Date: 2026-02-12 Category: Not Applicable State: Union Government Country: India

Parliament Question: Road Infrastructure Development in Darjeeling and Kalimpong Districts

Issued by ROAD TRANSPORT AND HIGHWAYS · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** The document presents the Ministry of Road Transport and Highways' response to an unstarred question in the Lok Sabha regarding road infrastructure development in the Darjeeling and Kalimpong districts of West Bengal since 2019. It includes year-wise fund allocation, details of National Highway projects, road lengths sanctioned, constructed, upgraded, and steps taken to improve road connectivity, safety, and maintenance. Key stakeholders include residents, transporters, and local businesses in Darjeeling and Kalimpong. There are no immediate action items mentioned for the reader of this report. **Key Points / Main Content** * **Fund Allocation (2019-2026):** * Provides year-wise details of funds allocated, released, and utilized for National Highways and State Roads under the Central Road and Infrastructure Fund (CRIF) in West Bengal. * Includes separate figures for funds towards the development and maintenance of National Highways versus State Roads. * **National Highway (NH) Projects:** * Summarizes details of approved, under-implementation, and completed NH projects in West Bengal since 2019, with a focus on Darjeeling and Kalimpong districts. * The full project list is provided in the Annexure. * For West Bengal (including Darjeeling & Kalimpong) 132 projects were approved for a length of 929 km with an amount of Rs 18,890 Cr. 44 projects were under implementation for a length of 153 km with an amount of Rs. 7,564 Cr. 88 projects were completed for a length of 759 km with an amount of Rs. 11,326 Cr. * For projects passing through Darjeeling & Kalimpong 44 projects were approved for a length of 165 km with an amount of Rs 3,019 Cr. 17 projects were under implementation for a length of 37 km with an amount of Rs. 1,553 Cr. 27 projects were completed for a length of 128 km with an amount of Rs. 1,466 Cr. * **Road Development in Darjeeling & Kalimpong Districts:** * Since 2019 in the Darjeeling and Kalimpong districts sanctioned length of National Highways 165 km and sanctioned length of CRIF 12 km. * Since 2019 in the Darjeeling and Kalimpong districts length of National Highways constructed/upgraded 128 km and length of CRIF constructed/upgraded 12 km. * Expenditure on National Highways works: ₹1466 Cr and expenditure on CRIF works: ₹79 Cr. * **Beneficiaries:** * The construction and upgradation of NHs and other road projects benefited local residents, transporters, tourists, and local businesses in Darjeeling and Kalimpong districts by improving connectivity, reducing travel time, and enhancing road safety. MoRT&H does not maintain a record of the exact number of beneficiaries. * **Steps for Road Connectivity, Safety, and Maintenance:** * Development of NHs is based on traffic density, connectivity needs, road conditions, and synergy with PM Gati Shakti NMP. * Measures include slope protection, installation of crash barriers, traffic signages, road markings, lighting, and pedestrian facilities. **Impact Analysis** **Residents, Transporters, Tourists, and Local Businesses of Darjeeling and Kalimpong Districts** * **Impact:** Improved connectivity, reduced travel time, and enhanced road safety due to road construction and upgrades. * **Action Required:** No immediate action required. Be aware of road improvements and potential disruptions during construction. **Government of India (Ministry of Road Transport & Highways)** * **Impact:** Increased responsibility for development and maintenance of National Highways and provision of CRIF. * **Action Required:** Continue development and maintenance of national highways, provide assistance to State Governments through CRIF.

Key Entities Referenced

Ministry of Road Transport and Highways: The central government ministry responsible for road infrastructure development referenced in the document. National Highway (NH): National Highways are a major component of India's road network and the development and maintenance of NHs is a key focus of this policy document. Darjeeling and Kalimpong districts: The specific geographic locations to which the infrastructure development in the document applies. West Bengal: The Indian state in which the road infrastructure projects are to be conducted. Central Road and Infrastructure Fund (CRIF): A fund used by the Ministry of Road Transport & Highways for National Highways and State Roads.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO. 2171 ANSWERED ON 12TH FEBRUARY, 2026 ROAD INFRASTRUCTURE DEVELOPMENT IN DARJEELING AND KALIMPONG DISTRICTS 2171. SHRI RAJU BISTA: Will the Minister of ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन औि िाजमार्ग मंत्री be pleased to state: (a) the details of funds allocated, released and utilized by the Ministry for road infrastructure development in the State of West Bengal since 2019, year-wise; (b) the details of National Highway (NH) projects approved, under implementation and completed in West Bengal during the said period, district-wise particularly in Darjeeling and Kalimpong districts; (c) the total length (in km) of roads sanctioned, constructed and upgraded in Darjeeling and Kalimpong districts since 2019, along with the expenditure incurred thereon; (d) the number of beneficiaries, including residents, transporters and local businesses, benefited due to the construction and upgradation of NHs and other road projects in Darjeeling and Kalimpong districts; and (e) the steps being taken by the Government to improve road connectivity, safety and maintenance in the hilly and border areas of Darjeeling and Kalimpong districts? 1ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a) The year wise details of funds allocated, released and utilized by the Ministry of Road Transport & Highways for National Highways and State Roads under Central Road and Infrastructure Fund (CRIF) in the State of West Bengal since 2019 are as under: Sr. Financial Details of funds Details of funds towards No. Year towards development and development and maintenance of State Roads maintenance of under Central Road and National Highways Infrastructure Fund (CRIF) Allocation Released/ Allocation Released Utilized (Rs. in Cr.) Utilized (Rs. in Cr.) (Rs. in (Rs. in (Rs. in Cr.) Cr.) Cr.) 1 2019-20 2,665 2,665 224.70 451.67 398.46 2 2020-21 2,658 2,658 209.20 136.11 293.49 3 2021-22 3,642 3,642 213.97 287.06 271.54 4 2022-23 3,053 3,053 240.31 217.90 166.30 5 2023-24 3,543 3,543 275.67 298.08 558.24 6 2024-25 2,241 2,240 272.75 272.75 404.52 7 2025-26 (till 3,788 3,308 299.40 0.00 45.40 31.12.2025) (b) The details of National Highways (NH) projects approved, under implementation and completed in West Bengal since 2019 including projects passing through Darjeeling and Kalimpong districts are given in the Annexure and summarized as under: Particular Approved Under ImplemenCompleted tation Nu Leng AmounNu Leng AmounNu Leng Amoun mb th (in t (Rs. Imb th (in t (Rs. Imb th (in t (Rs. I 