Home India ROAD TRANSPORT AND HIGHWAYS Parliament Question: Status of Ongoing National Highway Proj...
Date: 2026-03-12 Category: LOKSABHA_QNA State: Union Government Country: India

Parliament Question: Status of Ongoing National Highway Projects in Telangana

Issued by ROAD TRANSPORT AND HIGHWAYS · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO. 3357 ANSWERED ON 12TH MARCH, 2026 Status of ongoing National Highway Projects in Telangana 3357. Shri Kunduru Raghuveer: Will the Minister of ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन औि िाजमार्ग मंत्री be pleased to state: (a) the total number of National Highway projects that are ongoing or recently sanctioned in the State of Telangana during the last five years, indicating the total length involved and the sanctioned cost thereof; (b) the present physical and financial progress of each of these projects, district-wise; (c) the timelines fixed for completion of these projects; (d) whether any delays have been reported due to land acquisition issues, forest or environmental clearances, contractor performance, fund constraints and if so, the details thereof; (e) the steps taken by the Government to ensure quality control, transparency and timely completion of highway works in Telangana; and (f) whether the Government proposes to prioritize highway development in backward and semi-urban districts of Telangana to promote industrial growth and improve connectivity and if so, the details thereof?ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a), (b), (c) & (d) The details are enclosed as Annexure-A. (e) The Government has taken several steps to ensure quality control, transparency, and timely completion of National Highway works. These include transparent e-tendering, quality checks by Independent Engineer/ Authority’s Engineer, third-party quality inspections by Independent Quality Auditor, using digital monitoring systems, and linking contractor payments to project milestones. Strict penalties are imposed for delays or poor-quality work, ensuring better execution of highway projects. All the NH projects are constructed and maintained duly following the prescribed standards and specifications, India Road Congress (IRC) codes and manuals to ensure the quality of the NHs. Regular review meetings are being conducted to monitor the progress of works to resolve the issues causing delays. Also, the State Government is regularly conducting Interdepartmental coordination meetings with all stakeholders on pre-construction activities like Land Acquisition, Forest clearances and shifting of Utilities to ensure hindrance free and speedy implementation of the projects to complete within time schedule. (f) The Government in the Ministry of Road Transport & Highways receives proposals from various State Governments/ Union Territories (UTs), from time to time, for declaration / upgradation of State Roads, including backward region and semi-urban districts, as National Highways (NHs). Decisions are taken to notify State Roads as NHs from time to time based on the broad principles of declaration of NHs, requirement of connectivity, traffic density and synergy with PM Gati Shakti National Master Plan (NMP).Annexure-A REFERRED TO IN REPLY TO PART (a), (b), (c) & (d) OF LOK SABHA UNSTARRED QUESTION NO. 3357 ANSWERED ON 12th March, 2026 ASKED BY SHRI KUNDURU RAGHUVEER REGARDING STATUS OF ONGOING NATIONAL HIGHWAY PROJECTS IN TELANGANA Likel y Phy date Fina Total sic of ncia S. projec Leng al Major Distric Name of the comp l N0 t cost th pro reasons t project letio prog . (Rs.Cr (Km) gre for delay Name n ress .) ss (DD. (%) (%) MM.Y YYY) Construction of six lane Elevated Corridor from km.7/950 (Uppal) Land to km.14/200 of Acquisitio Medcha NH-163 to De- 31.08.2 n, EPC l 1 626.76 6.25 50 48 Congest the Urban 027 contractor' Malkajgi Limits of s Financial ri Hyderabad- issues. Bhoopalapatnam