GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO. 3264 ANSWERED ON 12TH MARCH, 2026 CONSTRUCTION OF ROADS IN NAXAL-AFFECTED AREAS 3264. SHRI MAHESH KASHYAP: Will the Minister of ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन औि िाजमार् ग मंत्री be pleased to state: (a) the number of roads approved and completed in Chhattisgarh under the Bharatmala Pariyojana; and (b) the specific policy formulated to address the obstacles being faced during road construction in Naxal-affected areas? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a) The details are annexed. (b) The primary reasons for delay in National Highway (NH) projects in various State including in the State of Chhattisgarh are issues / bottlenecks relating to land acquisition, delay in getting statutory clearances / permissions, utility shifting, encroachment removal, non-availability of construction material / minerals, poor performance of Contractor / Concessionaire, and Force Majeure events like Covid-19 pandemic, heavy rainfall, floods, cyclone, landslides / avalanches, etc. To expedite project execution, various initiatives have been undertaken. These include streamlining and expediting the land acquisition process through Bhoomi Rashi portal, revamping the Parivesh Portal through Ministry of Environment, Forests and Climate Change to expedite forest and environmental clearances, enabling online approval of General Arrangement Drawings (GAD) for Road over Bridges (ROBs) and Road under Bridges (RUBs) from the Railways, and conducting review meetings at various levels with all stakeholders, including State Governments.ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 3264 ANSWERED ON 12TH MARCH, 2026 ASKED BY SHRI MAHESH KASHYAP, REGARDING ‘CONSTRUCTION OF ROADS IN NAXAL-AFFECTED AREAS’. Completed Total Total Sr. Length (in Project Name of Project Length Current Status km) Cost (in No. (km.) Cr.) 4-laning of Bilaspur- Urga section of NH- 130A from km.0.000 to Substantially 1 70.200 69.015 1855.59 km.70.200 under completed Bharatmala Pariyojana on HAM Mode 4-laning of Pathalgaon- Kunkuri-CG/JH border section of NH-43 from Awarded, 2 km.0.000 to 104.250 0.00 3147.07 Appointed date km.104.250 under to be declared Bharatmala Pariyojana on HAM Mode 6-laning of Jhanki-Sargi from Km.0+000 to Provisional Km.42+800 under Completion 3 Raipur-Visakhapatnam 42.800 40.82 1368.19 Certificate (PCC) Bharatmala Pariyojana issued w.e.f. in the State of 27.12.2024 Chhattisgarh (CG-1) 6-laning of Sargi- Basanwahi from Km.42+800 to Km.99+500 under PCC issued 4 56.700 56.70 1470.73 Raipur-Visakhapatnam w.e.f. 08.04.2025 Bharatmala Pariyojana in the State of Chhattisgarh (CG-2) 6-laning of Basanwahi- Marangpuri from Km.99+500 to Under 5 25.161 10.55 1307.16 Km.124+661 under Construction Raipur-Visakhapatnam Bharatmala Pariyojanain the State of Chhattisgarh (CG-3) 6-laning of Durg – Raipur bypass from km 0.000 to 44 +500 of NH Under 6 44.500 32.40 1072.99 – 53 Mumbai-Kolkata Construction corridor (Pkg-I) (Bhatarmala Division) 6- laning of Durg-Raipur bypass from km 44+500 to km 92+230 47.730 Under 7 of NH- 53 Mumbai- 37.12 1216.23 Construction Kolkata corridor (Pkg- II) (Bhatarmala Division) 4-Laning of Bilaspur- Pathrapali section from Completed 8 Km 0.00 to Km. 53.300 53.30 53.30 1261.05 ( 13.07.2023) of NH-111 (New NH 130) under HAM Mode 4-Lane with paved shoulder configuration PCC issued on of Pathrapali-Katghora 16.06.2023 for 9 of NH-111 from Km 39.300 37.02 865.1 31.08 Km. & 53+300 to Km. 92+600 Revised date of under HAM Mode competition is 31.03.2026 *****

Continue your research