2ers km) n Cr.) ers km) n Cr.) ers km) n Cr.) West Bengal (in132 929 18,890 44 153 7,564 88 759 11,326 cluding Darjeeli ng & Kalimpong ) Projects passin44 165 3,019 17 37 1,553 27 128 1,466 g through Darje eling and Kalim pong (c) Government in the Ministry of Road Transport & Highways (MoRT&H) is responsible for development and maintenance of National Highway in the country and provide assistance to State Governments in development of state roads through CRIF. The total length (in km) of roads sanctioned, constructed and upgraded in projects passing through Darjeeling and Kalimpong districts since 2019, along with the expenditure incurred are as under: Sr. Particular National Highways CRIF No. Works Works 1 Sanctioned length (in km) 165 12 2 Length constructed/ upgraded 128 12 (in km) 3 Expenditure (in Rs. Cr.) 1466 79 (d) The construction and upgradation of National Highways in Darjeeling and Kalimpong districts, have benefited local residents, transporters, tourists, and local businesses by improving connectivity, reducing travel time, and enhancing road safety. MoRT&H does not maintain record of numbers of beneficiaries. (e) Development of NHs are taken up based on the traffic density, connectivity requirement, condition of the road and synergy with PM Gati Shakti NMP. Various measures including slope protection (Retaining Wall, Breast Wall, Gabion Wall etc), installation of crash barriers, traffic signages, road markings, lightings, pedestrian 3facilities, improvement of road geometry are taken up as per the requirement for safety and maintenance in hilly and border areas of Darjeeling and Kalimpong. 4ANNEXURE ANNEXURE REFERRED IN REPLY OF PART (b) OF LOK SABHA UNSTARRED QUESTION NO. 2171 FOR 12/02/2026 ASKED BY SHRI RAJU BISTA REGARDING ROAD INFRASTRUCTURE DEVELOPMENT IN DARJEELING AND KALIMPONG DISTRICTS Length Lengt Sanction Current Distri Expenditure compl Sr. h Sanctioed Cost Status ct Name of Work incurred eted No. (in n Date (Rs. in (Completed/ Invol (Rs. In Cr.) (in km) Cr.) ongoing) ved kms) Stage Strengthening of the existing pavement from 0.00 Purb Kmp to 49.00 kmp of NH- 2B a under National Highway Bard Division No:-III of N.H.C.-II 16-12- 1 49 58.99 Completed 48.36 hama 49 during the year 2019-20 in 2019 n & the district of Purba Birbh Bardhaman & Birbhum ,West um Bengal in EPC Mode Job No.002B-WB-2019-20/441 Staged Strengthening from km 8.200 to km 15.600 of NH- 31C in the District of 16-12- Darje 2 7.3 7.28 Completed 6.04 7.3 Darjeeling, West Bengal on 2019 eling EPC mode Job No.031C-WB- 2019-20/442 Stage Strengthening from 260 kmp to 266 kmp and 271 kmp to 275 kmp (except Bank 273.05 km to 273.85 km) of ura & NH-60 under N.H Division Pasc 17-12- 3 No.III, P.W.(Roads) 9.2 10.7 Completed 9.85 him 9.2 2019 Directorate in the District of Bard Bankura & Paschim hama Bardhaman, West Bengal on n EPC mode (Job No. 60-WB- 2019-20-440) Reconstruction and Widening of narrow culvert ( 8 nos) nos. 496, 471, 467, 461, 446, 430, 429 and 418 at 7.01 km, 11.85 km 11.02 km, 11.80 km, 13.50 km, 15.70 km, 15.80 km and 17.30 on 17-12- Darje 4 0 4.85 Completed 4.94 0 N.H.55 respectively in 2019 eling between 0.00kmp to 20.00 Kmp of N. H. 55 under N.H.Division IX, in the district of Darjeeling during the year 2019-20 under item rate 5(Job No.55-WB-2019-20-446) Re-construction and widening of narrow culvert (8 nos.) Nos. 392, 381, 248, 243, 224, 217, 205 and 189 at 20.76 km, 21.80 km, 34.80 km, 35.25 km, 36.60 km, 17-12- Darje 5 37.20 km, 38.10 km and 0 4.88 Completed 4.82 0 2019 eling 39.57 km on NH-55 respectively in between 20.00 kmp to 40.00 kmp of NH-55 under NH division IX during the year 2019-20 (Job No.55-WB-2019-20-447) Stage strengthening work from km 156.00 to km 162.00 & km 162.00 to km 173.00 of Pasc NH-60 in the District of 30-12- him 6 17 19.27 Completed 15.7 17 Paschim Medinipur, West 2019 Medi Bengal, during the year 2019- nipur 20 (Job No. 60-WB-2019- 20/450) Stage strengthening work from km 56.00 to km 64.00 of Sout NH-117 under NH Division-I in 24-12- h 24- 7 the District of South 24- 8 8.03 Completed 6.51 8 2019 Parg Parganas, West Bengal, anas during the year 2019-20 (Job No.117-WB-2019-20/444) Stage strengthening work from km 133.00 to km Sout 137.684 of NH-117 in the 30-12- h 24- 8 District of South 24- 4.684 5.33 Completed 4.53 4.684 2019 Parg Parganas, West Bengal, anas during the year 2019-20 (Job No.117-WB-2019-20/449) Stage Strengthening work from km 45.00 to km 57.00 of NH-55 in the district of 30-12- Darje 9 Darjeeling, West Bengal, 12 13.92 Completed 14.09 12 2019 eling during the year 2019-20 on item rate mode using SBD (Job No.55-WB-2019-20/452) 6Stage Strengthening of the existing carriageway from 115.25 Kmp to 126.00 kmp & Pasc from km 140.00 to km 148.00 14-01- him 10 of NH- 60 under during the 16.084 22.82 Completed 18.62 16.084 2020 Medi year 2019-20 in the district of nipur Paschim Medinipur ,West Bengal on EPC Mode(Job No. 60-WB-2019-20/448) Staged Strengthening work from km 641.00 to km 651.690 of NH-31 in the 16-12- Darje 11 District of Darjeeling, West 10.69 10.53 Completed 8.99 10.69 2019 eling Bengal, during the year 2019- 20 Job No. 31-WB-2019- 20/443 Stage Strengthening work from km 22.760 to km 34.00 of NH-117 in the district of Sout South 24 Parganas, West 28-01- h 24- 12 11.24 10.31 Completed 9.01 11.24 Bengal under NH Division-I 2020 Parg during the year 2019-20 on anas EPC mode.(Job No. 117-WB- 2019-20/455) stage Strengthening of Road stretch from km 30.00 to km 40.00 of NH-55 in the district 29-01- Darje 13 of Darjeeling, West Bengal, 10 13.38 Completed 13.09 10 2020 eling during the year 2019-20 on SBD mode.( Job No. 055-WB- 2019-20/451) Strengthening of existing carriageway from km 32.00 to km 35.00, km 40.00 to km 41.00 and km 64.70 to km Purb 82.32 of NH-116B under a 14 21.6 18.02.2 34.98 Completed 29.52 21.6 N.H.Division No.-II in the Medi 020 district of Purba Medinipur, nipur West Bengal on EPC Mode (Job No. 116B-WB-2019- 20/458) Stage strengthening work from km 25.50 to km 32.00 and km 35.00 to km 40.00 of Purb NH -116B under NH Division- 28-01- a 15 II in the District of Purba 11.5 11.76 Completed 11.7 11.5 2020 Medi Medinipur, State of West nipur Bengal during the year 2019- 2020 on EPC mode. (Job No. 116B-WB-2019-20/457) 7Stage Strengthening Work from Chainage 30.000 Km to 59.600 Km of NH-35 under North NH Division No-V, P.W. 27-01- 24 16 (Roads) Directorate in the 29.6 29.2 Completed 26.2 29.6 2020 Parg District of North 24 Parganas, anas West Bengal, during the year 2019-20 in EPC Mode.