Section on EPC mode Improvements and widening to 6 lane + PS with drains from km 14/200- Medchal 30.06.2 Forest 2 18/600 of 48.32 4.4 84 83 Malkajgi 026 Clearance Hyderabad - ri Bhoopalapatnam section of NH-163 in the state ofTelangana Nizampet - Bidar- Telangana/Karnat Land aka Border) 31.12.2 Acquisitio Sangare 3 section of NH- 512.98 45.946 40 34 026 n, Forest ddy 161B clearance 2L+PS from km 0/0 to km 45/946 Rehabilation and upgradation of LB nagar to Malkapur section to 6-lane main cariageway with service road, drains , come Rangare footpath , Encroach ddy 31.07.2 4 including VUPs 545.11 22.492 79 77 ments ,Yadadri 026 and widening of issues. Bhuvana minor bridge & giri road safety provision from Km 15/00 to Km 40/00 of NH-63 (old NH- 9) under NH(O) for the year 2020-21 6 Lanning of Pune- Hyderabad section of NH-65 from km 493+00 to 524+000 from Sangare Sangareddy X Land 31.03.2 ddy, 5 Road to 1297.75 29.35 34 32 Acquisitio 027 Rangare Madinaguda n ddy (Excluding BHEL Flyover from Km 520+000 to Km 521+650) in the State ofTelangana Construction/ Reconstruction of 4 lane ROB in Jadcherla town in Railway Km 17+000 to Km 31.10.2 clearance, Mahabu 6 18+000 45.81 1 67 66 026 Land bnagar of Jadcherla - acquistion Kalwakurthy section of NH- 167in the state of Telangana Widening to two lane with paved shoulders from Km 0/000 to Km 79/300 of Kalwakurthy - Land 30.06.2 Nagarku 7 Kollapur section 886.69 79.3 80 77 Acquisitio 026 rnool of NH-167K in the n State of Telangana under Annual Plan 2021- 22 on EPC mode under NH(O) Construction of 4 lane with paved shoulders Bypass to Nalgonda Town from design Km 0.000 to 14.000 Land 06.10.2 Nalgond 8 (length 14.00Km) 516.17 14 23 16 Acquisitio 027 a (Existing Ch Km n 18/710 to 28/685) of Nakrekal to Nagarjunasagar section of NH-565 in the state ofTelangana on EPC Mode under Annual plan 2024- 25 Widening & strengthening to 2 Lane/4lane with Mahabu paved shoulders Land bnagar, from km 0+000 to 31.12.2 Acquisitio Narayan 9 703.68 60.255 91 88 km 60+255 of 026 n & Forest pet & Mahabubnagar - Clearance Vikaraba Chincholi section d of NH-167N in the state of Telangana Widening & strengthening to 4lane/2 lane with paved shoulders Railway of Mahabubnagar - clearance Chincholi section 31.12.2 and Slow Vikaraba 10 from km 60+255 to 631.49 42.579 34 30 026 progress d Km 102/834 of NH- by EPC 167N in the state contractor of Telangana under Annual Plan 2021-22 on EPC mode Rehabilitation and Forest upgradation of NH- Clearance 365 from Design Waranga 31.05.2 and slow 11 km.121/0 to 154/0 192.67 33 96 93 l,Mahab 026 progress to two lane with ubabad by EPC paved shoulders contractor on EPC mode Widening and Land Hanuma Strenthening of 30.04.2 12 317.19 29.6 83 80 Acquisitio konda,M Existing 2L+PS to 026 n ulugu 4 lane +PS fromKm 150+000 to Km 159+000 & from Km 165+400 to Km 186+000 of NH-163 (Old NH- 202) under NH(O) - TSP for the year 2020-21 on EPC mode in the state of Telangana Strengthening and improvement of Road Safety of Hyderabad - LWE Bhupalapatnam affected section of NH-163 area (Law from km 215/0 to 31.05.2 and order) 13 231/0, km 236/0 to 48.2 39.7 94 89 Mulugu 026 and Slow km 247/0, km progress 294/6 to km 307/3 by EPC in the state of contractor Telangana under Annual Plan 2021- 22 on EPC mode under NH(O)-TSP Improvement of Road Safety through LWE rectification of affected identified Black area (Law Spot ID TG (02)- 31.03.2 and order) 14 249 by Permanent 10.08 1.04 82 66 Mulugu 026 and Slow improvement of progress junctions near by EPC Peddagollagudem contractor from km 287.200 to km 288.240 of Warangal Mulugusection of NH-163 Widening of existing 2 lane road to 2 lane with Paved shoulders configuration from km 279/150 to LWE 290/500 affected (excluding from area (Law km 287/200 to 31.08.2 and order) 15 136.22 10.31 30 17 Mulugu 288/240) section 026 and Slow of NH-163 of progress Hyderabad - by EPC