See Full Document Text
GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 6270
ANSWERED ON 02ND APRIL, 2026
SAFETY AND STRUCTURAL CONCERNS IN NH-66, KERALA
6270. SHRI SHAFI PARAMBIL:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) whether the Government is aware of reports alleging structural damage and
safety concerns in certain stretches of National Highway (NH)-66 from
Kasaragod to Thiruvananthapuram;
(b) whether the National Highways Authority of India (NHAI) has initiated a
safety audit of the entire stretch and the present status thereof;
(c) whether soil quality, topography and high rainfall conditions specific to
Kerala were adequately considered in the design and construction
methodology adopted for NH-66;
(d) whether the Government proposes to review the construction model
adopted, particularly the use of embankments in vulnerable areas; and
(e) whether directions would be issued to adopt elevated highway structures in
geotechnically sensitive and flood-prone stretches to ensure long-term stability
and public safety, if so, the details thereof?
ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)
(a) to (e) In Kerala, instances of failures during construction have been
reported including Retaining Soil (RS) Wall failure at Kooriyad (19.05.2025),
girder collapse at Aroor–Thuravoor (13.11.2025), and RS Wall failure at
Mylakkadu (05.12.2025).Expert Committees comprising Indian Institutes of Technology (IITs), Central
Road Research Institute (CRRI), Geological Survey of India (GSI) and IIT
Palakkad examined vulnerable locations and submitted reports on the cause of
accidents and remedial measures. Safety audits have also been carried out in
various select stretches of NH-66. The observations, inter alia, relate to soil
conditions, bearing capacity, terrain characteristics and high rainfall
conditions, as well as adequacy of ground non-improvement and fill material in
embankment/RS wall locations.
Geotechnical investigations have been carried out at RS wall locations; design
aspects have been reviewed, including consideration of structural alternatives
at select locations.
Structural options, including use of viaduct/elevated structures at select
locations, have been considered based on technical and site-specific factors.
*****