(Job No. 35-WB-2019-20/454) Staged Strengthening work of NH-31 from km 758.250 to km 768.945 (Falakata- Cooc Pundibari section) in the 27-01- h 17 10.695 14.51 Completed 14.23 10.695 district of Cooch Behar, West 2020 Beha Bengal under NH Division-X r during the year 2019-20. (Job No. 31-WB-2019-20/453) Restoration/rehabilitation work of Birendra Sasmal setu(over river Kangsabati) at km 118.70 of NH-60 under Salboni NH Sub- Division of Pasc N.H. Division No.II, 27-01- him 18 0 4.53 Completed 4.27 0 P.W(Roads) Dte. In the 2020 Medi district of Paschim nipur Medinipur, West Bengal on item rate mode using SBD. (Job No. 060-WB-2019- 20/456) Re-construction and widening of narrow culvert (9 nos) Nos. 13, 14, 18, 25, 30, 33, 34, 45 and 47 at 71.827 km, 70.900 km, 66.700 km, 63.727 km, 63.220 km, 62.886 km, 62.653 km, 13-02- Darje 19 61.578 km and 61.289 km on 0 4.73 Completed 4.72 0 2020 eling NH-55 respectively in between 77.00 kmp to 40.00 kmp of NH-55 under NH division -IX during the year 2019-20 on item rate mode using SBD. (Job No. 055-WB- 2019-20/445) 8Repair and Rehabilitation of 12 nos. Bridges(i.e.,7.50 km- Panchamuki Bridge,25.40 km- Patharghata Bridge,27.40 km- Nalpukur Bridge,29.00 km- Saraihat Bridge,38.86 km- Harir Sanko Bridge,39.65 km- Pithali Bridge,40.985 km- Gowal Flani Bridge,42.385 Daks km-Brahmani Bridge,42.683 13-02- hin 20 0 4.46 Completed 3.49 0 km-Punarbhaba 2020 Dinaj Bridge,59.585 km-Khaser pur Bridge,60.912 km-Baul Bridge,70.65 km-Atrayee Setu) of NH-512 under NH Division No. VII in the District of Dakshin Dinajpur, West Bengal during the year 2019- 20 on SBD Mode. (Job No. 512/WB-2019-20/460) Stage Strengthening work from km 99.50 to km 104.20 including road furniture‟s in Daks NH – 512 under NH Division – 28-03- hin 21 VII, P.W.(Roads) Directorate 4.7 6.31 Completed 6.04 4.7 2020 Dinaj in the District of Dakshin pur Dinajpur, West Bengal on EPC Mode(Job No. 512-WB-2019- 20/468) Stage Strengthening work on the road stretch between km 80.00 to km 94.50 of NH-117 Sout during the year 2019-20 28-03- h 24- 22 under NH Division – I in the 14.5 13.33 Completed 10.78 14.5 2020 Parg District of South 24- anas Parganas, West Bengal on EPC Mode(Job No. 117-WB- 2019-20/465) Construction of proposed ROB & its approaches on NH- 60 at 193+800 in lieu of LC 28-03- Bank 23 0 62.09 Ongoing 20.53 0 Gate No. 39/A/3E in the state 2020 ura of West Bengal[Job No. 060- WB-2019-20/472] Repair and rehabilitation work of bridges over river Balason, Mahananda, 28-03- Darje 24 Champta, Panchanoi, 0 1.73 Completed 1.65 0 2020 eling Mallarguri underpass & Darjeeling more ROB including development of 9road flank in selected stretches and road safety work in between km 570 to km 582 of NH-31 under N.H. Division-IX in the district of Darjeeling during the year of 2019-20 on item rate mode using SBD(Job No. 031-WB- 2019-20/462) Rectification of black spots at km 119.300 (Amtala), km 119.745 (Hosenabad), km 121.250 (Dharma) & km Pasc 125.500 (Keranichoti) of NH - 28-03- him 25 0 8.62 Completed 7.27 0 60 under NH division-II in the 2020 Medi district of paschim medinipur nipur during the year 2019-20 on EPC mode(Job No. 060-WB- 2019-20/466) Reconstruction of minor bridges over Bamni jhora (ch. 190.729 km) & Dakuwa jhora 28-03- Alipu 26 (ch. 190.872 km) of NH-31C, 0 17.91 Completed 15.44 0 2020 rduar in the district of Alipurduar, West Bengal (Job No. 31C- WB-2019-20/463) Tender based estimate for Emergent restoration, rehabilitation and strengthening of distressed span of R.C.C Hollow Box Girder of balance Cantilever Bridge (Penultimate span Pasc from Bankura end) including 05-03- him 27 0 4.25 Completed 4.28 0 slab and other structural 2020 Medi repairs of the bridge over nipur river Silaboti at km 173.690 of NH-60 in the District of Paschim Medinipur, West Bengal on item rate mode - reg. (Job No. 060-WB-2019- 20/459) Alipu rduar Falakata-Salsalabari section 28-06- Cooc 28 41.65 1938.02 Ongoing 408.97 21.21 of NH-31D (PKG-2A) 2019 h Beha r Balance work of Four Laning 15.10.2 Nadi 29 of Bal. Works of Barajaguli- 66.719 2843.79 Completed 2696.59 66.719 019 a Krishnagar from km. 48.553 10to km. 115.272 in EPC Mode Purb 6-laning from Panagarh to a Palsit section of NH-19 (Old- Bard NH-2) from Km 521.120 to 12.02.2 hama 30 Km 588.870 in the state of 67.75 2020.93 Completed 2408.57 67.75 020 n in West Bengal under West BharatmalaPariyojana on Beng BOT(Toll) Basis. al Six Laning of National Corridor NH-19 from Palsit to Hoog Dankuni (up to NH-6 ly, Connector) from km. 588.870 Purb 13.02.2 31 to km. 652.700 (Total design 63.83 2314 Completed 2193.25 a 62.53 020 length 63.830 km) in the Bard State of West Bengal under hama Bharatmala Pariyojana on n BOT (Toll) basis- Stage strengthening Work from km 57.00 to km 77.00 of NH- 55 in the District of Darjeeling under NH Division- 11-06- Darje 32 20 20.62 Completed 20.84 20 IX, West Bengal, during the 2020 eling year 2020-21 on EPC mode (Job No. 055-WB-2020- 21/471) Stage strengthening work from Chainage 10.000 km to 30.000 km of NH - 35 under Barasat NH Sub Division - II North of NH Division V, P.W. 17-06- 24 33 20 13.38 Completed 10.94 20 (Roads) Directorate in the 2020 Parg District of North 24 Parganas, anas West Bengal, during the year 2020-21 on EPC mode (Job No. 035-WB-2020-21/469) Reconstruction of narrow and distressed major bridge over Lalpool at km 119.300 & Sout Dashmile at km 128.55 of NH- 17-06- h 24- 34 --- 33.7 Completed 42.08 --- 117, in the district of South 2020 Parg 24 Parganas, West Bengal on anas EPC mode (Job No. 117-WB- 2020-21/467) 11Replacement of damaged drops and guide of 17 culverts no. 396, 373, 367, 365, 350, 348, 309, 286, 268, 265, 261, 231, 230, 226, 211, 210 and 200 at km 20.40, km 22.90, km 23.50, km 23.70, km 25.25, km 25.50, km 28.90, km 31.49, km 33.15, 24-08- Darje 35 --- 4.54 Completed 4.24 --- km 33.45, km 33.90, km 2020 eling 36.10 , km 36.20 , km 36.35, km 37.68, km 37.90, km 38.35 respectively in between km 20.00 to km 40.00 of NH-55 under NH division-IX on item rate mode using SBD (Job No. 55-WB- 2020-21/474) Replacement of damaged drops and guides of 10 culverts in between km 0.00 18-08- Darje 36 to km 20.00 of NH-55 in the --- 3.05 Completed 3.08 --- 2020 eling District of Darjeeling during the year 2019-20" (Job No. 055-WB-2020-21/473) Stage strengthening work from km 374.00 to km 401.00 of NH-60 (new NH-14) including rectification of 5 identified black spots [WB- (02)-013-Mansuba More, WB- (02)- 198-Tejhati, WB-(02)- 26-02- Birbh 37 199-Lotus Press More, WB- 27 43.44 Completed 34.7 27 2021 um (02)-262-Mollarpur, WB-(02)- 352- Majhkhanda More] under NH Division No. XII, P.W. (Roads) Directorate in the District of Birbhum, West Bengal (Job No. 060-WB- 2020-21/479) Rectification of black spots at km 148.465 (Mandal Kupi) [WB (02)-672] of NH60 (New Pasc NH-14) under NH Division-II in 22-03- him 38 the district of Paschim --- 1.89 Completed 1.5 --- 2021 Medi Medinipur during the year nipur 2020-21 in the State of West Bengal (Job No. 060-WB- 2020-21/476) 12Improvement of black spot from km 12.35 to km 12.50 [WB-(02)-592], km 29.60 to km 30.00 [WB-(02)-385], km 35.05 to km 35.45 [WB-(02)- 660], km 37.20 to km 37.50 22-03- Kali 39 --- 3.57 Completed 3.39 --- [WB-(02)-661] of NH-10 under 2021 mpon NH division-IX, in the district g of Kalimpong, during the year 2020-21 in the State of West Bengal (Job No. 010-WB- 2020-21/475) Replacement of damaged Expansion Joints and other allied works at Kolkata Side Viaduct of Santragachi ROB on NH-117 (Kona 22-03- Howr 40 Expressway) at km 4.50 --- 1.04 Completed 0.84 --- 2021 ah under NH Division-I in the District of Howrah during the year 2020-2021 on item rate mode using SBD (Job No. 0117-WB-2020-21/477) Stage strengthening work