GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 6387
ANSWERED ON 02ND APRIL, 2026
GREENFILED HIGHWAY PROJECTS IN TRIBAL DISTRICTS
6387. SHRI DHAIRYASHEEL SAMBHAJIRAO MANE:
SHRI SUDHEER GUPTA:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) whether new greenfield highway projects/corridors are planned in tribal-
dominated aspirational districts across the country and if so, the details
thereof;
(b) the status of such projects/corridors especially in Lok Sabha
Constituency of Hathras in Uttar Pradesh, Mandsour in Madhya Pradesh and
Ichalkaranji Assembly Constituency in Maharashtra; and
(c) whether the Government is prioritizing highway roads with Electric
Vehicle (EV) infrastructure or solarized rest areas and if so, the details
thereof?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)
(a) The development of National Highways, including Greenfield corridors,
is undertaken in a planned and phased manner to improve connectivity
across all regions of the country, including tribal-dominated and aspirational
districts. Significant efforts have been made in recent years to enhance
connectivity in such areas, and the most tribal and aspirational districts have
been connected or are being connected to the high-speed corridor network
under various programmes such as Bharatmala Pariyojana and National
Highway (Original) NH(O) works.Some of the prominent Greenfield/high-speed corridors traversing tribal-
dominated and aspirational districts include: Durg–Raipur–Arang; Raipur–
Visakhapatnam; Raipur–Ranchi; Varanasi–Ranchi–Kolkata; Delhi–Mumbai
Expressway; Nashik–Solapur; Kadapa–Tirupati; and Bengaluru–Chennai
Expressway.
(b) The details are annexed.
(c) The Government envisages development of Wayside Amenities (WSAs)
at intervals of approximately 40–60 km along National Highways and
Expressways, subject to land availability and commercial viability. These
WSAs provide facilities such as eateries, toilets, drinking water, parking, fuel
stations, Electric Vehicle (EV) charging stations, and short-term
accommodation for road users, including truckers. Further, developers are
encouraged to incorporate solar-powered energy sources in such amenities.ANNEXURE REFERRED TO IN REPLY TO PART (b) OF LOK SABHA
UNSTARRED QUESTION NO. 6387 ANSWERED ON 02ND APRIL, 2026 ASKED
BY SHRI DHAIRYASHEEL SAMBHAJIRAO MANE AND SHRI SUDHEER GUPTA
REGARDING ‘GREENFILED HIGHWAY PROJECTS IN TRIBAL DISTRICTS’.
Sl. Name of project Name of Distri Type Len Total Status Remarks
No ct through wh of pro gth (cost (i
. ich project is ject in K n cr.)
passing m)
1 Four Laning of Agra A
ligarh section of NH-5
09 from km. 0.000 (Ju
Aligarh, Hathr
nction of NH-34 Aligar Appoint
as Green 1309.
h) to Km. 28.000 (Nea 28 ed Date -
In the State of field 08
r Asroi Village in Hath pending
UP
ras) in the state of
U.P.
2
Four Laning of Agra A
ligarh section of NH-5
09 from Km. 28.000 (
Near Asroi Village in
Hathras) to km. 65.11 Hathras, Agra Appoint
Green 37.1 1796.
In the State of ed Date -
9 (Junction of Yamun
field 19 23
a Expressway at Km. UP pending
151.50 in Khandauli,
Agra District) in the s
tate of U.P.
3 Access controlled Gr 3588 Already
Mandsaur (Pkg-1 Complet
eenfield Delhi-Mumbai
Green 102.
Expressway (NE-4) (leIn the State of 7,18 &ed in the -
field 4
MP 19 of year 202
ngth 102.4 Km.)
DME) 2-23
4 Four laning of Kolhap Kolhapur Brow 33.6 1192. Bids inviPart of the project lengt
ur (Shiroli) to Sangli (In the State of nfield/ 09 84 ted h of Kolhapur to Sangli
Ankali) Section of NH- Maharashtra Green is passing through Ichal
166 in the State of Ma field karanji Assembly Const
harashtra ituency in Maharashtra
State. Out of total lengt
h of 33.609 km, the Byp
asses (3.2km) & Realig
nment (4.9km) is propo
sed in Greenfield.
*****