (M) of Prakasam
District from Km 3.00 to Km 5.875β to irrigate its full ayacut of 4,000 acres
to stabilize a total of 40,000 acres under Rallapadu reservoir .
4. After careful examination of the above proposal, Government hereby
accord in principle administrative approval for an amount of Rs. 2144.00
Lakhs (Rupees Two Thousand One Hundred and Forty Four Lakhs only) for
taking up the work βExtension of Left Main canal of Rallapadu Project in
Lingasamudram (M) of Prakasam District from Km 3.00 to Km 15.875 as per
details annexed. The Engineer-in-Chief, Medium irrigation, Hyderabad is also
directed to propose for Stage-I sanction in the first instance since survey ,
Investigation, Designing and Land Acquisition are involved in the project.
5. The expenditure for the work sanctioned in Para (4) above shall be
debited to the head of account βMH 4701 -03 Medium Irrigation M &MI βMH-
195 Rallapadu βGH11- Normal State Planβ.
6. This order issues with the concurrence of Finance (Expr.P.W)
Department vide their U.O.No:31347 β A / 972 / A 1 / Expr.P.W / 11
dt.05.01.2012.
(BY ORDER AND IN THE NAME OF THE GOVONER OF ANDHRA PRADESH)
RAJIV RANJAN MISHRA
PRNCIPAL SECRETARY TO GOVERNMENT
To,
The Engineer-in-Chief, Medium Irrigation, Hyderabad.
Copy to:
The CE, NTR TGP, Srikalahasti
The CE(P),Ongole
The Finance (Expr.W.& P) Department.
The Accountant General, A.P., Hyderabad.
The Director of Works & Accounts, Hyderabad.
P.S. to Prl. Secretary to C.M.
P.S. to Minister for Major & Medium Irrigation.
P.S. to Principal Secretary to Govt. (RRM).
SF
SECTION OFFICERANNEXURE to G.O.Ms.No. 24 Dt.30. 03.2012
Sl Description of item No Cost of each Total amount
N s structure in in Rs.
o. Rs.
1 Earth work excavation 1 4,17,85,695 4,17,85,695
2 Construction of Superpasages at Km 4 13,23,750 52,95,000
6.725,7.275,9.435 and km 11.885
3 Construction of Aqueduct at Km 3 57,62,611 1,72,87,833
4.450,6.175 and km 8.375
4 Construction of SLB at Km 9 10,10,195 90,91,755
1.600,5.475,7.825,8.670,9.260,10.735,
11.260,14.450 and km 15.100
5 Construction of DROP at km 5 1,77,094 8,85,470
12.500,13.275,13.700 and km 14.000
6 Construction of Pipe Culvert at km 1 6,05,824 6,05,824
13.304
7 Construction of Syphon at km 3 7,17,289 21,51,867
5.016,13.850 and km 14.885
8 Construction of OT sluices @Km 26 1,75,495 45,62,870
3.7,6.275,12.300,13.675,1.810,1.911,2
.411,2.550,3.100,4.000,4.275,5.125,8.
000,12.475,13.200,14.300 and km
15.000
9 Construction of Tail End Dam at km 1 77,769 77,769
15.875
10 Earth work excavation for connection 1 7,74,398 7,74,398
of four tanks from off take sluices at
km 3.000,6.400,12.475 and 13.675
11 Construction of Structure ( pipe 1 2,91,583 2,91,583
culvert)
12 Laying Lining concrete for Canal bed 1 7,55,15,794 7,55,15,794
and side slopes from km 0.00 to km
15.875
13 Widening of left Main canal of 2,19,47,662 2,19,47,662
Rallapadu project for carrying 100
cusec from 0 to 3 Km
14 Land acquisition for private lands 1 2,36,00,000 2,36,00,000
II L.S.Provisions
1 Provision for VAT @4% 81,54,941
2 Provision for Labour Cess @1.00% 20,38,735
3 Provision towards fixing of HP Boards 7,804
4 Provision for Bore Hole Data 2,00,000
5 Provision towards Tender process 1,25,000
including Tender Publication Charges,
preparation of Agreements etc.
Total Rs. 21,44,00,000