on road for stretch from 670.00 km to 674.175 km of NH-31 (New NH 717) in the district of Jalpaiguri, West Bengal, 22-03- Jalpa 41 4.175 4.47 Completed 3.54 4.175 during the year 2020-21 2021 iguri, under Annual Plan 2020-21 in the State of West Bengal (Job No. 031-WB-2020- 21/478) Stage strengthening work between 14.400 km to 24.700 km & Strengthening and widening of existing two lane weak pavement to fourlane divided carriageway with paved shoulder formation between 24.700 km to 25.700 North km,,construction of two 23-03- 24 42 11.3 94.98 Completed 81.05 11.3 number minor bridges at 2021 Parg 17.036 km & 18.736 Km , anas repair of road side drain and construction of retaining wall and permanent rectification of 12 number black spots on National Highway-34 under National Highway Division-V during the year 2020-21 in 13the state of West Bengal(Job No. 480) Stage Strengthening of Existing Carriageway for the stretch from km 320.00 to km 05-06- Birbh 43 330.00 of NH – 60 under NH 9.726 13.23 Completed 10.06 9.726 2020 um Division-XII, in the district of Birbhum, West Benga (Job no. 470) Development of Emergency Landing Facility on NHS: Construction from near Km.83.400 to Km.88.400 on Pasc Completed Balasore to Kharagpur 17.12.2 him 44 4.85 144.97 (under 131.04 4.85 section (Approximately 020 Medi O&M) 5.00Km) of National Highway nipur No.16 (hereinafter called the “NH-16”) in the State of West Bengal Construction of 4-laning road for Purulia Bypass Section Purul from Km 84.030 to Km 94.345 ia in 28.01.2 45 of NH-32(Length 10.315 km) 10.315 253.83 Ongoing 153.65 West 9.98 021 in the state of West Bengal Beng under NHDP-IV-B on EPC al Mode Stage strengthening work from km 19.00 to km 36.00 (Except Black Spot location i.e., from km 19.74 to km 20.88, km 25.18 to km 26.26, km 26.36 to km 27.43, km Daks 29.80 to km 30.77, km 31.10 07-10- hin 46 to km 32.10, km 34.20 to km 10.65 8.51 Completed 2.11 10.65 2021 Dinaj 35.29) including road pur furnitures inNH-512 under NH Division VII, P.W.(Roads) Dte. in the district of Dakshin Dinajpur during the year 2021-22 on EPC mode- [Job No. 512/WB/2021-22/481] 14Construction of RCC covered drain from Km. 85.99 to Km. 87.08 both sides of NH-512 under N. H. Div. No. VII, Daks P.W.(Roads) Directorate in 07-10- hin 47 0 2.32 Completed 8.59 0 the district of Dakshin 2021 Dinaj Dinajpur during the year pur 2021-22 on item rate mode using SBD (Job No. 512/WB2021-22/483) Rectification of 17 nos. Black Spot (20th Mile- WB-(02)-596, 21th Mile- WB-(02)-285, Daulatpur- WB-(02)-358, Patharghata- WB-(02)-473, Dhumsadighi- WB-(02)-647, Buniadpur- WB-(02)-133, Rasidpur- WB-(02)-359, Ditolhat- WB-(02)-357, Thangapara- WB-(02)-361, Mald Maharajpur- WB-(02)-575, a and Gochiher- WB-(02)-360, Narai- 11-11- Daks 48 WB-(02)-134, Rampur- WB- 0 20.3 Completed 17.79 0 2021 hin (02)- 362, Baul- WB-(02)-354, Dinaj Bolla- WB-(02)-355, Bahicha- pur, WB-(02)-572, Mahinagar- WB- (02)- 574) from km 7.95 to km 78.205 including 1.50 km re- sectioning & 3.50 km stage strengthening in selected stretches on NH-512 in the District of Malda and Dakshin Dinajpur, West Bengal on EPC mode (Job No. 512/WB2021- 22/485) Repair and rehabilitation by replacement of damaged concrete deck slab of Dwarka Barrage Bridge at km 359.750 of NH 60 under N.H. 10-11- Birbh 49 0 2.2 Completed 1.82 0 Division no.- XII in the district 2021 um of Birbhum, West Bengal for the year 2021-22 on SBD mode (Job No. 60/WB2021- 22/484) Stage Strengthening from km 98.00 to km 111.710, Sout including re-construction of 28-12- h 24- 50 13.71 17.07 Completed 14.05 13.71 500 m in selected stretches 2021 Parg including rectification of one anas identified black spot at Sima 15Bandh (WB- 02-564) on NH- 117 in the district of South 24 Parganas, West Bengal on EPC mode(Job No. 117/WB2021-22/487) Stage Strengthening from km 34.000 to km 56.000, km 64.000 to km 80.000 and km 94.500 to km 98.000 including re-construction of Sout 600 m in selected stretches 22-12- h 24- 51 and rectification of 22 41.5 57.36 Completed 45.49 41.5 2021 Parg identified black spots on NH- anas 117 and IMS from km 22.76 to km 137.684 in the district of South 24 Parganas, West Bengal on EPC mode(Job No. 117/WB2021-22/486) Re- construction/Strengthening from km 401.00 (Nalhati) to km 422.450 (Moregram) fof NH-60 (new NH-14) along Birbh with permanent rectification um & of 7 black spots except 07-01- 52 21.19 99.45 Completed 85.68 Murs 21.19 Ghambhira bridge (km 2022 hidab 420.479 to km 420.634 – 155 ad m) in the districts of Birbhum and Murshidabad in the State of West Bengal under Annual Plan 2021-22 on EPC mode (Job No 488) Development to 4/6-lanning of NH-31 (New NH-10) with both side service roads from km 569.258 to km 581.030 (end of AH-02 project on NH- 31 16-03- Darje 53 near Shivmandir to Sevoke 11.772 995.04 Ongoing 533.06 3.50 2022 eling Army Cantonment) in districts of Darjeeling and Jalpaiguri in the state of West Bengal on EPC Mode (Job No. 10/WB2021-22/490) Construction of a bridge over river Shali at km 247.00 of NH-60 (new NH-14) in 16-03- Bank 54 0 30.68 Completed 27.21 --- Bankura district in the state 2022 ura of West Bengal on EPC mode (Job No. 14/WB2021-22/491) 16Stage strengthening of road stretches from km 0.00 to km 3'50 along with provision for both sides covered drain and construction of one culvert 30-03- Mald 55 3.5 16.57 Completed 16.82 3.5 (at km O.0O) of NH-512 in the 2022 a district of Malda on EPC mode during the FY year 2021-22 (Job No. 512/WB2021-22/492) Restoration work of rain damage valley side from km 22.10 to km 22.60 of NH 10, Kali under NH Division-IX, in the 05-10- 56 0 2.05 Completed 2.01 mpon --- district of Kalimpong, during 2021 g the year 2021-22 on item rate mode using SBD (Job No. 010-WB-2021-22/482]) Balance work for construction of Fulahar Bridge approach on NH-131A from km 49.050 to km 51.200 21-06- Mald 57 and from km 53.810 to km 3.53 42.48 Completed 43.07 3.53 2022 a 55.190 in Malda district in the state West Bengal under EPC mode [Job No. 131A/WB/2022-23/494] Balance Work of Strengthening of road stretches along with provision for retaining walls, Breast walls & hill side drains from km 0.00 to km 15-09- Darje 58 18.4 14.79 Completed 14.93 18.4 4.40 & km 14.00 to km 28.00 2022 eling of NH-10 (old NH-31A) in Darjeeling district in the state of West Bengal in EPC mode [Job No. 10/WB/2022- 23/496] Repair & Rehabilitation of steel bridge over river Ichamati (Rakhaldas Setu) at km 53.53 on NH-112 (old NH- 35) at Bongaon and Repair & North Rehabilitation of steel bridge 20-09- 24 59 0 1.67 Completed 1.76 --- over river Naobhasan (Thakur 2022 Parg Haridas Setu) at km 56.060 anas on NH-112 (old NH-35) at Bongaon on item rate mode using SBD [Job No. 112/WB/2022-23/497] 17Tender based estimate for Restoration work for distressed span of Balason Bridge at km 569.600 of NH- 26-09- Darje 60 31 (new NH-10) in Darjeeling 0 2.1 Completed 2.05 --- 2022 eling district in the State of West Bengal on Item rate mode under Annual Plan 2022-23 [Job No. 10/WB/2022-23/499] Balance work for construction of approach slabs, wing wall & return wall along with approach roads for newly constructed