GOVERNMENT OF INDIA
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
LOK SABHA
UNSTARRED QUESTION NO. 3357
ANSWERED ON 12TH MARCH, 2026
Status of ongoing National Highway Projects in Telangana
3357. Shri Kunduru Raghuveer:
Will the Minister of ROAD TRANSPORT AND HIGHWAYS
सड़क परिवहन औि िाजमार्ग मंत्री
be pleased to state:
(a) the total number of National Highway projects that are
ongoing or recently sanctioned in the State of Telangana during the
last five years, indicating the total length involved and the
sanctioned cost thereof;
(b) the present physical and financial progress of each of these
projects, district-wise;
(c) the timelines fixed for completion of these projects;
(d) whether any delays have been reported due to land acquisition
issues, forest or environmental clearances, contractor performance,
fund constraints and if so, the details thereof;
(e) the steps taken by the Government to ensure quality control,
transparency and timely completion of highway works in Telangana;
and
(f) whether the Government proposes to prioritize highway
development in backward and semi-urban districts of Telangana to
promote industrial growth and improve connectivity and if so, the
details thereof?ANSWER
THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS
(SHRI NITIN JAIRAM GADKARI)
(a), (b), (c) & (d) The details are enclosed as Annexure-A.
(e) The Government has taken several steps to ensure quality
control, transparency, and timely completion of National Highway
works. These include transparent e-tendering, quality checks by
Independent Engineer/ Authority’s Engineer, third-party quality
inspections by Independent Quality Auditor, using digital
monitoring systems, and linking contractor payments to project
milestones. Strict penalties are imposed for delays or poor-quality
work, ensuring better execution of highway projects.
All the NH projects are constructed and maintained duly following
the prescribed standards and specifications, India Road Congress
(IRC) codes and manuals to ensure the quality of the NHs.
Regular review meetings are being conducted to monitor the
progress of works to resolve the issues causing delays. Also, the
State Government is regularly conducting Interdepartmental
coordination meetings with all stakeholders on pre-construction
activities like Land Acquisition, Forest clearances and shifting of
Utilities to ensure hindrance free and speedy implementation of the
projects to complete within time schedule.
(f) The Government in the Ministry of Road Transport &
Highways receives proposals from various State Governments/
Union Territories (UTs), from time to time, for declaration /
upgradation of State Roads, including backward region and semi-urban districts, as National Highways (NHs). Decisions are taken to
notify State Roads as NHs from time to time based on the broad
principles of declaration of NHs, requirement of connectivity,
traffic density and synergy with PM Gati Shakti National Master
Plan (NMP).Annexure-A REFERRED TO IN REPLY TO PART (a), (b), (c) & (d) OF
LOK SABHA UNSTARRED QUESTION NO. 3357 ANSWERED ON 12th
March, 2026 ASKED BY SHRI KUNDURU RAGHUVEER REGARDING
STATUS OF ONGOING NATIONAL HIGHWAY PROJECTS IN
TELANGANA
Likel
y
Phy
date Fina
Total sic
of ncia
S. projec Leng al Major Distric
Name of the comp l
N0 t cost th pro reasons t
project letio prog
. (Rs.Cr (Km) gre for delay Name
n ress
.) ss
(DD. (%)
(%)
MM.Y
YYY)
Construction of
six lane Elevated
Corridor from
km.7/950 (Uppal) Land
to km.14/200 of Acquisitio Medcha
NH-163 to De- 31.08.2 n, EPC l
1 626.76 6.25 50 48
Congest the Urban 027 contractor' Malkajgi
Limits of s Financial ri
Hyderabad- issues.
