See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF HOUSING AND URBAN AFFAIRS
RAJYA SABHA
UNSTARRED QUESTION NO. 3402
ANSWERED ON 23/03/2026
GAPS IN URBAN AFFAIRS AND DEVELOPMENT FOR NEXT-GENERATION DESIGN
PRINCIPLES
3402. SHRI I.S. INBADURAI:
Will the Minister of HOUSING AND URBAN AFFAIRS be pleased to state:
(a) whether Government has undertaken any comprehensive study to identify structural and
infrastructural gaps in urban planning, housing, transport, waste management and public utilities in
major cities and emerging towns, if so, details thereof;
(b) whether existing urban development schemes adequately incorporate next-generation design
principles such as climate resilience, smart infrastructure, inclusive public spaces and sustainable
mobility, if so, details thereof and assessment outcomes; and
(c) whether Government proposes to strengthen coordination between urban local bodies, State
Governments and central agencies to bridge gaps in planning, execution and maintenance of urban
infrastructure, if so, details thereof?
ANSWER
THE MINISTER OF STATE IN THE MINISTRY OF HOUSING AND URBAN AFFAIRS
(SHRI TOKHAN SAHU)
(a) to (c): As per the provisions of Article 243W of the Constitution, in conjunction with the Seventh
and Twelfth Schedules, matters relating to urban development fall within the purview of States/Urban
Local Bodies (ULBs). However, Ministry of Housing and Urban Affairs (MoHUA) provides
programmatic support to the States/Union Territories (UTs) in their urban development agenda
through its various flagship Missions/Programmes viz. Atal Mission for Rejuvenation & Urban
Transformation 2.0 (AMRUT 2.0), Smart Cities Mission (SCM), Swachh Bharat Mission – Urban 2.0
(SBM – U 2.0), Pradhan Mantri Awas Yojana – Urban 2.0 (PMAY-U 2.0), Urban Transport (UT) etc.
Through these Missions/Schemes, the Central Government approves the State Plans and provides the
Central Assistance to the States. The projects are selected, designed, approved and executed by the
States/UTs and the cities. The State Governments release funds to the cities/districts.
AMRUT 2.0: The Mission was launched in the year 2021 in all ULBs/cities, enabling the cities to
become 'self-reliant' and 'water secure'. Providing universal coverage of sewerage and septage
management in 500 AMRUT cities is one of the major focus areas of AMRUT 2.0. Water body
rejuvenation and green spaces and parks are other components of the Mission. Under the Mission,
States/UTs are empowered to select, appraise, prioritize and implement projects.
Under AMRUT 2.0, cities have prepared City Water Balance Plans (CWBPs), which include as-is
assessment of water supply systems which help cities/ ULBs to identify gaps. CWBP help cities to
identify scope for projects focusing on the objectives of Mission. Based on the projects identified in
CWBPs, City Water Action Plan (CWAP) are devised. These CWAPs are aggregated in the form of
State Water Action Plans (SWAP). Further, the State High Powered Steering Committee (SHPSC)
headed by the Chief Secretary of the State, consider and recommend/ approve the SWAPs under
AMRUT 2.0. State Level Technical Committee (SLTC) headed by the Secretary, Urban Development
& Housing Department provides technical support to the SHPSC in approving, monitoring and
supervising the scheme at the State level.
For digital monitoring, energy efficiency and emergency preparedness, the Mission promotes the
adoption of smart elements/ Supervisory Control and Data Acquisition (SCADA) based operations.
SCADA-based systems are promoted for real-time monitoring and control, improving fault detection,
pressure management, and emergency response. Energy-efficient pumping and automation enhance
system reliability. Under AMRUT, 258 water supply schemes have been implemented with SCADA.
Under AMRUT 2.0, 1,422 water supply projects have provision for SCADA system.
…2/--2-
The Ministry has published Manual on Water Supply and Treatment Systems (Drink from Tap) in
March 2024 (https://mohua.gov.in/publication/manual-on-water-supply-and-treatment-systems---
drink-from-tap---march-2024.php), for reference by the States/ ULBs for designing and
implementation of the water supply projects. The manual has a Chapter on “Building Resilience for
Climate Change and Disaster Management”, which provides for resilience measures to be adopted by
Urban Water Service Providers. The resilience measures for adoption by the Urban Water Service
Providers include intake from different sources of water (surface, groundwater, etc.), enhancing water
storage capacity, treated wastewater reuse and functional flow meters alongside consumer end
metering for all water supply sources, treatment plants, and water distribution stations.