bridge Pasc at km 146.709 of NH-60 (new 30-09- him 61 0 7.02 Completed 5.17 --- NH-l4) in the district of 2022 Medi Paschim Medinipur in the nipur State of West Bengal on EPC Mode under Annual Plan 2022-23 [Job No. 14/WB/2022- 23/500] Rehabilitation work of Sukhajhora Bridge over river Sukhajhora at km 623.830 on NH-17 (old NH 31) under NH Division IX in the district of 28-12- Jalpa 62 0 0.91 Completed 0.9 --- Jalpaiguri, West Bengal 2022 iguri, during the year 2022-2023 on item rate mode using SBD. [(Job No.NH-17/WB/2022- 23/501] Repair and Rehabilitation of Balisai Bridge (Chaddyamile)at km 75.300 Purb of NH-116B in the district of 10-01- a 63 Purba Medinipur in the State 0 8.07 Completed 6.34 --- 2023 Medi of West Bengal during the nipur year 2022-2023 in EPC Mode(Job No.116B/WB/2022- 23/503) Stage Strengthening work from km 317.00 to km 320.00 of NH-60 (new NH-14) under NH Division No- XII in the 18-01- Birbh 64 0 4.46 Completed 3.6 --- District of Birbhum, 2023 um West Bengal during the year 2022-23 on SBD mode (Job No. 14/WB/2022-23/504) 18Improvement of Spots from km 8.400 to km 8.480, km 16.225 to km 16.350 & km 16.370 to km 16.510 & widening of culvert at km 16.318 and km 16.470 02-02- Darje 65 respectively in between km 0 0 4.87 Completed 2.8 --- 2023 eling to km 20 of NH-110 (Old NH- 55) in the District of Darjeeling under Annual Plan 2022-23 on item rate mode using SBD(Job No.110/KOL/2022-23/508 Widening of 2 culverts at 9.09 and 9.12 km & Replacement of damaged drops and guides of culverts at km 2.36, km 3.37, km 3.65, km 4.38, km 7.95, km 10.50, km 10.90, km 11.24, km 14.57, km 17.20, 02-02- Darje 66 km 18.21 & improvement of 0 4.75 Completed 4.89 --- 2023 eling spot from km 9.035 to 9.200 respectively in between km 0 to km 20 in the District of Darjeeling under Annual Plan 2022- 23 on item rate mode using SBD(JobNo.- 110/KOL/2022-23/507) Reconstruction of culvert at km 9.50 and Widening of 2 nos. narrow culvert at km 8.30 & km 13.52 respectively & spot improvement from km 8.266 to km 8.289 & km 8.299 to km 8.372, km 9.443 02-02- Darje 67 0 4.7 Completed 4.48 --- to km 9.523 & km 13.462 to 2023 eling km 13.662 respectively from km 0.00 to km 20.00 of NH- 110 (Old NH-55) in the District of Darjeeling under Annual Plan 2022-23 (JobNo.- 110/KOL/2022-23/506) 19Repair of old parapets, construction of new parapets, road signage , Median Marker, road marking, etc within km 0.00 to 20.00 Km of N.H.55 (except the chainages between Km 8.266 to Km 8.286 & Km 8.284 to Km 8.372 , Km 8.400 to Km 8.480, Km 9.035 to Km 9.200 02-02- Darje 68 , Km 9.443 to Km 9.523, Km 0 1.81 Completed 1.75 --- 2023 eling 13.462 to Km 13.562, Km 16.225 to Km 16.350, Km 16.370 to Km 16.510 & Permanent Restoration of damaged road bench at km 60.180 of NH-110 (Old NH-55) in the District of Darjeeling under Annual Plan 2022-23 on item rate mode using SBD (JobNo.-110/KOL/2022- 23/505) Restoration works at valley side rain damaged Road Bench at km 22.90, km 22.95 , km 23.10 & km 23.70 of NH- Kali 10 for the Year 2022-23, 06-02- 69 0 2.38 Completed 2.33 mpon --- under National Highway 2023 g Division No IX in the District of Kalimpong on item rate mode using SBD(Job No.10/KOL/2022-23/509) (i) Repair & Renovation of Bridge At km 229.793 (Gandeshwari) &Canal Bridge At km 190.856 of NH-60 in The District of Bankura, West Bengal on item rate mode using SBD- reg. 08-02- Bank 70 (ii)Repair & Retrofitting 0 2.5 Completed 2.09 --- 2023 ura works for Berai Bridge(Ch.198.101km) & Darakeshwar Bridge(Ch.226.456km) of NH 60in The District of Bankura, West Bengal on item rate mode using SBD (job No.510) 20(i) Reconstruction of a box culvert at km 3.780 in connection with the Widening of NH-35 (New NH-112) under NH Division No.-V, P.W. (Roads) Directorate, (ii) Reconstruction of minor bridge at km 13.872 of NH-35 (New NH-112) under NH North Division No. V, P.W. (Roads) 06-02- 24 71 Directorate (iii) 0 40.13 Ongoing 24.26 --- 2023 Parg Reconstruction of bow string anas girder type minor bridge at km 16.567 of NH35 (New NH- 112) under NH Division No.- V, P.w. (Roads) Directorate, in the district of North 24- Parganas, West Bengal during the year 2022-23 in EPC mode(Job No. 0112-WB- 2022-23/511) Improvement of the stretch from km 597.00 to km 598.00 of NH-31 by providing Mastic Asphalt wearing course, Construction of New Five Numbers of Culverts including valley / hill side protective work & Kali Restoration of rain damaged 28-02- 72 0 7.7 Completed 7.76 mpon --- embankment by Construction 2023 g of guard wall at km 598.900 under NH Division No-IX in the District of Kalimpong in the State of West Bengal during the year 2022-23 in EPC Mode(Job No.17/WB/2022- 23/513) Construction of 4 lane Raniganj Bypass from km Pasc 273.000 of NH 60 (new NH him 14) to km 478.18 of NH-2 06-03- 73 5.261 410.83 Ongoing 202.45 Bard 0 (New NH 16) in Paschim 2023 hama Bardhaman, West Bengal in n EPC Mode. (Job No. 014-WB- 2022-23/514) 21Widening/strengthening of existing alignment from km 64.70 to Km 72.119 and from km 78.600 to Km 81.800 to 2L+PS and construction of Purb 2L+PS Ramnagar By-Pass 15-03- Not a 74 from km 72.119 to km 78.600 17.1 812.5 161.25 0 2023 awarded Medi of NH-116B in the District of nipur Purba Medinipur in the State of West Bengal under Annual Plan 2022-23 in EPC Mode (Job No. 116B-WB-2022- 23/515) Repair/ Rehabilitation of 6 (Six) number Bridges i.e Leesh bridge, Gheesh bridge , Chell bridge, Mal bridge, Newra bridge , New Zarda bridge at km 607.151, km 611.920, km 614.775, km 27-03- Jalpa 75 628.720, km 630.895 & km 12.96 Completed 12.05 --- 2023 iguri 672.830 respectively on NH- 17 (Old NH-31) under NH Division-IX in the district of Jalpaiguri West Bengal during the year 2022- 2023.(Job No. 17/WB/2022-23/ 516) Construction of Dubrajpur Bypass with 4-lane configuration of length 5.676 km on NH-60 (new NH-14) from design chainage 0.00 (existing km 316.135 on NH- 29-03- Birbh 76 5.676 560.79 Ongoing 166.34 0 60) to design chainage 5.676 2023 um (existing km 320.980 on NH- 60) in the district of Birbhum, West Bengal on EPC Mode- reg. (Job No. 014-WB-2022- 23/518) Widening Carriageway width along with construction of footpath from km 69.00 to km 71.40 , Permanent Restoration of depressed 31-03- Darje 77 road bench at km 60.480 and 2.4 18.45 Completed 18.55 2.4 2023 eling Restoration of Valley side protection wall at km 60.950 in between km 60 to km 61 & Repair & Rehabilitation of Panchanai bridge at km 2275.030 of NH-110 (Old NH- 55)in the district of Darjeeling West Bengal during the year 2022-2023 (Job No.110/WB/2022-23/ 521) Restoration / Rehabilitation work of Birendra Sasmal Setu (over River Kangsabati) at Km 118.70 Km of NH-60 (new Pasc NH-14) in the district of 29-08- him 78 0 11.08 Completed 8.88 --- Paschim Medinipur in the 2022 Medi State of West Bengal under nipur Annual Plan 2022-23 on EPC mode [[Job No.14/WB/2022- 23/495] Repair and Rehabilitation of Coronation Bridge over Teesta river at km 595.200 on NH-31 (New NH-17) under NH Division-IX, Siliguri in the 24-08- 79 0 4.09 Completed 4.82 Darje --- district of Darjeeling West 2022 eling Bengal during the year 2022- 2023 on