Bhoopalapatnam
Section on EPC
mode
Improvements and
widening to 6 lane
+ PS with drains
from km 14/200- Medchal
30.06.2 Forest
2 18/600 of 48.32 4.4 84 83 Malkajgi
026 Clearance
Hyderabad - ri
Bhoopalapatnam
section of NH-163
in the state ofTelangana
Nizampet - Bidar-
Telangana/Karnat
Land
aka Border)
31.12.2 Acquisitio Sangare
3 section of NH- 512.98 45.946 40 34
026 n, Forest ddy
161B
clearance
2L+PS from km 0/0
to km 45/946
Rehabilation and
upgradation of LB
nagar to Malkapur
section to 6-lane
main cariageway
with service road,
drains , come Rangare
footpath , Encroach ddy
31.07.2
4 including VUPs 545.11 22.492 79 77 ments ,Yadadri
026
and widening of issues. Bhuvana
minor bridge & giri
road safety
provision from Km
15/00 to Km 40/00
of NH-63 (old NH-
9) under NH(O) for
the year 2020-21
6 Lanning of Pune-
Hyderabad section
of NH-65 from km
493+00 to
524+000 from
Sangare
Sangareddy X Land
31.03.2 ddy,
5 Road to 1297.75 29.35 34 32 Acquisitio
027 Rangare
Madinaguda n
ddy
(Excluding BHEL
Flyover from Km
520+000 to Km
521+650) in the
State ofTelangana
Construction/
Reconstruction of
4 lane ROB in
Jadcherla town in
Railway
Km 17+000 to Km
31.10.2 clearance, Mahabu
6 18+000 45.81 1 67 66
026 Land bnagar
of Jadcherla -
acquistion
Kalwakurthy
section of NH-
167in the state of
Telangana
Widening to two
lane with paved
shoulders from
Km 0/000 to Km
79/300 of
Kalwakurthy - Land
30.06.2 Nagarku
7 Kollapur section 886.69 79.3 80 77 Acquisitio
026 rnool
of NH-167K in the n
State of
Telangana under
Annual Plan 2021-
22 on EPC mode
under NH(O)
Construction of 4
lane with paved
shoulders Bypass
to Nalgonda Town
from design Km
0.000 to 14.000 Land
06.10.2 Nalgond
8 (length 14.00Km) 516.17 14 23 16 Acquisitio
027 a
(Existing Ch Km n
18/710 to 28/685)
of Nakrekal to
Nagarjunasagar
section of NH-565
in the state ofTelangana on EPC
Mode under
Annual plan 2024-
25
Widening &
strengthening to 2
Lane/4lane with Mahabu
paved shoulders Land bnagar,
from km 0+000 to 31.12.2 Acquisitio Narayan
9 703.68 60.255 91 88
km 60+255 of 026 n & Forest pet &
Mahabubnagar - Clearance Vikaraba
Chincholi section d
of NH-167N in the
state of Telangana
Widening &
strengthening to
4lane/2 lane with
paved shoulders
Railway
of Mahabubnagar -
clearance
Chincholi section
31.12.2 and Slow Vikaraba
10 from km 60+255 to 631.49 42.579 34 30
026 progress d
Km 102/834 of NH-
by EPC
167N in the state
contractor
of Telangana
under Annual Plan
2021-22 on EPC
mode
Rehabilitation and
Forest
upgradation of NH-
Clearance
365 from Design Waranga
31.05.2 and slow
11 km.121/0 to 154/0 192.67 33 96 93 l,Mahab
026 progress
to two lane with ubabad
by EPC
paved shoulders
contractor
on EPC mode
Widening and
Land Hanuma
Strenthening of 30.04.2
12 317.19 29.6 83 80 Acquisitio konda,M
Existing 2L+PS to 026
n ulugu
4 lane +PS fromKm 150+000 to
Km 159+000 &
from Km 165+400
to Km 186+000 of
NH-163 (Old NH-
202) under NH(O) -
TSP for the year
2020-21 on EPC
mode in the state
of Telangana
Strengthening and
improvement of
Road Safety of
Hyderabad -
LWE
Bhupalapatnam
affected
section of NH-163
area (Law
from km 215/0 to
31.05.2 and order)
13 231/0, km 236/0 to 48.2 39.7 94 89 Mulugu
026 and Slow
km 247/0, km
progress
294/6 to km 307/3
by EPC
in the state of
contractor
Telangana under
Annual Plan 2021-
22 on EPC mode
under NH(O)-TSP
Improvement of
Road Safety
through
LWE
rectification of
