NESIDS and PM-DevINE for Flood Control
5443. Md. Rakibul Hussain:
Will the Minister of DEVELOPMENT OF NORTH EASTERN REGION be pleased to
state:
(a) whether the Government proposes to strengthen flood management, erosion control
and riverbank protection measures in Assam in view of the recurring floods and large-scale
loss of land, livelihoods and public infrastructure;
(b) if so, the details of projects sanctioned under various Development of North Eastern
Region (DoNER) schemes including North East Special Infrastructure Development
Scheme (NESIDS) and Prime Minister's Development Initiative for North East Region (PM-
DevINE) for flood control and riverbank protection;
(c) the quantum of funds sanctioned and released to the said State Government or
implementing agencies for these projects; and
(d) the current status of implementation including projects completed, ongoing and delayed
along with reasons for delay, if any?
ANSWER
The Minister of State of the Ministry of Development of North Eastern Region
[Dr. Sukanta Majumdar]
(a) to (d): As per Ministry of Jal Shakti, flood management and anti-erosion schemes are
formulated and implemented by concerned State Governments as per their priority. The
Union Government supplements the efforts of the States by providing technical guidance
and financial assistance for management of floods in critical areas.Union Government is implementing a centrally sponsored "Flood Management and Border
Areas Programme (FMBAP)" for providing assistance to States including those of North
Eastern Region (NER) for works related toflood control, anti-erosion, drainage
development, anti-sea erosion, etc.
A total of 142 projects in Assam have been included under the Flood Management
Programme Component of FMBAP, of which 111 projects have been completed, providing
flood protection to around 7.36 lakh ha of land & benefitting a population of about 174.52
lakh. A total central assistance of Rs. 1582.54 crore has been released to the Government
of Assam under FMBAP since its inception and till March 2025.
Ministry of Development of North Eastern Region has supported a project named
“Protection of Majuli Island from Flood and Erosion of River Brahmaputra” and the work has
been completed at a cost of Rs. 207 crore.
Under the Schemes of North Eastern Council (NEC), 6 more projects related to flood
management, erosion control, and riverbank protection measures in Assam have been
funded with an estimated cost of Rs. 33.40 crore. List is at Annexure – A.
As per Ministry of Home Affairs, restoration and rejuvenation of wetlands to enhance their
water retention and to mitigate the risks of flooding and erosion, has been taken up in
Assam over around 5,900 sq. km of wetlands identified by NESAC and over 3,500
documented by the Assam Remote Sensing Application Center.
*****Annexure-A
Projects related to flood management, erosion control and river bank protection
measures in Assam supported under the Schemes of NEC
Sl. Name of Project Sanctioned Cost
No. (Rs. crore)
1 Controlling of Jiadhal river in Dhemaji district in Assam, Phase-I 14.94
2 Protection of Raimona Village and its adjoining area from the 3.74
erosion of River Janali, Assam
3 Anti-Erosion Measures to protect Ranipur and its adjoining area 3.43
from the erosion of river Pekua, Kokrajhar dist.
4 Anti-Erosion Measures at different reaches on both bank of river 2.28
Pomra
(Assam), Baska District
5 Anti-Erosion measure to protect villages of Uma Nagar upstream 4.05
and its Adjoining area from the erosion of river Gangia Kokrajhar
, Assam
6 Anti Erosion measures to protect BB of river Darranga at 4.96
different reaches, Baksa District, Assam
Total 33.40