item rate mode using SBD. [Job No. NH-31(New NH-17)/WB/2022-23/RSCE-04] Permanent rectification of 1 nos. Black Spot at Fulbari Choupathi [WB-(02)-474] from km 52+179 to km 53+234 of NH-512 and installation of 5(five) numbers Overhead Gantry Signboard at km 0.95 (Gazole), km 29.95 (Buniadpur), km 52.500 Daks (Fulbari Choupathi), km 70.70 19-09- hin 80 0 2.29 Completed 1.91 --- (Patiram) and km 82.35 2022 Dinaj (Balurghat) on NH-512 as pur long term permanent road safety measures in the District of Dakshin Dinajpur,West Bengal under Road Safety Annual Plan 2022-23 on item rate mode using SBD. [Job No. NH- 512/WB/2022-23/RSCE-05] 23Road safety work by providing Thrie Metal Beam Crash Barrier in between km 115.250 to km 148.00 & km 156.00 to km 173.00 of NH-60 Pasc (new NH-14) under NH 04-10- him 81 0 4.67 Completed 4.42 --- Division-II in the District of 2022 Medi Paschim Medinipur under nipur Road Safety Annual Plan 2022-23 on item rate mode using SBD. [Job No. NH- 14/WB/2022-23/RSCE-07] Road safety works in different stretches from (km 35.545 to km 36.20 , km 38.97 to km 39.22 , km 42.01 to km 42.32 & km 44.78 to km 45.04) for improvement of sharp turning & narrow road Kali bench and construction of 19-10- 82 0 9.46 Completed 9.43 mpon --- Over Head Gantry signs at 2022 g 51.3 km of NH-10 (old NH- 31A) under NH Division-IX in the District of Kalimpong in theState of West Bengal under Road Safety Annual Plan 2022-23 [Job No. NH- 10/WB/2022-23/RSCE-08] Widening of Culvert at 0.90 Km and 22.50 Km of N.H-10 under N.H. Division No lX in the District of Darjeeling and Kali 24-11- 83 Kalimpong in the state of 0 2.57 Completed 1.96 mpon --- 2022 West Bengal during the year g 2022-2023 on item rate mode using SBD [Job No. NH- 10/WB/2022-23/RSCE-09] Road Safety Works in km 40 to km 77 of NH-110 (Old NH- 55) by (i) Re-construction and widening of narrow culvert nos. 65/3(Old No- 21), 64/6(Old No-27) & 59/2(Old 24-11- Darje 84 0 12.8 Completed 12.58 --- No-63) at km 64.820, km 2022 eling 63.627, km 58.935 respectively & other allied protection works between km64.650 to km 64.950 in vicinity of CD no.65/3, km 63.560 to km 63.730 in 24vicinity of CD no. 64/6, km 58.915 to km 58.955 in vicinityof CD no. 59/2 respectively in between km 58.00 to km 64.00 . (ii) Re- construction and widening of narrow culvert nos. 64/4 (Old No-29),62/1(Old No-50), 61/6(Old No-51) and 52/2(Old No-98) at km 63.300, km 61.008, km 60.925, km 51.494 respectively & other allied protection works between km 63.170 to km 63.385 in vicinity of CD no.64/4, km 60.870 to km 61.070 in vicinity of CD nos. 62/1 &61/6 in between km 51.00 to km 63.00. (iii) Replacement of Damaged drops and guides of 10 culvert Nos. 64/7 (Old no- 26),63/5 (Old no-36),63/4 (Old no-37),62/5 (Old no-46),62/3 (Old no-48),61/4 (Old no- 53),60/6 (Old no-59),60/4 (Old no-61),54/3 (Old no-91) and 45/6 (Old no-137) at km 63.00, km 62.561, km 62.462, km 61.422, km 61.271, km 60.531, km 59.791, km 59.425, km 53.555 and km 44.413 in the District of Darjeeling under Road Safety Annual Plan 2022-23 – reg.(Job No.NH-110/KOL/2022- 23/RSCE-10) Road Safety work in between km 40 to km 77 of NH-110 (Old NH-55) by(i) Improvement of road geometrics by widening road width locally at km 51.508 to km 51.682 on NH-110 (Old 30-11- Darje 85 0 14.65 Completed 14.95 --- NH-55). (ii) Road Widening at 2022 eling km 47.300 to km 47.420 under Improvement of road geometrics by widening road width locally at km 58.700 to km 58.830, km 55.790 to km 55.846 & km 47.300 to km 2547.420 NH-110 (Old NH-55). (iii) Road Widening at km 61.420 to km 61.500 under "Improvement of road geometrics by widening road width locally at km 64.475 to km 64.675, km 62.960 to km 63.240 & km 61.420 to km 61.500 on NH-110 (Old NH-55) respectively in between km 61.00 to km 64.00 - sanction [Job-NH-110/Kol/2022- 23/RSCE-11] Road Safety works by providing “Thrie” metal beam crash barrier on NH-117 (New NH-12) from km 22.76 Km to km 34.00 km, km 56.00 to km 64.00 and km 80.00 to km Sout 94.50 under NH Division-I in 19-07- h 24- 86 0 1.44 Completed 1.18 --- the district of South 24 2022 Parg Parganas during the year anas 2022-23 under Road Safety Annual Plan 2022-23 on item rate mode using SBD. [Job No.- NH-117 (New NH- 12)/WB/2022-23/RSCE-03] Construction of Six Lane Elevated Kona Expressway from Km.0.145 to KM.7.337 of 03.03.2 Howr 87 7.192 1212.56 ongoing 362.66 0.00 NH 117 (New NH-12)In the 023 ah state of West Bengal on EPC Mode. Construction and upgradation of Existing Road to 2-Lane with Paved Shoulders including geometric improvement of section from Kali 30.09.2 88 start of Pedong Bypass to 16.554 395.59 Ongoing 408.65 mpon 15.73 022 Reshi Border km 79+700 to g km 96+254 of NH-717A on EPC basis under SARDP-NE Phase „A‟ in the state of West Bengal [Pkg-VB] Construction and up- gradation of existing road to 2 lane with paved shoulder Kali 13.10.2 89 including geometric 21.1 273.78 Ongoing 268.01 mpon 20.81 022 improvement of Kafer to Lava g More section from Km 40.000 to Km 61.100 of NH-717A on 26EPC basis in the state of West Bengal [Pkg-VA] Reconstruction and widening of 08 nos. narrow culvert at km 22.445, km 22.450, km 22.840, km 27.565, km 29.000 ( half portion), km 29.500, km 30.650, km 38.290 & spot improvement from km 22.397 to km 22.442, km 22.445 to km 22.450, km 22.453 to km 22.493, km 26.855 to km 26.935, km 27.125 to km 27.175, km 27.492 to km 27.562, km 27.565 to km 27.710, km 29.487 to km 29.502, km 04.01.2 Darje 90 29.506 to km 29.513, km - 12.77 Ongoing 11.14 - 023 eling 32.710 to km 32.750, km 32.885 to km 32.910, km 38.185 to km 38.285, km 38.290 to km 38.330 & repair of old parapets, construction of new parapet, road signage such as Median Marker, Road Marking etc. in selected stretches from km 20.00 to km 40.00 of NH-110 ( Old NH- 55) in the district of Darjeeling under Annual Plan 2022-23 Repair and Rehabilitation of Mayurakshi Bridge at Sainthia at km 91.200 of NH 2B (New NH-114) in the 31-08- Birbh 91 0 11.39 Completed 8.07 --- district of Birbhum, West 2023 um Bengal in the year 2023-2024 in EPC Mode (Job No.114/WB/2023-24/ 524) Construction of additional major Bridge with 4- lane configuration of length 1.48 km on NH-60 (NH-14) over Pasc River Kangshabati from Km. 16-11- him 92 2.38 304.82 ongoing 24.37 0 117.770 to Km 119.250 and 2023 Medi additional major Bridge with nipur 4- lane configuration of length 0.900 km on NH-60 (NH-14) over River Shilabati 27from Km. 173.220 to Km 174.120 in the district of Paschim Medinipur of West Bengal under Annual Plan for FY 2023-24 on EPC mode. (Job No.014/WB/2023-24/527) Widening & Strengthening to 2-lane with paved shoulder from Km 25.50 to 41.00 of Purb NH-116B including 09-02- Not a 93 bypass/realignment in Km 15.5 469.35 0 0 2024 awarded Medi 32.400 to 33.733 and Km nipur 39.281 to 40.780 on EPC mode.