affected
identified Black
area (Law
Spot ID TG (02)-
31.03.2 and order)
14 249 by Permanent 10.08 1.04 82 66 Mulugu
026 and Slow
improvement of
progress
junctions near
by EPC
Peddagollagudem
contractor
from km 287.200
to km 288.240 of
Warangal Mulugusection of NH-163
Widening of
existing 2 lane
road to 2 lane with
Paved shoulders
configuration from
km 279/150 to LWE
290/500 affected
(excluding from area (Law
km 287/200 to 31.08.2 and order)
15 136.22 10.31 30 17 Mulugu
288/240) section 026 and Slow
of NH-163 of progress
Hyderabad - by EPC
Bhupalapatnam contractor
road in the state
of Telangana on
EPC mode under
Annual Plan 2022-
23
One time
improvement to
Mahabubabad to
Nellikuduru
stretch from Km
0/0 to 7/0
(Bypassed
stretch) & Km
Slow
26/100 to 30/200
21.04.2 progress Mahabu
16 (Bypassed 29.61 21.5 36 28
026 by babad
stretch), Thorrur
Contractor
to Nellikuduru
stretch from Km
0/0 to 3/0
(Bypassed
stretch), Thorrur
to Valigonda
stretch from Km
0/0 to 5/600(Bypassed
stretch) &
Mahabubabad to
Yellandu stretch
from Km 0/6 to 2/4
(Bypassed
stretch)of
Gowrelly to
Kothagudem road
of NH 930P in the
state of Telangana
Rehabilitation and
upgradation of NH-
221 (new No.30)
from km.121/0 to
165/0 (Rudrampur-
Under Contractor Bhadadri
Bhadrachalam
17 334.82 43.185 Termin 80 80 financial Kothagu
Section) in the
ation issues dem
State of
Telangana to two
lanes with paved
shoulders under
NHDP-IV on EPC
Construction of
HLB across
river Godavari at
Contractor Bhadadri
km 166/0 of NH 31.07.2
18 98.45 2.4 94 94 financial Kothagu
221 under Annual 026
issues dem
Plan on EPC mode
in the State of
Telangana.
Improvement from
Km 182/570 to Km
187+723 and link Land
30.06.2 Nalgond
19 road including 124 5.47 84 82 Acquisitio
026 a
widening of road n
from Km 185/230
to Km 185/920 ofNH-167 in the
Municipality limits
of Miryalaguda
town
Permanent
rectification of
black spots at TG-
(02)-115 (km 39/6
to 40/10), TG-(02)-
448(38/650-
39/1s0), TG (02)-
387(41/4-41/9), TG-
(02)-388 (km 43/8-
44/3) including
31.05.2 Shifting of Khamma
20 improving road 57.52 7.05 82 62
026 utilities m
safety and the
riding quality of
the road surface
and Junction at
Km.38/875,
40/775, 41/75O ,
43/410 on
Khammam-Kurvi
section ol NH-
365A
Widening to 2 lane
with paved
shoulders from km
34/250 to km
Land
71/675 of 31.12.2 Khamma
21 445.76 37.425 4 3 Acquisitio
Khammam-Kuravi 027 m
n
Section of NH-
365A on EPC
mode in the State
of Telangana
Rehabilitation and Land Yadadri
30.04.2
22 Upgradation of 549.28 69.12 93 89 Acquisitio Bhongir,
026
Valigonda Thorrur n Mahabusection to two babad
lane with paved
shoulders from
Km 39.180 to Km
108.30 of NH-930P
Widening and
improvement of
existing
carriageway to
two lane with Land
31.08.2 Jangaon
23 paved shoulder 423.48 45.57 75 73 Acquisitio
026 ,Siddipet
from km 86/160 to n
Km 131/730 of
Duddeda to
Jangaon section
of NH-365B
Widening to 2 lane
with paved
shoulders of
'Bodhan - Basar -
Bhainsa' section
Land Nirmal &
from Km 38/900 to 30.03.2
24 644.45 56.4 99 96 Acquisitio Nizamab
Km 95/300 of NH- 026
n ad
161BB in the state
of Telangana
under Annual Plan
2021-22 on EPC
mode under NH(O)
Widening to 2 lane
with paved
shoulders from
Km 0+00 to km
Land
32+970 of 03.05.2
25 490.92 32.62 59 55 Acquisitio Adilabad
Adilabad - bela 026
n
section of NH
353B in the State
of Telangana on
EPC Mode underAnnual Plan 2022-
23 on EPC mode.
