The Ministry of Tribal Affairs addresses unstarred question number 1110 concerning Eklavya Model Residential Schools (EMRSs) in rural and remote tribal areas, answered on February 5, 2026.
EMRSs are established in blocks with over 50% Scheduled Tribe (ST) population and at least 20,000 tribal residents (based on the 2011 census) to offer quality education. Land identification lacks a specific timeframe, but State Governments are urged to expedite land provision. The total construction time for an EMRS is 24 months for plain areas and 30 months for LWE/Hilly/NE areas after the State Government provides encumbrance-free land. The State Governments are running EMRSs from rented and other government buildings, where construction of the permanent campuses is not complete.
Key Entities Referenced
Eklavya Model Residential Schools (EMRS): Scheme to set up residential schools in tribal-dominated areas.
Ministry of Tribal Affairs: Central ministry responsible for the EMRS scheme.
GOVERNMENT OF INDIA
MINISTRY OF TRIBAL AFFAIRS
LOK SABHA
UNSTARRED QUESTION NO. 1110
TO BE ANSWERED ON 05.02.2026
EMRSs IN RURAL AND REMOTE TRIBAL AREAS
†1110. DR. FAGGAN SINGH KULASTE:
Will the Minister of TRIBAL AFFAIRS be pleased to state:
(a) whether the Government is setting up Eklavya Model Residential Schools (EMRSs) in tribal-dominated
rural and remote areas;
(b) if so, the stipulated timeframe right from land identification to completion of construction for sanctioned
EMRSs;
(c) whether it is a fact that students are being accomodated and studying in rented or temporary buildings
due to incomplete construction in many rural areas;
(d) if so, the provision of average timeframe within which the permanent buildings for such schools are
expected to be completed and the schools made fully operational; and
(e) whether any specific timeframe or guidelines have been laid down to limit timeline for operation of
EMRSs operating in rented or temporary buildings?
ANSWER
MINISTER OF STATE FOR TRIBAL AFFAIRS
(SHRI DURGADAS UIKEY)
(a) & (b) As per existing Eklavya Model Residential Schools (EMRS) scheme guidelines, EMRSs are set up
in blocks having more than 50% ST population and at least 20,000 tribal persons (as per census 2011) to
provide quality education to tribal students in their own environment. Under the scheme, there is no
stipulated timeline for identification of land, however State Governments are regularly requested to provide
land on urgent basis. The total construction period of EMRS is 24 months for plain area and 30 months for
LWE/Hilly/NE areas after encumbrance free land is provided by the respective state government.
(c) to (e) The State Governments are currently running some of the EMRSs from rented and other
government buildings, where construction of the permanent campuses is not complete.
*****