(Job No. 014/WB/2023- 24/534) One Time Improvement work Bypassed stretch from Km 19.205 to 22.440 (Samsi); Km 23.550 to 29.702 (Malatipur), Km 30.600 to 36.200 [Chanchal) and Re-alignment 05-03- Mald 94 19.957 20.35 Completed 14.44 19.957 stretch from Km 37.000 to 2024 a 37.650 ; Km 38.400 to 38.750, Km 43.780 to 45.730 & Km 48.00 to 50.00 of NH-31 (Old NH-81) in West Bengal (Job No.81/WB/2023-24/539) Repair and rehabilitation of 6 bridges at km 94.085, km 95.852, km 97.863, km 101.251, km 101.543 & km 103.444 of NH- 15-03- Birbh 95 114 under National Highway 0 2.8 Completed 2.88 0 2024 um Division XII, P.W(Roads) Directorate in the District of Birbhum in the year 2023- 2024 on SBD mode. (Job No. NH-114/WB/2023-24/543) Repair & Rehabilitation of Amriti Bridge (km-10.700) and 2 nos Box Bridge (km 9.985 & km 14.955) along NH 131A under NH Division No 15-03- Mald 96 0 0.57 Completed 0.54 0 VII in the district Malda, West 2024 a Bengal during the year 2023- 24 on SBD mode - Sanction regarding.[Job No.- NH- 131A/WB/2023-24/544] 28Repair and Rehabilitation of Samsi bridge at km 20.850 & Kanua bridge at km 38.40 on NH-31 (old NH-81) under NH 15-03- Mald 97 Division no. VII in the district 0 0.45 Completed 0.4 0 2024 a of Malda, West Bengal during the year 2023-2024 on SBD mode.(Job No. NH- 81/WB/2023-24/545) Widening of culvert at km 411.700, at km 413.250 km & km 417.187 & extension of 21 no HP of NH-60 (New NH- 12-12- Birbh 98 14), in the District of 0 3.29 Completed 3.27 --- 2023 um Birbhum, West Bengal in the year 2023-2024 on SBD mode. (Job No. NH- 14/WB/2023-24/529) Construction of Elephant Underpass (from Km 153+853) to Km (153+953), Jhar 16.03.2 Flyover (from Km 137+966 to gram 024 in Km 138+034), 02 nos Box , EC 99 Culverts (Km 153+679 and 1.60 93.30 Ongoing 24.56 Pasc 0 meeting Km 137+761) and other road him dated safety works in Kharagpur- Medi 606 Chichra section of NH-6 in nipur the state of West Bengal on EPC Mode. Development to 4-laning of the de-scoped stretches from Km 115.342 to Km 191.700 of Nadi NH-34 in Nadia District a & (3.962) & Murshidabad 28.03.2 100 10.554 201.11 Ongoing 46.98 Murs 3.064 District (5.538) pertaining to 024 hidab Krishnagar to Berhampore ad section of NH-34 (New NH- 12) , in the state of West Bengal under NH(O). 4 laning of Barasat - North Barajaguli Section of NH-12 30.03.2 24 101 from Km. 31.000 to Km. 17.679 352.01 Ongoing 27.39 0.27 024 Parg 48.679 in the district of North anas 24 - Parganas Slope Protection and Landslide Mitigation at 2 Vulnerable locations viz. Km Kali 25.09.2 1022 3.200 to 23.960, Km 26.530 0 68.49 Ongoing 0 mpon - 023 to Km 26.580 within Sevoke- g Rangpo section of NH-10 (old NH-31A) in Kalimpong district 29in the State of West Bengal on EPC mode [Job No. 526] Slope protection and landslide mitigation at 4 vulnerable locations (km 1.950 to Km 2.100, km 11.100 to 11.450, km 22.435 to km 22.485 and km 22.610 to km Kali 05.02.2 1032 2.680) within Sevoke- 0 152.27 Ongoing 6.86 mpon - 024 Rangpo section of NH-10 (old g NH-31A) in Darjeeling & Kalimpong district in the State of West Bengal on EPC mode [Job No. 533] Improvement of Spots (Including widening of culvert, drops & guide) from km 4.390 to km 4.585, km 5.328 to km 5.430, km 8.520 to km 9.075 (At 02 nos. of locations), km 9.335 to km 9.520 and km 12.060 to 01.03.2 Darje 104 0 Ongoing 0 - 12.235 on NH-110 (Old NH-55) 024 13.8 eling in between km 0.00 to km 20.00 of NH-110 under NH Division-IX in the District of Darjeeling, West Bengal [Job No. NH-110 (Old NH- 55)/West Bengal/2023- 24/RSEC-15] Improvement of Spots from 21.710 km to 21.838 km (including reconstruction & culvert widening), 21.921 km to 22.000 km (including drop & guides), 23.760 km to 23.800 km, 26.597 km to 06.03.2 Darje 1052 6.705 km (including drop & 0 Ongoing 9.99 - 024 13.19 eling Guides), 28.270 km to 28.340 km, 35.878 km to 35.980 km, 36.025 km to 36.135 km, 36.245 km to 36.400 km (including reconstruction & culvert widening) on NH-110 (old NH-55) in between km 3020.00 to km 40.00 of Nh-110 (old NH-55) under NH Division No.-IX in the dist. Of Darjeeling. Slope Stabilization Scheme at location of landslide at km 52.240 km of NH-110 at Tindharia, West Bengal & 22.03.2 Darje 106P ermanent Restoration of 0 15.8 Ongoing 8.71 - 024 eling damaged Road under NH Division-IX in the district of Darjeeling, West Bengal during the year 2022-23. Construction of 3 (three) nos. newsingle cell type box culvert (2.0 m X 3.0m) at chainages 54+150 km, 54+750 km, & 55+150 km of Sout NH-12(old NH-117) including 29-11- h 24- 107i mprovement offlaring portion 0 1.64 ongoing 0 --- 2024 Parg on either side of each culvert anas during the year 2024- 2025under N.H. Division No. 1, in the district of South 24 parganas, Wes tBengal. Job Number (12/WB/2024-25/553) Re-sectioning from Km 0.00 to Km 0.500, strengthening from km 0.00 to km 8.20 and km 15.00 to km 15.50 and Widening and Strengthening from km 8.20 to km 15.00 of 03-12- Darje 108 15.5 49.96 ongoing 16.07 7.70 NH-327 (Old NH-31C) in the 2024 eling district of Darjeeling under NH Division No. IX, P.W.(Roads) Directorate, West Bengal (Job No. 327/WB/2024-25/554) Repair and Rehabilitation workfor 13 nos. distressed bridges in the Birbhum district as a part ofDetailed Project Report for 4- Lanning of NH-60 (New NH-14) from 02-12- Birbh 109k m115.000 (Kharagpur) to km 0 37.58 ongoing 15.66 --- 2024 um 422.450 (Moregram) in the State of WestBengal (Package IV - Tilpara Right Canal Bridge at 342.660km, TilparaBridge at 343.950km, Khairakuri Bridge at 344.880 31km, Dwarka CanalBridge at 358.740 km, Deucha Barrage Bridge at 359.050km) Job Number (14(PKG- IV)/WB/2024-25/556) Repair and Rehabilitation workfor 13 nos. distressed bridges in the Birbhum district as a part ofDetailed Project Report for 4- Lanning of NH-60 (New NH-14) from km115.000 (Kharagpur) to km 422.450 (Moregram) in the 02-12- Birbh 110 0 31.61 ongoing 6.54 --- State of West 2024 um Bengal(Package III- Bakreswar Bridge at 322.550km ,Bramhani Bridge at398.450km and Gambhira Bridge at 418.918km ) Job Number (14(PKG- III)/WB/2024-25/555) Repair and Rehabilitation work for 13 nos. distressed bridges in the Birbhum district as a part of Detailed Project Report for 4- Lanning of NH-60 (New NH-14) from km 115.000 (Kharagpur) to 04-12- Birbh 111 0 8.74 ongoing 3.83 --- km 422.450 (Moregram) in 2024 um the State of West Bengal (Package II) MD Bazar Mini Bridge at km 350.530 & Kargil bridge at km 353.040 Job Number (14(PKG- II)/WB/2024-25/558) Repair and Rehabilitation work for 13 nos. distressed bridges in the Birbhum district as a part of Detailed Project Report for 4- Lanning of NH-60 (New NH-14) from 04-12- Birbh 112 0 7.86 ongoing 2.2 --- km 115.000 (Kharagpur) to 2024 um km 422.450 (Moregram) in the State of West Bengal (Package I). Sinjuri-Bridge at km 308.660, Sinjuri-2 at km 309.020 Chandrabhaga 32bridge at km 333.400 Job Number (14(PKG-I)/WB/2024- 25/557) Repair and Rehabilitation of 05 nos. Bridges ( Trimohini Bridge at Km 99.787, Dhalpara Bridge at km 100.390, Laskarpur Bridge at Km 101.140, Kharun Big Bridge at km 102.116 and Daks Kharun Samall Bridge at km 24-02- hin 1131 02.574) of NH-512 under 0 1.34 Completed 0.32 --- 2025 Dinaj N.H. Division No. VII, P.W. pur (Roads) Directorate in the District of Dakshin Dinajpur, West Bengal during the year 2024-25 on SBD mode. UPC:M/00512/25565/WB Job Number (512/WB/2024- 25/565). Replacement of Six numbers existing narrow/poor Minor