Widening to 4 lane
for the permanent
rectification of 7
black spots falling
31.07.2 Forest Mancher
26 in Km 170.250 to 59.79 9.8 51 40
026 Clearance ial
180.60 on
Nizamabad -
Jagadalpur
section of NH-63
Widening to 2 lane
with paved
shoulders of
Forest
Siddipet - Siddipet,
30.06.2 Clearance
27 Elkathurthy 578.85 63.641 86 85 Hanuma
026 and land
section from km konda
acquistion
69/978 to Km
133/619 of NH-765
DG
Widening to 2 lane
with paved
shoulders of
Forest
Medak - Siddipet
30.06.2 Clearance Medak &
28 section from km 882.18 69.978 74 73
026 and Land Siddipet
0/000 to Km
acquistion
69/978 of NH-765
DG in the state of
Telangana
Widening to 2 lane
with paved
shoulders from
Km 62/920 to Km Medak &
20.08.2 Forest
29 106/830 of Medak - 399.01 43.9 63 60 Kamare
026 Clearance
Yellareddy ddy
Section of NH-
765D in the state
of Telangana onEPC mode under
NH(O) under
Annual plan 2022-
23
Widening to Two
lane with paved
shoulders from
106/830 to
158/496 of
Kamare
Yellareddy -
05.07.2 Forest ddy &
30 Rudrur Section of 499.88 51.7 54 53
026 Clearance Nizamab
NH-765D in the
ad
state of Telangana
on EPC mode
under NH(O) under
Annual plan 2022-
23
One time
improvement of
left over stretches
(at Bypasses and
realignment
stretches) on NH
365 Nakrekal –
Tanamcherla
Nalgond
section from km 23.07.2
31 18.72 28.67 20 - No issues a &
0/0 to 72/0 and 026
Suryapet
NH-167
Miryalaguda –
Kodad Section Km
187.723 to
234.434 in
Telangana State
under Annual Plan
2024-25
One time
14.04.2 Nizamab
32 improvement from 4.97 4.8 80 - No issues
026 ad
Km 0/7 to 2/7, Km4/3 to 5/6, Km 6/0
to 7/5 of
Maharashtra State
Border to Bodhan
section of NH -63
extended in the
state of Telangana
Construction of
Foot Over Bridge
at Km 24/570 of
Nakrekal
Nagarjunasagar 08.07.2 Nalgond
33 4.9 0 10 - No issues
section of NH-565 026 a
in Telangana
State under
Annual Plan 2024-
25 on EPC mode
Improvement of
riding quality from
Km 668+315 to
Km 671+555 of
Nirmal- Khanapur 07.07.2
34 14.54 3.24 3 - No issues Nirmal
section of NH 61 026
in the State of
Telangana under
Annual Plan 2024-
25
Six laning of Intenti
existing 4-lane on to
from Km 22.300 termin
(Thondupally) to ate due
Contractor
Km 34.144 to poor Ranga
35 527.43 12 17 14 financial
(Kothur) on perfor Reddy
issues
Hyderabad to mance
Bangalore section of
of NH-44 on EPC Contra
mode ctor
36 Four laning of NH - 1138.99 46.41 26.11.2 10 5 Environme Rangare163 from 026 ntal ddy &
Hyderabad (ORR clearances Vikaraba
near Appa issues and d
Junction at Km. Concessio
14+000) to naire
Manneguda (Km. financial
59+500) in the issues
State of
Telangana
22.04.2
026
Six laning of (Intenti
Km.471 on to
Medchal
(Gundlapochampal termin Contractor
-
37 ly) to Km.481 528.21 10.03 ate due 50 46 financial
Malkajgi
(Bowenpally) of to poor issues
ri
Nagpur-Hyderabad perfor
Section of NH-44. mance
of
Contra
ctor)
Six laning with
Elevated corridor
Delay due
from Km.454.000
to change Medak
(Kalakallu) to
in design & Medch
Km.471.000 30.07.2
38 903.17 17 36 35 and al -
(Gundlapochanpall 026
Contractor Malkajgi
i) of Nagpur -
financial ri
Hyderabad
issues
Section of NH-44
on EPC mode.
