Executive Summary & Key Takeaways

**Executive Summary** This document is a response to an unstarred question in Lok Sabha regarding the construction of bypass roads in Bihar. It provides details on bypass roads constructed in the last five years, the present status of ongoing projects, expected timelines, and allocated funds, as of February 5th, 2026. The information is organised in two annexures. **Key Points / Main Content** * **Completed Bypass Roads (Annexure-1):** * Details of bypass roads constructed on National Highways in Bihar during the last five years by the Ministry of Road Transport & Highways. * Information includes the name of the project, location, length, sanctioned cost, expenditure, completion date, and status (completed) for each project. * **Ongoing Bypass Roads (Annexure-2):** * Present status of ongoing bypass projects on National Highways in Bihar. * Information includes project name, location, length, sanctioned cost, expenditure, likely completion date, and physical progress. **Impact Analysis** **Ministry of Road Transport and Highways** *Impact:* The Ministry is responsible for reporting to the Lok Sabha on the progress of bypass road construction in Bihar. *Action Required:* The Ministry needs to ensure that the data provided is accurate and up-to-date. **National Highways Authority of India (NHAI)** *Impact:* NHAI is the implementing agency for these projects. *Action Required:* Continue executing ongoing projects as per the stipulated timelines and within the allocated budgets. **Citizens of Bihar** *Impact:* The construction of bypass roads will improve connectivity, reduce traffic congestion, and contribute to economic development in the state. *Action Required:* Citizens may need to remain informed about project timelines and potential disruptions during construction.

Key Entities Referenced

National Highways Authority of India (NHAI): The primary agency responsible for the development, maintenance and management of National Highways in India. Ministry of Road Transport and Highways: The Indian government ministry responsible for the formulation and administration of policies for road transport, national highways and transport research. Bihar: The Indian state where the bypass roads are being constructed. Lok Sabha: The lower house of India's Parliament, where the question regarding the construction of bypass roads in Bihar was raised. National Highways (NHs): The specific roads on which bypasses are being constructed.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO. 1131 ANSWERED ON 05TH FEBRUARY, 2026 CONSTRUCTION OF BYPASS ROADS IN BIHAR 1131. SHRI TARIQ ANWAR: Will the Minister of ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन औि िाजमार्ग मंत्री be pleased to state: (a) the details of bypass roads constructed in Bihar by the Government/National Highways Authority of India (NHAI) during the last five years including their length and location; (b) the present status of ongoing bypass road projects in the State; (c) the expected timelines for completion of each project; and (d) the funds allocated and utilised under each project ? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a) The details of bypasses constructed on National Highways (NHs) in the State of Bihar by the Government in the Ministry of Road Transport & Highways during the last five years including their length and location are at Annexure-1. (b) to (d) The present status of ongoing bypasses on NHs including timeline for completion of each project, sanctioned cost and funds utilized are at Annexure-2.ANNEXURE-1 ANNEXURE REFERRED IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 1131 FOR 05-02-2026 ASKED SHRI TARIQ ANWAR REGARDING CONSTRUCTION OF BYPASS ROADS IN BIHAR. Date of Sanction completio Length of Expenditu Sr Location ed Cost n/ Likely Name of Project Bypass re Status No. of