Bhupalapatnam contractor road in the state of Telangana on EPC mode under Annual Plan 2022- 23 One time improvement to Mahabubabad to Nellikuduru stretch from Km 0/0 to 7/0 (Bypassed stretch) & Km Slow 26/100 to 30/200 21.04.2 progress Mahabu 16 (Bypassed 29.61 21.5 36 28 026 by babad stretch), Thorrur Contractor to Nellikuduru stretch from Km 0/0 to 3/0 (Bypassed stretch), Thorrur to Valigonda stretch from Km 0/0 to 5/600(Bypassed stretch) & Mahabubabad to Yellandu stretch from Km 0/6 to 2/4 (Bypassed stretch)of Gowrelly to Kothagudem road of NH 930P in the state of Telangana Rehabilitation and upgradation of NH- 221 (new No.30) from km.121/0 to 165/0 (Rudrampur- Under Contractor Bhadadri Bhadrachalam 17 334.82 43.185 Termin 80 80 financial Kothagu Section) in the ation issues dem State of Telangana to two lanes with paved shoulders under NHDP-IV on EPC Construction of HLB across river Godavari at Contractor Bhadadri km 166/0 of NH 31.07.2 18 98.45 2.4 94 94 financial Kothagu 221 under Annual 026 issues dem Plan on EPC mode in the State of Telangana. Improvement from Km 182/570 to Km 187+723 and link Land 30.06.2 Nalgond 19 road including 124 5.47 84 82 Acquisitio 026 a widening of road n from Km 185/230 to Km 185/920 ofNH-167 in the Municipality limits of Miryalaguda town Permanent rectification of black spots at TG- (02)-115 (km 39/6 to 40/10), TG-(02)- 448(38/650- 39/1s0), TG (02)- 387(41/4-41/9), TG- (02)-388 (km 43/8- 44/3) including 31.05.2 Shifting of Khamma 20 improving road 57.52 7.05 82 62 026 utilities m safety and the riding quality of the road surface and Junction at Km.38/875, 40/775, 41/75O , 43/410 on Khammam-Kurvi section ol NH- 365A Widening to 2 lane with paved shoulders from km 34/250 to km Land 71/675 of 31.12.2 Khamma 21 445.76 37.425 4 3 Acquisitio Khammam-Kuravi 027 m n Section of NH- 365A on EPC mode in the State of Telangana Rehabilitation and Land Yadadri 30.04.2 22 Upgradation of 549.28 69.12 93 89 Acquisitio Bhongir, 026 Valigonda Thorrur n Mahabusection to two babad lane with paved shoulders from Km 39.180 to Km 108.30 of NH-930P Widening and improvement of existing carriageway to two lane with Land 31.08.2 Jangaon 23 paved shoulder 423.48 45.57 75 73 Acquisitio 026 ,Siddipet from km 86/160 to n Km 131/730 of Duddeda to Jangaon section of NH-365B Widening to 2 lane with paved shoulders of 'Bodhan - Basar - Bhainsa' section Land Nirmal & from Km 38/900 to 30.03.2 24 644.45 56.4 99 96 Acquisitio Nizamab Km 95/300 of NH- 026 n ad 161BB in the state of Telangana under Annual Plan 2021-22 on EPC mode under NH(O) Widening to 2 lane with paved shoulders from Km 0+00 to km Land 32+970 of 03.05.2 25 490.92 32.62 59 55 Acquisitio Adilabad Adilabad - bela 026 n section of NH 353B in the State of Telangana on EPC Mode underAnnual Plan 2022- 23 on EPC mode. Widening to 4 lane for the permanent rectification of 7 black spots falling 31.07.2 Forest Mancher 26 in Km 170.250 to 59.79 9.8 51 40 026 Clearance ial 180.60 on Nizamabad - Jagadalpur section of NH-63 Widening to 2 lane with paved shoulders of Forest Siddipet - Siddipet, 30.06.2 Clearance 27 Elkathurthy 578.85 63.641 86 85 Hanuma 026 and land section from km konda acquistion 69/978 to Km 133/619 of NH-765 DG Widening to 2 lane with paved shoulders of Forest Medak - Siddipet 30.06.2 Clearance Medak & 28 section from km 882.18 69.978 74 73 026 and Land Siddipet 0/000 to Km acquistion 69/978 of NH-765 DG in the state of Telangana Widening to 2 lane with paved shoulders from Km 62/920 to Km Medak & 20.08.2 Forest 29 106/830 of Medak - 399.01 43.9 63 60 Kamare 026 Clearance Yellareddy ddy Section of NH- 765D in the state of Telangana onEPC mode under NH(O) under Annual plan 2022- 23 Widening to Two lane with paved shoulders from 106/830 to 158/496 of Kamare Yellareddy - 05.07.2 Forest ddy & 30 Rudrur Section of 499.88 51.7 54 53 026 Clearance Nizamab NH-765D in