Bridge/Culvert by suitable Waterways Structure with provision of Temporary diversion (At Three Locations) and raising of 29-03- Jalpa 114e mbankment (From km 0 16.12 ongoing 0.1 --- 2025 iguri 611.400 to km 611.820) in between km 610.00 to km 626.00 of NH-31(Old)/NH- 17(New) in the District of Jalpaiguri in West Bengal during 2024-25 Job Number (17/WB/2024-25/566) Rectification of 11 nos. Black Spots at Alamsaheb more [WB- (04)- 701, Chinpai Tapaspur Crossing IWB-(03)- 89], Chinpai Bypass[WB- (03)- 09-09- Birbh 1158 81, Tilpara BarragelwB-(02)- --- 2.32 Completed 2.39 --- 2024 um 651, Joypur Bust Stand [WB- (O4l-721, Khirakuri Bus stand[WB-(O2l-4721, Seorakuri more WB-(04)- 1271, Deucha BridgelwB-(02)- 333 1 l, Katitala More[WB-(04)- 126], Bahina more[WB-(04)- 125], Lakhibati more[WB-(04)- 71] NH-14 (Otd NH-60) under N.H. Division No. Xll in the district of Birbhum during the year 2024-25 on SBD mode (Job No.NH-14(old NH- 60)/West Bengal/2024- 25/RSCE-04) Rectification of 10 nos. Black Spots of NH-512 Kadighat - WB-(04)-96 & Kalitala - WB- (04)-95 (Km 41.300 to Km 42.500), Gangarampur Bus- Stand (WB-(04)-94, Km 43.400 to Km 44.700), Kaldighi Kishan Mandi (WB-(04)-97, Km 46.350 to Km 47.100), Patiram Taltala (WB-(03)-114, Km 70.600 to Km 71.400 Km), Paranpur (WB-(03)-113, Km 77.000 to Km 77.950 Km), Tank More (WB-(04)-91, Km 79.900 to Km 80.600 Km), Hili More - WB-(04)-90 Daks with Balurghat Bus-Stand 18-09- hin 116 0 1.34 Completed 1.22 --- WB-(04)-92 (Km 82.100 to Km 2024 Dinaj 82.800 Km), Kamarpara (WB- pur (02)-356, Km 90.150 to Km 90.850 Km) and Trimohini Bus Stop (WB-(04)-98, Km 98.900 to Km 99.700) and construction of road humps at Balurghat Hospital More, Near Asutosh Balika Vidyalaya and Badamail Bazar over NH-512 under Blaurghat N.H. Sub-Division of N.H. Division No. VII in the district of Dakshin Dinajpur during the year 2024-25(Job No.NH-512/West Bengal/2024- 25/RSCE-03) "Permanentrectification of 5 nos. newly identified Black Sout Spot locations betweenKm. 18-09- h 24- 1173 4.00 to Km. 56.00 and Km. 0 4.56 Completed 3.11 --- 2024 Parg 64.00 to Km. 80.00 on NH-12 anas (old NH-117)in the District of South 24 Parganas in West 34Bengal for the year 2024- 2025 (Job No.NH-117West Bengal/2024-25/RSCE-05) 06.03.2 Jalpa 118 Binnaguri Bypass 5.5 305.17 Ongoing 0 0 025 iguri Construction of 2 nos of Flyover on Omarpur Junction Murs and on Dhulian Junction of 28.03.2 119 4.2 191.94 Ongoing 0.07 hidab 0 NH 12 (old NH 34 ) in the 025 ad State of West Bengal under NHDP Phase III on EPC Mode Valley side protection works from km. 25.80 to km 26.65, km 26.75 to km 27.20 & km 27.41 to km 27.48 to restore Sanctioned Kali 06.04.2 120d amages by flash flood in 0 49.22 but not yet 0 mpon - 024 2023 of NH-10 in the District awarded g of Kalimpong during the year 2024-25 on EPC mode [Job No. 548] Widening of Valley side at 3 locations viz. Km 20.900, Km 35.500 and Km 36.700 and culvert at 13 locations viz. Km 17.600, Km 17.800, Km Sanctioned Kali 06.04.2 1211 8.300, Km 20.200, Km 0 75.85 but not yet 0 mpon - 024 21.500, Km 21.650, Km awarded g 21.850, Km 32.800, Km 33.100, Km 38.300, Km 40.300, Km 43.700, Km 47.300 [Job No. 547] Improvement of Spots including reconstruction and widening of Culverts in between Ch. km 40.000 to km 23.12.2 Darje 1226 5.000 of NH-55 (New NH- 0 31.18 Ongoing 8.77 - 024 eling 110) under NH Division – IX (I) in the District of Darjeeling, West Bengal in the FY 2024-25 Specialized Slope Protection Work of Section from Km. Kali 25.600 to Km. 26.100 31.03.2 Yet to be 123 0.5 86.66 - mpon - (Bagrakot - Kafer) of NH - 717 025 awarded g A in the State of West Bengal on EPC mode [Pkg - IVC] 35Widening and Upgradation of existing carriageway into 2L+PS configuration from Kali Lavamore (Km. 61.10) to 31.03.2 Yet to be 124 18.6 522.35 - mpon - Start of Pedong Bypass (Km. 025 awarded g 79.700) along NH-717A in the state of West Bengal [Pkg- VA(i)] Slope Protection and Landslide Mitigation at 3 Vulnerable Locations (km 6.50 to km 6.705 km, 7.17 to km 7.25, and km 22.80 to km Sanctioned Kali 27.03.2 1252 2.95) within Sevoke Rangpo 0 57.21 but not yet 0 mpon - 025 Section of NH-10 (old NH awarded g 31A) in the district of Kalimpong in West Bengal during FY 2024-25 [Job No. 32] Rehabilitation of land slide location along with slope protection and drainage Sanctioned Kali improvement at Paglajhora 06.02.2 126 0 32.4 but not yet 0 mpon - on NH-55 (km 43.500 to km 025 awarded g 43.950) in Phase-I in Darjeeling District of West Bengal- Balance Work. Reconstruction of Distressed Minor Bridge over Dhari Jhora (Km 617.945) of NH-31( New NH-17) under NH 06-05- Jalpa 127 0 19.29 ongoing 0 --- Division IX (PWRD) in the 2025 iguri district of Jalpaiguri West Bengal(Job No.NH- 17/WB/2025- 26/568) Rehabilitation & Restoration of 3 (three) nos. bridge at chainages 95.296 km (Jora Pole Bridge), 99.200 km (Kalnagini Bridge) & km Sout 79.065 (Karanjali Bridge) of 08-05- h 24- 128N H-117 (New NH-12) under 0 1.23 ongoing 0 --- 2025 Parg Reconstruction/Repair/ anas Rehabilitation of Bridge/ Culverts under Annual Plan of works under NH(O) on SBD mode (Job No. Br./12/WB/2025- 26/567) 36Construction of RCC Drain for a total 8.06 km length from Km 84.100 to Km 84.360 (RHS) at Paschim Rainagar, Balurghat, Km 91.500 to Km 92.700 (RHS) and Km 91.400 to Km 91.920 (LHS) at Badamile, Km 93.700 to km 94.920 (BHS) at Tior & km Daks 104.660 to km 106.160(RHS), 20-05- hin 129 0 13.54 ongoing 0 --- km 106.380 to km 106.600 2025 Dinaj (RHS), km 104.400 to km pur 106.100 (LHS) & km 106.380 to km 106.600 (LHS) at Hili of NH-512 under NH Div. No. VII, P.W. (Roads) Directorate in the district of Dakshin Dinajpur West Bengal on EPC Mode (Job No.NH- 512/WB/2025- 26/569) Widening & Strengthening work (existing 2 lane carriageway to 2 lane with paved shoulder configuration) from km. 114.975 to km. 137.684 of Sout NH-117 [New NH-12] 03-10- Not h 24- 130( excluding two major bridges 22.709 237.08 0 0 2025 awarded Parg of approx. 1.40 km length anas from km 118.848 to km 119.506 & km 127.926 to km 128.668) in the district of South 24 Parganas, West Bengal. (Job No.NH-117(New NH-12)/WB/2025-26/571) (A) Repair and rehabilitation of 5 Nos bridges at km 53.400(Amar kutir Irrigation Canal Bridge, Length =21.8 m), km 54.497(Ballavpur Sal Bridge, Length =111.2 m), km 69.305 (Length=30.0 m), km 72.512 27-10- Birbh 131 0 2.64 Awarded 0 0 (Hattikra Bridge, Length 2025 um =123.00 m), and km 72.512 (Hattikra Bridge, Length =123.00 m), and km 73.402 (Length =29.0 m) of NH-114 (B) Repair & Rehabilitation of 03 bridges (Alam Baba Bridge) at km 321.509, 37(Sadaipur Bridge) at km 327.400, (Galakataat bridge) at km 331.412 of NH-14 under NH Division-XII, P.W.(Roads) Directorate in the District of Birbhum on SBD mode. (Job No. NH-114&NH-14/WB/2025- 26/572) Reconstruction of distressed Minor Bridge over River Bania Jhora, Major Bridge over River Bhandari-II & Bhandari- III at Km 191.25, Km 195.866 16-12- Not Alipu 132 0 68.17 0 0 & Km198.161 respectively in 2025 awarded rduar the district of Alipurduar, West Bengal in EPC mode (Job No. NH-31C(New NH- 317)/WB/2025-26/573) 929.32 758.94 2 18890.32 11325.78 4 ***** 38