GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 3440
ANSWERED ON 12TH MARCH, 2026
NHs in TAMIL NADU
3440. Shri Sachithanantham R:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) the details of the total length in kilometres and estimated cost
of National Highway (NH) works implemented by the Government in
Tamil Nadu during the periods 2014–19, 2019–24 and 2024–26 till
March, NH-wise;
(b) the number of toll plazas opened on National Highways in Tamil
Nadu during the above periods and the details of toll collection;
(c) the number of toll plazas in Tamil Nadu that have been handed
over to the National Highways Authority of India during the said
period and the toll rates and collection made thereof; and
(d) the present status of the proposed National Highway projects
from Dindigul to Karaikudi, Dindigul to Sabarimala and Dindigul to
Semmadaipatty?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)
(a) to (c) The details of length of National Highway works
implemented in the State of Tamil Nadu during the periods 2014–19,
2019–24 and 2024–26 (up to 28.02.2026) along with the estimated
cost, number of toll plazas opened, toll collection and the number of
toll plazas handed over to the National Highways Authority of India
along with toll collection are annexed.
(d) The present status of the National Highway projects from
Dindigul to Karaikudi, Dindigul to Sabarimala and Dindigul to
Semmadaipatty are annexed.ANNEXURE REFERRED TO IN REPLY TO PART (a) to (c) OF LOK
SABHA UNSTARRED QUESTION NO. 3440 ANSWERED ON 12th
MARCH, 2026 ASKED BY Shri Sachithanantham R REGARDING ‘NHs
in TAMIL NADU’.
Year Length Estimated No. of Toll No. of Toll Rate (₹) Toll
of NH Cost Toll Collectio Toll Collection
Works (₹ crore) Plazas n (₹ Plazas of Toll
impleme Opened crore) Handed Plazas
nted Over to Handed
(km) NHAI Over to
NHAI (₹
crore)
2014-818.35 12196.78 10 2401.59 - The user-fee -
19 rates for
2019-1537.06 29222.26 20 937.69 5 each 143.19
24 category of
vehicle will
be as per
National
Highways
Fee
(Determinati
on of Rates
and
Collection)
Rules, 2008
2024-442.65 13717.40 18 421.19 5 103.55
26
Total 2798.06 55136.44 48 3760.47 10 246.74ANNEXURE REFERRED TO IN REPLY TO PART (d) OF LOK SABHA
UNSTARRED QUESTION NO. 3440 ANSWERED ON 12th MARCH, 2026
ASKED BY Shri Sachithanantham R regarding ‘NHs in TAMIL NADU’.
Sl. NH Name of the Present Status
No. No Section
1 NH- Dindigul to Overlay work is in progress in Dindigul
383 Karaikudi section (Km.0.00) to Natham (Km. 38.00) stretch
& of NH-383 to be completed by November
NH- 2026.
338 The stretch from Natham (Km.38+00) to
Thirupathur (Km. 84+00) of NH-383 is
under maintenance.
Widening to 4-lane of Thirupathur -
Karaikudi section of NH-338 is in
progress, and will be completed by July
2026.
2 NH- Dindigul to The DPR of Didigal to Plapally section
183 Sabarimala section is under preparation.
The section from Plapally to Pumba
(near Sabarimalai) is a State Highway
and is maintained by the State
Government.
3 NH- Dindigul to The existing Dindigul to Semmadaipatti
83 Semmadaipatti Section of NH-83 has been widened to
section 4-lane and is under maintenance
*****