the ad state of Telangana on EPC mode under NH(O) under Annual plan 2022- 23 One time improvement of left over stretches (at Bypasses and realignment stretches) on NH 365 Nakrekal – Tanamcherla Nalgond section from km 23.07.2 31 18.72 28.67 20 - No issues a & 0/0 to 72/0 and 026 Suryapet NH-167 Miryalaguda – Kodad Section Km 187.723 to 234.434 in Telangana State under Annual Plan 2024-25 One time 14.04.2 Nizamab 32 improvement from 4.97 4.8 80 - No issues 026 ad Km 0/7 to 2/7, Km4/3 to 5/6, Km 6/0 to 7/5 of Maharashtra State Border to Bodhan section of NH -63 extended in the state of Telangana Construction of Foot Over Bridge at Km 24/570 of Nakrekal Nagarjunasagar 08.07.2 Nalgond 33 4.9 0 10 - No issues section of NH-565 026 a in Telangana State under Annual Plan 2024- 25 on EPC mode Improvement of riding quality from Km 668+315 to Km 671+555 of Nirmal- Khanapur 07.07.2 34 14.54 3.24 3 - No issues Nirmal section of NH 61 026 in the State of Telangana under Annual Plan 2024- 25 Six laning of Intenti existing 4-lane on to from Km 22.300 termin (Thondupally) to ate due Contractor Km 34.144 to poor Ranga 35 527.43 12 17 14 financial (Kothur) on perfor Reddy issues Hyderabad to mance Bangalore section of of NH-44 on EPC Contra mode ctor 36 Four laning of NH - 1138.99 46.41 26.11.2 10 5 Environme Rangare163 from 026 ntal ddy & Hyderabad (ORR clearances Vikaraba near Appa issues and d Junction at Km. Concessio 14+000) to naire Manneguda (Km. financial 59+500) in the issues State of Telangana 22.04.2 026 Six laning of (Intenti Km.471 on to Medchal (Gundlapochampal termin Contractor - 37 ly) to Km.481 528.21 10.03 ate due 50 46 financial Malkajgi (Bowenpally) of to poor issues ri Nagpur-Hyderabad perfor Section of NH-44. mance of Contra ctor) Six laning with Elevated corridor Delay due from Km.454.000 to change Medak (Kalakallu) to in design & Medch Km.471.000 30.07.2 38 903.17 17 36 35 and al - (Gundlapochanpall 026 Contractor Malkajgi i) of Nagpur - financial ri Hyderabad issues Section of NH-44 on EPC mode. Construction of 6 lane Access Concessio Jogulam Controlled 30.06.2 naire 39 1044.06 39.3 84 84 ba Highway of 026 financial Gadwal Nandinne village issues to Julekal villagefromKm.202.900 to Km.242.200 under BM (Akalkot-Kurnool Section) (Package-I) Construction of 6 lane Access Controlled Delay in Highway of approval of Jogulam Julekal village to Design and ba Dinnedevarapadu 30.09.2 40 1315.87 38.2 63 63 Concessio Gadwal village from 026 naire & Km.242.200 to financial Kurnool Km.280.400 under issues BM (Akalkot- Kurnool Section) (Package-II) Four laning of Karimnagar to Warangal section of NH-563from Design Ch.48.860 (near SH-1 ch.170.400) at Manakondur bypass to Design Karimna Land Ch.116.875 30.07.2 gar & 41 2486.51 68.02 89 92 Acquisitio (existing 026 Waranga n Ch.144.050 on NH- l 163) at Palvelpula near Hanamkonda as part of Jagital – Karimnagar – Warangal Section of NH-563in the State of Telangana (HAMMode) 4 lane AC New Greenfield Highway Sec on NH-163G (Mancherial Concessio Warangal) from 22.12.2 naire Mancher 42 Narva to 1104.2 31.47 5 - 026 financial ial Puttapaka as part issues of Nagpur Vijayawada Corridor on HAM in Telangana (Package I) 4lane Greenfield Highway Section of NH-163G Land (Mancherial Peddapa acquisition Warangal) from lli & , forest Puttapaka to 12.06.2 Jayasha 43 1145.24 37.05 5 - and Pangidipalle as 027 nkar Concessio part of Nagpur Bhupala naire Vijayawada pally issues Corridor on HAM in Telangana (Package II) 4 lane AC New GF Highway Sec on NH-163G Land (Mancherial Jayasha acquisition Warangal) from nkar , forest Pangidipalle to 12.06.2 Bhupala 44 1170.64 39.89 - - and Oorugonda as part 027 pally & Concessio of Nagpur Hanuma naire Vijayawada konda issues Corridor on HAM in Telangana (Package III)4-Lane AC GH section on NH- 163G (Warangal- Khammam) from Land Oorugonda village acquisition Waranga to Venkatpur 