Construction of 6
lane Access Concessio
Jogulam
Controlled 30.06.2 naire
39 1044.06 39.3 84 84 ba
Highway of 026 financial
Gadwal
Nandinne village issues
to Julekal villagefromKm.202.900
to Km.242.200
under BM
(Akalkot-Kurnool
Section)
(Package-I)
Construction of 6
lane Access
Controlled
Delay in
Highway of
approval of Jogulam
Julekal village to
Design and ba
Dinnedevarapadu 30.09.2
40 1315.87 38.2 63 63 Concessio Gadwal
village from 026
naire &
Km.242.200 to
financial Kurnool
Km.280.400 under
issues
BM (Akalkot-
Kurnool Section)
(Package-II)
Four laning of
Karimnagar to
Warangal section
of NH-563from
Design Ch.48.860
(near SH-1
ch.170.400) at
Manakondur
bypass to Design Karimna
Land
Ch.116.875 30.07.2 gar &
41 2486.51 68.02 89 92 Acquisitio
(existing 026 Waranga
n
Ch.144.050 on NH- l
163) at Palvelpula
near Hanamkonda
as part of Jagital –
Karimnagar –
Warangal Section
of NH-563in the
State of
Telangana (HAMMode)
4 lane AC New
Greenfield
Highway Sec on
NH-163G
(Mancherial
Concessio
Warangal) from
22.12.2 naire Mancher
42 Narva to 1104.2 31.47 5 -
026 financial ial
Puttapaka as part
issues
of Nagpur
Vijayawada
Corridor on HAM
in Telangana
(Package I)
4lane Greenfield
Highway Section
of NH-163G
Land
(Mancherial Peddapa
acquisition
Warangal) from lli &
, forest
Puttapaka to 12.06.2 Jayasha
43 1145.24 37.05 5 - and
Pangidipalle as 027 nkar
Concessio
part of Nagpur Bhupala
naire
Vijayawada pally
issues
Corridor on HAM
in Telangana
(Package II)
4 lane AC New GF
Highway Sec on
NH-163G
Land
(Mancherial Jayasha
acquisition
Warangal) from nkar
, forest
Pangidipalle to 12.06.2 Bhupala
44 1170.64 39.89 - - and
Oorugonda as part 027 pally &
Concessio
of Nagpur Hanuma
naire
Vijayawada konda
issues
Corridor on HAM
in Telangana
(Package III)4-Lane AC GH
section on NH-
163G (Warangal-
Khammam) from Land
Oorugonda village acquisition Waranga
to Venkatpur 12.06.2 and l &
45 1140.82 38 - -
village as part of 027 Concessio Hanuma
Nagpur naire konda
Vijayawada issues
Corridor on HAM
in Telangana
(Package-I)
Construction of 4
Lane Access
Controlled
Greenfield
Highway section
on NH-163G
(Warangal-
Khammam) Waranga
Land
Venkatpur village 31.12.2 l &
46 1083.11 39.41 59 59 Acquisitio
in Warangal 026 Hanuma
n
District at Design konda
Ch. 150.240 Km to
Thallasenkesa
village in
Mahabubabed
District at Design
Ch. 189.650
km(Package-II)
Construction of 4
Lane Access
Controlled
Land
Greenfield 18.03.2 Khamma
47 1021.96 29.92 32 32 Acquisitio
Highway section 027 m
n
on NH-163G
(Khammam-
Vijayawada) fromV.
