GOVERNMENT OF INDIA
MINISTRY OF HOUSING AND URBAN AFFAIRS
RAJYA SABHA
STARRED QUESTION NO. 94
ANSWERED ON 09/02/2026
SMART CITY MISSION IN GUWAHATI
*94. MS. SUSHMITA DEV:
Will the Minister of HOUSING AND URBAN AFFAIRS be pleased to state:
(a) the total funds allocated, released and utilised in Guwahati under Smart City Mission during the last three
years, year-wise;
(b) the component-wise break-up of funds, including expenditure on roads, drainage, water supply, solid
waste management, housing, ICT and other sectors;
(c) the total funds allocated and utilised specifically for drainage under the Mission;
(d) the number of drainage and flood-mitigation projects sanctioned and completed/ongoing in Guwahati,
along with their present status; and
(e) whether any proposal has been approved or is under consideration for inclusion of Silchar under Smart
City-related flood mitigation project/programme?
ANSWER
THE MINISTER OF HOUSING AND URBAN AFFAIRS
(SHRI MANOHAR LAL)
(a) to (e): A Statement is laid on the Table of the House.STATEMENT REFERRED TO IN REPLY OF PARTS (a) to (e) OF THE RAJYA SABHA
STARRED QUESTION NO. 94 FOR ANSWER ON 09.02.2026 REGARDING SMART CITY
MISSION IN GUWAHATI
(a) Guwahati is selected under the Smart Cities Mission (SCM) from the State of Assam. As reported by the
State, as on 15.01.2026, out of a total 21 projects amounting to ₹755 Cr, 20 projects (95% of total
projects) amounting to ₹746 Cr have been completed and 01 project amounting to ₹9 Cr is at
implementation stage. Guwahati has been able to claim its entire central financial assistance of ₹490 Cr
and has completely utilized the same.
(b) to (d) The objective of SCM was not the development of entire city but to follow an area-based
development approach through retrofitting, redevelopment, greenfield development and a Pan-city
initiative in which smart solutions are applied covering larger parts of the city, so as to create a replicable
model. Under the Mission, states were empowered to select, appraise and implement projects as per their
priorities and scheme guidelines. The project proposals were approved by High Powered Steering
Committee (HPSC) chaired by the Chief Secretary of the State.
The details of projects undertaken in various sectors in Guwahati Smart City is at Annexure.
(e) With the closure of the SCM on 31st March, 2025, there is no budgetary provision under the Mission to
take any other city.
*****Annexure
Annexure referred to in reply for part (b) to (d) of Rajya Sabha Starred Question No. 94* (4th Position) for
answer on 09th February, 2026 regarding Smart City Mission in Guwahati.
Sector-wise details of projects in Guwahati:
(Amount in ₹ Cr)
S. City Project Name Sector Total Physical Status
No. Name Project Progress
Cost
1 Guwahati Brahmaputra River Front Development (Phase 1) Area 181 100 Work
Development Completed
2 Guwahati Installation of National Flag at Gandhi Mandap Area 3 100 Work
Development Completed
s3 Guwahati Development of Judge Field Area 6 100 Work
Development Completed
4 Guwahati Miscellaneous Infra & Deposit work - Brahmaputra Area 44 100 Work
River Front part works Development Completed
5 Guwahati Procurement of Drain De-Silting Super Sucker Sewerage 26 100 Work
Machines with Dump Storage (10nos) and Septage Completed
6 Guwahati Installation of Water ATMs Water 2 100 Work
Supply Completed
7 Guwahati Installation of Smart Bio-Toilets Solid Waste 10 100 Work
Management Completed
8 Guwahati Installation of High Mast Light Pole at Shankardev Energy 1 100 Work
Kalakshetra Completed
9 Guwahati Implementation of Street Light Poles under Project Energy 15 100 Work
Jyoti Phase II scheme on design build operate basis Completed
with operation and maintenance
10 Guwahati Installation of LED Street Lights in selected Spine Energy 23 100 Work
Roads Completed
11 Guwahati Installation of LED Street Light under "Project Jyoti - Energy 14 100 Work
Phase 1" Completed
12 Guwahati Procurement of 200 (two hundred) Air-Conditioned Urban 295 100 Work
electric buses for Guwahati City Transport Completed
13 Guwahati Procurement of 100 (one hundred) Air Conditioned Urban 38 100 Work
CNG operated Buses for operation in Guwahati City Transport Completed
and connecting sub-urban areas
14 Guwahati ITMS Based- Integrated Traffic Management System Urban 46 100 Work
(Phase 1) Transport Completed
15 Guwahati Gandhi Mandap Light and Sound SHow Economic 6 100 Work
Development Completed
16 Guwahati Redevelopment and Improvement of Gandhi Economic 3 100 Work
Mandap Development Completed
17 Guwahati Development of Museum and Maintenance/Repair of Economic 5 100 Work
the Gandhi Mandap Development Completed
18 Guwahati Development of Ashwaklanta Devalaya Premises Economic 11 100 Work
Development Completed
19 Guwahati Development of Umananda Devalaya Premises Economic 14 100 Work
Development Completed
20 Guwahati Streetscape for Beautification at Sankardev Economic 5 100 Work
Kalakshetra Development Completed
21 Guwahati Installation of Illumination and Technology (Laser) Economic 9 95 At
based show at Shankardev Kalakshetra Development implementation
stage
Total 755