SBM-U: Sanitation is a State subject. It is the responsibility of State/ULBs to plan, identify structural
and infrastructural gap, design and execute sanitation projects in the urban areas of the concerned
States/UTs.
MoHUA supplements the efforts of States/UTs by providing policy directions, financial and technical
support. Under Solid Waste Management component of SBM-U 2.0 Central Financial Assistance
(CFA) of fund are provided for setting up various type of municipal waste processing facilities such
as Material Recovery Facilities (MRFs), Waste to Compost (WtC) plants, Bio-methanation plants,
Refuse Derived Fuel (RDF) processing facilities, Waste to Electricity (WtE) plants, Construction and
Demolition (C&D) waste plants etc.
SBM-U leverages technology to enhance sanitation and waste management across urban India. The
selection of treatment technologies is open to ULBs/State Governments, allowing them to choose any
proven technology as outlined in the Central Public Health & Environmental Engineering
Organization (CPHEEO) Manual and advisories issued from time to time. States opt for different types
of waste processing facilities based on their resources, technology, topography, type of waste involved,
climatic conditions.
PMAY-U: Land' and 'Colonization' are State subjects. Therefore, schemes related to housing for their
citizens are implemented by States/UTs. However, MoHUA supplements the efforts of States/UTs, by
providing Central Assistance for pucca houses to eligible urban beneficiaries across the country under
PMAY-U since 25.06.2015. Based on the learnings from the experiences of implementation of PMAY-
U, MoHUA has revamped the scheme and launched PMAY-U 2.0 'Housing for All' Mission with effect
from 01.09.2024 for implementation in urban areas across the country to construct, purchase and rent
a house by eligible beneficiaries at affordable cost, for one crore additional eligible beneficiaries
through four verticals i.e., Beneficiary Led Construction (BLC), Affordable Housing in Partnership
(AHP), Affordable Rental Housing (ARH) and Interest Subsidy Scheme (ISS). PMAY-U 2.0
guidelines and Unified Web-portal for submitting the online applications can be accessed through
https://pmay-urban.gov.in.
The Technology Sub-Mission (TSM) under PMAY-U supports States/UTs in adopting modern,
innovative, green and alternative construction technologies for faster and quality housing. Under
TSM, Global Housing Technology Challenge - India (GHTC-India) was organized to identify and
mainstream globally proven, sustainable, disaster-resilient and prefabricated construction
technologies. A total of 54 proven technologies from across the world were shortlisted and grouped
into six categories based on geo-climatic regions for adoption by States/UTs, which are available at
www.ghtc-india.gov.in. These technologies were approved by the Technical Assessment Committee
and are time-tested. As per the Scheme Guidelines, an additional grant in the form of Technology
Innovation Grant (TIG) is also provided to AHP projects using innovative construction technologies
notified by MoHUA. States/UTs are encouraged to adopt these innovative construction technologies
identified by the Ministry as per their local context. Further, as per PMAY-U 2.0 Guidelines, there is
provision to ensure quality of construction under BLC/AHP/ARH verticals of the Mission through
Third Party Quality Monitoring Agencies (TPQMA) selected by States/UTs. TPQM Agencies are
required to visit the project site and to advise State/UT and ULBs on quality related issues.
…3/--3-
Urban Transport: Urban Transport is a part of Urban planning which is a State subject. Therefore,
respective State Governments are responsible for planning, execution and management of urban
transport system including identifying structural gaps in transport planning, maintenance of urban
infrastructure, etc. However, Government of India has issued National Urban Transport Policy, 2006,
Metro Rail Policy 2017, Transit Oriented Development (ToD) policy 2017 and other policy guidelines
for fare integration, planning of urban transport system. Under Metro Rail Policy, financial assistance
for metro rail projects is being provided and about 1,145 kms of metro rail lines are operational in 26
different cities. Also, under PM-eBus Sewa Scheme launched on 16th August 2023, 10,000 air-
conditioned e-buses have been sanctioned for 116 cities across 26 States/UTs along with central
assistance for development of associated infrastructure and bus operations to augment, formalize and
strengthen the public transport system.
*****