Venkatayapalem
village at Design
Ch.220.480 Km to
Brahmanapalli(K)
village at Design
Ch.250.400
Km (Package-I)
4-Lane AC GH
section on NH-
163G (Khammam-
Vijayawada) from
Land
Brahmanapalli(K)
acquisition
village to
25.03.2 and Khamma
48 Remidicherla 862.58 29.8 11 11
027 Concessio m
village as part of
naire
Nagpur
issues
Vijayawada
Corridor on HAM
in Telangana and
AP (Package-II)
Construction of 4-
Lane Access
Controlled
Greenfield
Highway section
on NH-163G
Land
(Khammam-
acquisition Khamma
Vijayawada) from
06.05.2 and m and
49 Remidicherla 1225.14 29.71 2 2
027 Concessio NTR
village to
naire District
Jakkampudi
issues
village as part of
Nagpur
Vijayawada
Corridor on HAM
in Telangana
(Package-III)4-Lane AC GH
section on NH-
163G (Warangal-
Khammam) from
Thallasenkesa
Land Mahabu
village to
03.07.2 acquisition babad &
50 V.Vekatayapalem 1098.05 30.83 2 2
027 and Forest Khamma
village as part of
issues m
Nagpur
Vijayawada
Corridor on HAM
in Telangana
(Package-III)
Construction of 4
lane Access
Controlled New
Greenfield
Highway Section
of NH-365BG
Khammam-
Devarapalle from
Thallampadu
village to Land
03.05.2 Khamma
51 Somavaram 1337.18 33.604 92 92 Acquisitio
026 m
village (Design Km n
0+000 to Km
33+604) of length
33.604 km in the
states of
Telangana under
Bharatmala
Pariyojana on
Hybrid Annuity
Mode (Package-I)
Upgradation to Rangare
Two Lane with ddy,
52 690.33 41.92
Paved Shoulders Yadadri
Recently awarded
from Km 0.000 to BhuvanaKm 41.92O (Green giri
Field Alignment)
of Gowrelty to
Valigonda Section
of NH-930P in the
State of
Telangana on EPC
Mode under
Annual Plan 2022-
23
Rehabilitation and
Up gradation of
Thorrur to Nehru
Nagar Section to
Two Lane with
Paved Shoulders
from Km 109.420 Mahabu
53 675.45 69.08
to Km 178.500 of babad
Recently awarded
NH-930P in the
State of
Telangana on EPC
mode under
Annual Plan 2022-
2023
Construction of
Iconic Hybrid
Cable Stayed and
Suspension Bridge
Across Krishna
River on NH -167K
(Design Chainage Nagarku
54 1082.56 1.08
km 87+360 to km rnool
Tendering stage.
88+437) in the
State of
Telangana and
Andhra Pradesh
on EPC Mode
Under NH(O)Rehabilitation and
Upgradation to 2/4
lane with paved
shoulders from
Km 79/300 to Km
87/360 & Km
88/437 to Km
93/819 of NH-167K
(Bridge
Approaches of Nagarku
55 436.91 13.44
Iconic Bridge rnool
Tendering stage.
across river
Krishna) in the
State of
Telangana and
Andhra Pradesh
on EPC mode
under NH(O) under
Annual plan 2022-
23
Rehabilitation and
Up gradation of
Nehru Nagar to
Kothagudem
junction Section
to Two Lane/ four Bhadadri
56 lane with Paved 826.71 52.08 Kothagu
Shoulders from Tendering stage. dem
Km 178+500 to
230.58 of NH-930P
in the State of
Telangana on EPC
basis
Widening to 4
Jayashn
Lane + PS from
akar
57 Km 67/200 (Design 662.67 41.339
Bhupalp
Km 67/200) to Km Tendering stage.
ally
108/556 (DesignKm 108/542) of
Sironcha-Atmakur
Section of NH
353C in the State
of Telangana on
EPC Mode under
Annual Plan
4-Laning of
Gudebellur
(Design Km.
182+930) to
Junction with NH
167N (Bhootpur –
Chincholi Road)
Narayan
near Palamuru
pet&
58 University (Design 3175.08 80.01 Tendering stage.
Mahabu
Ch. 262+940) in
bnagar
Hyderabad - Panaji
section of NH-167
(Length 80.01km)
under NH(O) in the
State of
Telangana on HAM
Mode
*****