Parliament Question: Completion of Chennai-Bengaluru Expressway

Issued by ROAD TRANSPORT AND HIGHWAYS · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** This document is a response from the Minister of Road Transport and Highways to unstarred question number 222, dated January 29th, 2026, regarding the completion of the Chennai-Bengaluru Expressway. It addresses delays, land acquisition issues, and road safety concerns related to the expressway project, with a revised timeline for completion set for 2026. The response also outlines actions being taken to address the identified issues and maintain existing roads. **Key Points / Main Content** * **Sriperumbudur–Karapettai Six-Laning Project (NH-48):** * The project faced delays due to the termination of the BOT Concession Agreement in 2016 following defaults by the concessionaire. * Balance works were awarded in three separate packages. * EPC mode work was hindered by non-supply of Pond/Fly Ash needed for embankment. * 17.2 km has been completed, and the remaining 16.8 km was awarded through a fresh bidding process. * Work on the remaining portion commenced on January 27, 2025, with a scheduled completion in October 2026. 20% physical progress has been achieved. * **Chennai-Bengaluru Expressway (Tamil Nadu Portion):** * Phase-III of the Bangalore-Chennai Expressway, involving 106 Km (94 Km in Tamil Nadu and 12 Km in Andhra Pradesh) was taken up on Hybrid Annuity Mode (HAM) under 4 Packages. * Initial delays were due to land acquisition, utility shifting (including EHT lines/towers), railway clearances, and forest clearances, but these issues have been resolved. * Three packages (80.2 km) are approximately 90% complete and are expected to be finished by July 2026. * Work on the remaining package (25.5 km) has been stopped since May 2025 due to financial constraints of the concessionaire; a substitute concessionaire is being sought. * **Road Safety and Maintenance:** * The existing road is being maintained in traffic-worthy condition. * Traffic diversions are in place due to ongoing construction, causing some inconvenience. * Fresh overlay on the service road portion is complete to ensure smooth traffic flow. * All major crossroads are being provided with crossing structures (VUP, PUP, Flyover, Grade Separator) to facilitate safe pedestrian and vehicle crossing. * Locations identified as black spots due to repeated accidents are being provided with suitable crossing structures. **Impact Analysis** **Commuters/Road Users:** * **Impact:** Experience traffic diversions and potential inconvenience due to ongoing construction. However, they will benefit from improved road safety, smoother traffic flow, and reduced accident rates upon completion. * **Action Required:** Be aware of traffic diversions and construction activity, and exercise caution while traveling through the affected areas. **National Highways Authority of India (NHAI):** * **Impact:** Responsible for ensuring the timely completion of both projects within the revised timeline of 2026 and for overseeing the resolution of issues such as land acquisition and concessionaire substitutions. * **Action Required:** Continue monitoring project progress, address any remaining issues, and ensure the timely completion of the expressway projects. **BOT Concessionaire(s):** * **Impact:** One BOT Concessionaire has had their agreement terminated due to defaults, and a new concessionaire is being sought for the remaining package. * **Action Required:** The existing concessionaires should continue with work, while the remaining one must proceed to substitution process. **Local Communities:** * **Impact:** May face temporary inconvenience due to construction activities but will benefit from improved connectivity, reduced traffic congestion, and enhanced road safety upon project completion. * **Action Required:** No immediate action required, but awareness of construction and potential traffic disruptions is advised.

Key Entities Referenced

Chennai-Bengaluru Expressway: A major expressway project connecting Chennai and Bengaluru, with specific focus on land acquisition, utility shifting, and construction progress. National Highway-48: Specifically the Sriperumbudur-Karapettai stretch in Tamil Nadu, facing delays in its six-laning project. National Highways Authority of India (NHAI): The implementing agency for the highway projects mentioned, responsible for ensuring their completion. Tamil Nadu: The Indian state where a significant portion of the projects is located, particularly concerning land acquisition and construction delays. Build-Operate-Transfer (BOT): A mode of project implementation used for the NH-48 project, later facing issues with the Concessionaire.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO. 222 ANSWERED ON 29TH JANUARY, 2026 COMPLETION OF CHENNAI-BENGALURU EXPRESSWAY 222. DR. T SUMATHY ALIAS THAMIZHACHI THANGAPANDIAN: Will the Minister of ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन औि िाजमार्ग मंत्री be pleased to state: (a) whether the six-laning of the Sriperumbudur–Karapettai stretch of National Highway-48 (17 km) in Tamil Nadu costing rupees 341 crore has faced repeated delays following termination of contracts and if so, the details thereof; (b) whether the 106 km Tamil Nadu portion of the Chennai–Bengaluru Expressway is lagging due to issues relating to land acquisition, utility and railway line shifting, if so, the details thereof; (c) the steps being taken by the National Highways Authority of India (NHAI) to ensure completion of both projects within the revised timeline of 2026; (d) whether inadequate maintenance of the affected stretches has contributed to traffic congestion and accidents and if so, the details thereof; and (e) the details of corrective measures and timelines fixed to improve road safety and ease inter-city travel between Chennai and Bengaluru? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a) The work of six-laning of Sriperumbudur – Karaipettai section of NH-48 was part of 6-laning project of Poonamalle-Walajahpet section of NH-48 and taken up on Build-Operate-Transfer (BOT)-Toll mode in 2012. Due to defaults on the part of BOT Concessionaire, the Concession Agreement was terminated in 2016, and the balance works were awarded in 3 separate packages.The work of Sriperumbudur – Karaipettai section, taken up on EPC mode could not be completed mainly due to non-supply of Pond/Fly Ash at the site by the Thermal Power Plants as it was required for embankment of the scope of the work related to construction of approaches of crossing structures, viz. Vehicular Underpasses (VUPs), Pedestrian Underpasses (PUPs), Flyovers, etc. Out of total 34 Km, 17.2 Km has been completed and the balance work in 16.8 Km has been awarded through fresh bidding process at a cost of Rs.341.50 Crore on 07.11.2024. The work commenced on 27.01.2025 with scheduled completion in October 2026. As on date, 20% physical progress has been achieved. Efforts are being made to complete the project as per schedule. (b) & (c) Phase-III of Bangalore – Chennai Expressway, involving 106 Km (94 Km in Tamil Nadu and 12 Km in Andhra Pradesh) was taken up on Hybrid Annuity Mode (HAM) under 4 Packages. During the initial period of the work, there were issues relating to land acquisition, shifting of utilities, especially Extra High Tension (EHT) lines/towers, railway clearances, forest clearance, etc. All these issues have since been resolved and as on date, no such issue is pending. Out of total 4 packages, work is in progress in 3 packages (80.2 Km) with physical progress around 90% and likely to be completed by July 2026. Work in the remaining package (25.5 Km) has stopped since May 2025 due to financial constraints of the Concessionaire. Substituting the Concessionaire is under process. (d) & (e) The existing road is being maintained in traffic worthy condition. However, due to ongoing construction of structures, the traffic on the main carriageway is diverted through service road / diversion road causing inconvenience to the traffic. Fresh Overlay on the service road portion has already been completed for smooth movement of traffic. Further, along with 6-laning work, all major crossroads are provided with suitable crossing structures, viz. VUP, PUP, Flyover, Grade Separator, etc., which will facilitate safe crossing of pedestrians and vehicles across the NH. In the case of locations identified as Black Spots due to repeated accidents, are provided with suitable crossing structures. *****