See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 6434
ANSWERED ON 2ND APRIL, 2026
ROAD CONSTRUCTION AND UPGRADATION WORKS IN LAKSHADWEEP
6434. SHRI MUHAMMED HAMDULLAH SAYEED
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मत्रं ी
be pleased to state:
(a) the details of road construction and upgradation works carried out
in various islands in Lakshadweep during the last ten years, island-
wise.
(b) the total length of New roads constructed, roads widened and
roads repaired or resurfaced in this period;
(c) the funds allocated, released and utilized for road infrastructure
development in Lakshadweep during the last ten years;
(d) the challenges faced in road construction and maintenance in
island territories like Lakshadweep including land availability, terrain
and climatic conditions; and
(e) the steps being taken by the Government to improve road
connectivity. transportation efficiency and safety across the islands of
Lakshadweep?ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)
(a) & (b) The Ministry of Road Transport and Highways is primarily
responsible for development and maintenance of National Highways
(NHs) and also provides financial assistance to States/Union
Territories for development of State roads (other than rural roads)
under the Central Road and Infrastructure Fund (CRIF) based on their
priorities.
There are no National Highways in the Union Territory of
Lakshadweep; accordingly, no works relating to construction,
upgradation, widening or resurfacing of NHs have been
undertaken during the last ten years.
The road network in Lakshadweep comprises internal roads, which are
developed and maintained by the UT Administration. As per
information provided by Lakshadweep Public Works Department,
11.889 km of roads have been constructed and 13.605 km have been
resurfaced during the last ten years.
(c) No funds have been allocated, released or utilised for National
Highway infrastructure development in Lakshadweep during the last
ten years. No proposal has been received from the UT Administration
for funding under CRIF.
(d) Road development in island territories such as Lakshadweep
faces challenges including limited land availability, ecological
restrictions, coastal and low-lying terrain, logistical constraints in
transportation of materials, and adverse climatic conditions such as
high humidity and saline environment.
(e) Development and maintenance of internal roads in Lakshadweep
are the responsibility of the UT Administration. The Central
Government supports infrastructure development in coordination with
the UT Administration, with emphasis on sustainable and need-based
development, keeping in view the ecological sensitivity of the islands.
*****