12.06.2 and l & 45 1140.82 38 - - village as part of 027 Concessio Hanuma Nagpur naire konda Vijayawada issues Corridor on HAM in Telangana (Package-I) Construction of 4 Lane Access Controlled Greenfield Highway section on NH-163G (Warangal- Khammam) Waranga Land Venkatpur village 31.12.2 l & 46 1083.11 39.41 59 59 Acquisitio in Warangal 026 Hanuma n District at Design konda Ch. 150.240 Km to Thallasenkesa village in Mahabubabed District at Design Ch. 189.650 km(Package-II) Construction of 4 Lane Access Controlled Land Greenfield 18.03.2 Khamma 47 1021.96 29.92 32 32 Acquisitio Highway section 027 m n on NH-163G (Khammam- Vijayawada) fromV. Venkatayapalem village at Design Ch.220.480 Km to Brahmanapalli(K) village at Design Ch.250.400 Km (Package-I) 4-Lane AC GH section on NH- 163G (Khammam- Vijayawada) from Land Brahmanapalli(K) acquisition village to 25.03.2 and Khamma 48 Remidicherla 862.58 29.8 11 11 027 Concessio m village as part of naire Nagpur issues Vijayawada Corridor on HAM in Telangana and AP (Package-II) Construction of 4- Lane Access Controlled Greenfield Highway section on NH-163G Land (Khammam- acquisition Khamma Vijayawada) from 06.05.2 and m and 49 Remidicherla 1225.14 29.71 2 2 027 Concessio NTR village to naire District Jakkampudi issues village as part of Nagpur Vijayawada Corridor on HAM in Telangana (Package-III)4-Lane AC GH section on NH- 163G (Warangal- Khammam) from Thallasenkesa Land Mahabu village to 03.07.2 acquisition babad & 50 V.Vekatayapalem 1098.05 30.83 2 2 027 and Forest Khamma village as part of issues m Nagpur Vijayawada Corridor on HAM in Telangana (Package-III) Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG Khammam- Devarapalle from Thallampadu village to Land 03.05.2 Khamma 51 Somavaram 1337.18 33.604 92 92 Acquisitio 026 m village (Design Km n 0+000 to Km 33+604) of length 33.604 km in the states of Telangana under Bharatmala Pariyojana on Hybrid Annuity Mode (Package-I) Upgradation to Rangare Two Lane with ddy, 52 690.33 41.92 Paved Shoulders Yadadri Recently awarded from Km 0.000 to BhuvanaKm 41.92O (Green giri Field Alignment) of Gowrelty to Valigonda Section of NH-930P in the State of Telangana on EPC Mode under Annual Plan 2022- 23 Rehabilitation and Up gradation of Thorrur to Nehru Nagar Section to Two Lane with Paved Shoulders from Km 109.420 Mahabu 53 675.45 69.08 to Km 178.500 of babad Recently awarded NH-930P in the State of Telangana on EPC mode under Annual Plan 2022- 2023 Construction of Iconic Hybrid Cable Stayed and Suspension Bridge Across Krishna River on NH -167K (Design Chainage Nagarku 54 1082.56 1.08 km 87+360 to km rnool Tendering stage. 88+437) in the State of Telangana and Andhra Pradesh on EPC Mode Under NH(O)Rehabilitation and Upgradation to 2/4 lane with paved shoulders from Km 79/300 to Km 87/360 & Km 88/437 to Km 93/819 of NH-167K (Bridge Approaches of Nagarku 55 436.91 13.44 Iconic Bridge rnool Tendering stage. across river Krishna) in the State of Telangana and Andhra Pradesh on EPC mode under NH(O) under Annual plan 2022- 23 Rehabilitation and Up gradation of Nehru Nagar to Kothagudem junction Section to Two Lane/ four Bhadadri 56 lane with Paved 826.71 52.08 Kothagu Shoulders from Tendering stage. dem Km 178+500 to 230.58 of NH-930P in the State of Telangana on EPC basis Widening to 4 Jayashn Lane + PS from akar 57 Km 67/200 (Design 662.67 41.339 Bhupalp Km 67/200) to Km Tendering stage. ally 108/556 (DesignKm 108/542) of Sironcha-Atmakur Section of NH 353C in the State of Telangana on EPC Mode under Annual Plan 4-Laning of Gudebellur (Design Km. 182+930) to Junction with NH 167N (Bhootpur – Chincholi Road) Narayan near Palamuru pet& 58 University (Design 3175.08 80.01 Tendering stage. Mahabu Ch. 262+940) in bnagar Hyderabad - Panaji section of NH-167 (Length 80.01km) under NH(O) in the State of Telangana on HAM Mode *****

Continue your research