Bypass (Rs in date of (Km) (Rs. In Cr) Cr) completio n 1 Sone 2.722 2 Ara 11.750 3 Koilwar-Bhojpur (Pkg- Bibiganj 1.100 1716.03 1673.39 31.05.2023 Completed 4 II) Gajrajganj 2.400 5 Bihiyan 2.000 6 Bilauthi 1.900 7 Shahpur 7.970 8 Brahmpur 1.900 1737.83 9 Bhojpur-Buxar (Pkg-III) Bhojpur Old 1.900 1763.41 22.06.2023 Completed Bhojpur 10 2.900 New Bakhtiyarpur Mokama Bakhtiyarpu 11 38.600 1898.84 1807.45 01.10.2025 Completed r 12 Bakra 1.600 Rajauli Bakhtiyarpur 3046.61 1617.78 20.01.2025 Completed 13 Sakrol 1.080 Hajipur Muzaffarpur 14 NH-22 Muzaffarpur 16.870 2906.78 2134.35 31.01.2026 Completed Two laning with paved 15 shoulder of Piprakothi–Motihari 4.150 Motihari- Raxaul section of NH-28A from km. 0.650 to km. 16 Chapwa 1.200 62.064 and construction of 2-lane with paved shoulder 475.86 466.43 30.01.2024 Completed from km. 62.064 to 68.650 and 4-lane with paved shoulder from 17 Raxaul 7.177 km. 68.650 to 69.241 ICP Raxaul Link Road (7.177 km. length) in the state of Bihar under NHDP Phase-III 4L of Forbesganj to Bathnala 18 2.646 Jogbani Section from Bypass Km. 0.000 to Km. 447.42 418.42 28.12.2023 Completed Pokharia to 19 9.260 (IPC at Jogbani) 2.594 Jogbani of NH-57A 4L from km. 34.600 to km. 79.970 & 2LPS Katihar 20 14.324 2579.19. 1624.91 27.06.2024 Completed from km. 79.970 to km. Bypass 82.000 of Narenpur -Purnea Section of NH- 131A 4/6 Six laning of Aunta- Simaria section of NH- Aunta to 21 8.150 1161.00 1161.00 31.01.2026 Completed 31 including Ganga Simaria Bridge 22 4-laning of Balance Patna 7.250 23 works of Patna - Gaya Pothi 2.262 -Dobhi section (Pkg-I) 24 from km 0.000 to km N Ne ae dm waa n/ 2.906 649.90 649.90 30.06.2024 Completed 39.000 of NH-22 (old 25 NH-83) Masaurhi 4.500 26 4 laning of Balance Jehanabad 8.900 27 works of Patna - Gaya Tehta 2.440 -Dobhi section (Pkg-II) 28 from km 39.00 to km. M ura khdump 4.770 496.10 492.25 29.05.2025 Completed 83.00 of NH-22 (old 29 NH-83) Belaganj 2.225 4 laning of Balance works of Patna - Gaya -Dobhi section (Pkg-III) Completed 30 Gaya 24.671 464.50 461.15 15.05.2025 from km 83.00 to km. 127.217 of NH-22 (old NH-83) (i) Km 40 to 79.4 of NH 104 (Sheohar – 31 Sitamarhi 9.200 278.54 235.98 29.08.2023 Completed Sitamarhi section (Lot- I) 32 Charaut 0.500 Up-gradation (km 79.4 33 to km 156.5) of NH 104 Sahargat 0.970 503.28 457.58 22.05.2023 Completed 34 of Sitamarhi – Jainagar Umgaon 1.100 section. (Lot-II) 35 Harlakhi 1.300 36 Up-gradation (km Jainagar 2.120 156.5 to 219.945) of NH 104 of Jainagar – 706.39 621.80 09.06.2023 Completed 37 Narahaiya 1.945 Narahia section. (Lot- III) 38 Km 0.0-km 69.6 of Barh 5.089 39 Fatua-Harnaut-Barh Daniyawa 2.160 828.45 813.75 31.05.2022 Completed section of NH-30A 40 Harnaut 3.667ANNEXURE-2 ANNEXURE REFERRED IN REPLY TO PART (b) to (d) OF LOK SABHA UNSTARRED QUESTION NO. 1131 FOR 05-02-2026 ASKED SHRI TARIQ ANWAR REGARDING CONSTRUCTION OF BYPASS ROADS IN BIHAR. Date of Length Sanctioned Expenditu completion Sr Location of Physical Name of Project Cost re / Likely No. of Bypass Bypass Progress (Rs in Cr) (Rs. In Cr) date of (Km) completion 1 Neoraganj 1.200 2 Painal 1.750 Danapur Bihta 2625.40 1140.94 31.08.2027 42.82% 3 Kanhauli 1.700 4 Vishunpura 0.600 Widening with additional 3L abetting Chhapra 5 Bypass Section of Chhapra 16.050 528.48 140.15 30.08.2026 45.12% NH-19 from Km. 143.200 to Km. 159.255 Rehabilitation and up-gradation of Chorma-Bairgania section of NH-227F from Design Chainage Km 00.00 Dhaka 6 to Km 34.556 to 1.735 393.11 288.90 28.02.2026 96.12% Bypass Two Lanes with paved shoulders under Bharatmala Pariyojna Phase-1 on Hybrid Annuity Mode (HAM) Rehabilitation, Up- 7 Basopatti 4.050 gradation and Construction of Two Malmal & 8 Lane with Paved 6.429 Kaluahi Shoulder of Selected road Uchait, 9 stretches from 5.455 Benipatti Hatwaria near Umagaon Junction 10 {Design Km. 0.000} Madhubani 15.000 1224.28 101.00 