GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 3264
ANSWERED ON 12TH MARCH, 2026
CONSTRUCTION OF ROADS IN NAXAL-AFFECTED AREAS
3264. SHRI MAHESH KASHYAP:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार् ग मंत्री
be pleased to state:
(a) the number of roads approved and completed in Chhattisgarh
under the Bharatmala Pariyojana; and
(b) the specific policy formulated to address the obstacles being
faced during road construction in Naxal-affected areas?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)
(a) The details are annexed.
(b) The primary reasons for delay in National Highway (NH)
projects in various State including in the State of Chhattisgarh are
issues / bottlenecks relating to land acquisition, delay in getting
statutory clearances / permissions, utility shifting, encroachment
removal, non-availability of construction material / minerals, poor
performance of Contractor / Concessionaire, and Force Majeure
events like Covid-19 pandemic, heavy rainfall, floods, cyclone,
landslides / avalanches, etc. To expedite project execution, various
initiatives have been undertaken. These include streamlining and
expediting the land acquisition process through Bhoomi Rashi
portal, revamping the Parivesh Portal through Ministry of
Environment, Forests and Climate Change to expedite forest and
environmental clearances, enabling online approval of General
Arrangement Drawings (GAD) for Road over Bridges (ROBs) and
Road under Bridges (RUBs) from the Railways, and conducting
review meetings at various levels with all stakeholders, including
State Governments.ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA
UNSTARRED QUESTION NO. 3264 ANSWERED ON 12TH MARCH, 2026
ASKED BY SHRI MAHESH KASHYAP, REGARDING ‘CONSTRUCTION OF
ROADS IN NAXAL-AFFECTED AREAS’.
Completed Total
Total
Sr.
Length (in Project
Name of Project Length Current Status
km) Cost (in
No.
(km.)
Cr.)
4-laning of Bilaspur-
Urga section of NH-
130A from km.0.000 to Substantially
1 70.200 69.015 1855.59
km.70.200 under completed
Bharatmala Pariyojana
on HAM Mode
4-laning of Pathalgaon-
Kunkuri-CG/JH border
section of NH-43 from Awarded,
2 km.0.000 to 104.250 0.00 3147.07 Appointed date
km.104.250 under to be declared
Bharatmala Pariyojana
on HAM Mode
6-laning of Jhanki-Sargi
from Km.0+000 to Provisional
Km.42+800 under Completion
3 Raipur-Visakhapatnam 42.800 40.82 1368.19 Certificate (PCC)
Bharatmala Pariyojana issued w.e.f.
in the State of 27.12.2024
Chhattisgarh (CG-1)
6-laning of Sargi-
Basanwahi from
Km.42+800 to
Km.99+500 under PCC issued
4 56.700 56.70 1470.73
Raipur-Visakhapatnam w.e.f. 08.04.2025
Bharatmala Pariyojana
in the State of
Chhattisgarh (CG-2)
6-laning of Basanwahi-
Marangpuri from
Km.99+500 to Under
5 25.161 10.55 1307.16
Km.124+661 under Construction
Raipur-Visakhapatnam
Bharatmala Pariyojanain the State of
Chhattisgarh (CG-3)
6-laning of Durg –
Raipur bypass from km
0.000 to 44 +500 of NH Under
6 44.500 32.40 1072.99
– 53 Mumbai-Kolkata Construction
corridor (Pkg-I)
(Bhatarmala Division)
6- laning of Durg-Raipur
bypass from km
44+500 to km 92+230 47.730
Under
7 of NH- 53 Mumbai- 37.12 1216.23
Construction
Kolkata corridor (Pkg-
II) (Bhatarmala
Division)
4-Laning of Bilaspur-
Pathrapali section from
Completed
8 Km 0.00 to Km. 53.300 53.30 53.30 1261.05
( 13.07.2023)
of NH-111 (New NH
130) under HAM Mode
4-Lane with paved
shoulder configuration PCC issued on
of Pathrapali-Katghora 16.06.2023 for
9 of NH-111 from Km 39.300 37.02 865.1 31.08 Km. &
53+300 to Km. 92+600 Revised date of
under HAM Mode competition is
31.03.2026
*****