01.07.2027 8.25% to Kaluahi {Design Km. 21.609} (Section-I) NH- 227L, Saharghat {Design Km. 0.000} Rahua 11 to Rahika{Design 1.620 Sangram Km. 26.130} (Section-II) NH- 227J, Rahika {Design Km. 0.000}to Rampatti {Design Km. 15.000} Madhubani Bypass (Section-III) NH- 527A & Bideshwarsthan {Design Km. 0.000} to Bheja {Design Km. 25.915} (Section-IV) NH- 527A, Total length of 88.655 Km. under BRT Scheme Bharatmala Pariyojna Phase-I on HAM Mode Rehabilitation, Up- gradation and Construction of Two Lane with paved Shoulder of Selected Road stretches from Bakaur to Parsarma Section-l (Design km. 13.300 to km 18.875) NH-527A, Parsarma to Bariyahi Section-II 12 (Design Km 0.000 toB angaon 3.820 551.51 68.00 31.03.2026 98.40% km 24.068) NH-327E, Bangaon Bypass Section-III (Design km 0.000 to 3.820) & Mahishi Spur Road Section IV (Design km 0.000 to km 5.720) under BRT Scheme Bharatmala Pariyojna Phase-I on HAM Mode Pkg-V Purnea 13 Maheshkunt- 4.800 Bypass Saharsa-Purnea Murliganj 14 section from Km. 4.250 1244.09 1104.10 31.03.2026 89.12% Bypass 90+000 to Km. Madhepura 15 177+960 of NH-107 11.350 Bypass Sonbarsa 16 2.700 Raj Simri 17 NH-107 Pkg-1 Bakhtiyarpu 3.500 644.50 523.66 31.08.2026 85.65% r Bariahi & 18 11.000 saharsa Four Lane Arrah Bypass (Asani to Baonpali) from Km Asani to 19 0+000 to Km 4+500 4.500 67.00 0.00 06.04.2027 1.00% Baonpali (Design Chainage) of NH-319 (Old NH- 30) on EPC ModeSix Laning of Aurangabad Bihar- Jharkhand Border (Chordaha) section of NH-2 from 20 Madanpur 2.895 520.00 65.25 Dec-2026 16.21% 180+000 to 209+827 Package-I under Bharatmala priyojna on EPC mode. Construction of proposed 4_Lane Revelgunj bypass Revelgunj 21 7.155 295.24 135.80 31.05.2026 73.01% NH-19 on EPC bypass mode connecting NH 19 to 85 origin. Geometric improvement of NH- 327E at Raniganj 22 Bhargama and 3.884 119.99 65.44 31.07.2026 67.20% Bypas Sukela More including provision of Raniganj Bypass Construction to 2 lanes with Paved Shoulder of Jandaha 23 Jandaha Bypass of 4.800 47.43 9.81 15.07.2026 38.00% Bypass NH 103(NH-322) in CH 0.000 (existing Km 35 of NH-103) Construction of Four-Lane of Chausa-Buxar Chausa- 24 Bypass from Km Buxar 20.915 1060.16 8.34 13.01.2028 0.00% 45.000 to Km Bypass 65.915 (Package - 2) on EPC Mode. Construction of 4 25 Katoria 1.797 no. of Bypasses at Katoria, Lakhpura, 26 Lakhpura 2.486 Banka & Panjwara 27 (total length-14.359 Banka 7.131 Km) to two lane with paved 479.37 40.83 08.12.2026 22.00% shoulders standard Pre-Construction 28 activities from Km Panjwara 2.945 134.000 to Km 190.233 of NH- 333A Improvement to two lane with paved shoulders of NH-Mohania 29 2.350 427.29 251.02 26.07.2026 92.00% 319A from km 0 to km 45 under EPC modeImprovement and Up gradation to four 30 Mairwa 6.260 lane with Paved shoulder configuration from Existing Km 0+000 to Km 39+500 (design km (0+500) 1661.25 95.04 05.03.2028 1.71% to Km 40+342, 31 Design length km) Siwan 6.982 of NH – 227A ( near Mehrauna Ghat(UP – Bihar Border) to Siwan on Hybrid Annuity Model Construction of Bhabhua Bypass 32 from Ch. Bhabhua 7.350 10+800(Design Ch. 10+800) to Ch. 19+860 (Design Ch. 18+150) and Chand Bypass from Ch. 38+060 (Design Ch. 36+250) to Ch. 40+460 (Design Ch. 38+650) and 179.86 28.89 03.07.2026 0.05% widening of existing road to 2 - lane with 33 Paved shoulder Chand 2.400 from Ch. 40+460 (Design Ch. 38+650) to Ch. 46+860 (Design Ch. 45+050) of NH-219 (Total length- 16.150 Km)under EPC mode Widening from 2- lane to 4- lane of km 92.935(starting point of old NH 82) to 99.685 km ( End 34 Gaya 6.750 63.37 18.45 31.05.2026 52.00% Point of Gaya Bypass of NH- 33) of NH – 120( Total Length = 6.750 km) on EPC mode 35 Manpur 3.970 Four Laning of 36 Gaya Hisua-Rajgir-Wajeerganj 4.670 37 Nalanda-Biharsharif Tungi 1.900 2138.16 1744.77 30.06.2026 97.00% 38 Section Km 0.00 to Hisua 1.323 92.935 on NH-82 39 Nardiganj 2.300 *****