Executive Summary & Key Takeaways

**Executive Summary** This document is an answer provided by the Minister of Road Transport and Highways to the Lok Sabha Unstarred Question No. 1126, answered on February 5th, 2026, regarding the upgradation of National Highways (NHs) connecting Shahjahanpur. It outlines the ongoing and planned projects for development and maintenance of these NHs. Several projects have target completion dates in 2026, with others scheduled later. **Key Points / Main Content** * **General Policy:** * Development and maintenance of NHs is a continuous process. * Works are based on traffic density, road condition, and synergy with the PM Gati Shakti National Master Plan. * National Highways (NHs) works are carried out as per standards, guidelines, manual, code of practice of Indian Roads Congress as well as specifications for Road and Bridge Works. * **Road Safety Measures:** * Necessary road safety measures are invariably part of the NHs works, such as provision of service roads, median openings, merging and diverging facilities, crash barriers, signage boards, foot over bridges. * Road Safety Audit is carried out for the independent assessment of newly constructed roads before opening them to commercial traffic. * All identified road safety issues, including those related to road signage and markings, are addressed before the road is opened to the public. * Road Safety Audit (RSA) on NHs has been made mandatory through third party auditors/experts at all stages i.e. design, construction, operation and maintenance etc. * Provisions of pedestrian underpasses, vehicular underpasses and light vehicular underpasses are invariably made at the time of preparation of detailed project report as per traffic density, pedestrians' movement and site requirement. * **Completed and Ongoing Projects:** * Details of completed NHs projects for development and maintenance of NHs passing through Shahjahanpur district during the last three years and current year are at Annexure I. * Project-wise details of sanctioned/ongoing NHs projects for development and maintenance of NHs passing through Shahjahanpur district are at Annexure II. * Annexure I lists four completed projects, including the Bareilly-Sitapur section of NH-24 (target completion 30.08.2024), Allahganj-Miranpur Katra section (Km 52.770 to Km.114.000) of NH-730C (target completion 27.02.2024), Balance work of construction of a minor bridge over Kaimua Nala in Km.24.00 of NH-731K on item rate basis (target completion 22.02.2025), PR in km 1 (1420m) to km 12, km 19 to 21, km 40 and km 43 of NH-731K on EPC mode (target completion 09.04.2023) * Annexure II lists six ongoing projects, including Improvements and Up-Gradations of Existing Roads. * **Funding:** * Funds are allocated for development and maintenance of NHs State/ Union Territory-wise/agency wise and not district / region-wise. * Allocation and expenditure details for Uttar Pradesh for the last three years and the current year (up to 31.12.2025) are provided. **Impact Analysis** **Stakeholder: Residents and Commuters of Shahjahanpur and Uttar Pradesh** * **Impact:** Improved road infrastructure, enhanced safety, and smoother traffic flow on National Highways connecting Shahjahanpur. * **Action Required:** Be aware of ongoing construction and roadwork activities, and adhere to traffic regulations for their safety. **Stakeholder: Ministry of Road Transport and Highways** * **Impact:** Accountable for overseeing the development and maintenance of NHs, ensuring adherence to safety standards, and efficient utilization of allocated funds. * **Action Required:** Continue monitoring project progress, conducting Road Safety Audits, and taking necessary corrective measures. **Stakeholder: Contractors and Construction Companies** * **Impact:** Responsible for executing the development and maintenance projects according to the specified standards and timelines. * **Action Required:** Ensure timely completion of projects, adherence to quality standards, and compliance with safety regulations.

Key Entities Referenced

National Highways (NHs): Roads under the purview of the central government; the document discusses upgradation and maintenance of specified sections. Shahjahanpur: A city in Uttar Pradesh, India, that is the location of specific National Highway upgradation projects discussed in the document. Ministry of Road Transport and Highways: The Indian government ministry responsible for the development and maintenance of National Highways, and which is answering a parliamentary question. PM Gati Shakti National Master Plan: A government initiative that coordinates infrastructure projects, referred to in the context of integrating National Highways development. Road Safety Audit (RSA): A safety procedure conducted on national highways.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO. 1126 ANSWERED ON 5TH FEBRUARY, 2026 UPGRADATION OF NHS CONNECTING SHAHJAHANPUR †1126. Shri Arun Kumar Sagar: Will the Minister of ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन औि िाजमार्ग मंत्री be pleased to state: (a) whether the National Highways (NHs) connecting Shahjahanpur have been upgraded and if so, the details thereof; (b) the steps taken to enhance road safety; (c) whether construction of bypass and widening of road projects are in progress and if so, the details thereof; (d) the expenditure incurred on these projects; and (e) the details of the upcoming sanctioned schemes? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a) to (e) Development and maintenance of National Highways (NHs) is a continuous process. Works on NHs, including the NHs connecting Shahjahanpur, are accordingly taken up based on the traffic density, condition of road and synergy with PM Gati Shakti National Master Plan to keep the NHs in traffic worthy conditions.National Highways (NHs) works are carried out as per standards, guidelines, manual, code of practice of Indian Roads Congress as well as specifications for Road and Bridge Works. Necessary road safety measures such as provision of service roads, median openings, merging and diverging facilities, crash barriers, signage boards, foot over bridges, etc. are invariably part of the NHs works. Further, Road Safety Audit is carried out for the independent assessment of newly constructed roads before opening them to commercial traffic. All identified road safety issues, including those related to road signage and markings, are addressed before the road is opened to the public. Subsequently, during the operation of the project highway, assessment is carried out at regular intervals to identify safety issues that may have emerged during operation stage and any necessary remedial measures are taken in a time- bound manner. Road Safety Audit (RSA) on NHs has been made mandatory through third party auditors/experts at all stages i.e. design, construction, operation and maintenance etc. As per outcome of the report, corrective measures are undertaken. The provisions of pedestrian underpasses, vehicular underpasses and light vehicular underpasses are invariably made at the time of preparation of detailed project report as per traffic density, pedestrians' movement and site requirement. The details of completed NHs projects for development and maintenance of NHs passing through Shahjahanpur district during last three years and current year are at Annexure I. Project-wise details of sanctioned/ongoing NHs projects for development and maintenance of NHs passing through Shahjahanpur district are at Annexure II. Funds are allocated for development and maintenance of NHs State/ Union Territory-wise/agency wise and not district / region- wise.The details of funds allocated and expenditure incurred towards development and maintenance of NHs in the State of Uttar Pradesh during each of the last three years and the current year are as follows: Amount in Rs Crore Year Allocation Expenditure 2022-23 21,453.40 21,453.40 2023-24 28,113.83 28,113.83 2024-25 20,682.48 20,664.95 2025-26 (Till 31.12.2025) 19,676.39 17,513.89ANNEXURE I ANNEXURE REFERRED TO IN REPLY TO PARTS (a) TO (e) OF LOK SABHA UNSTARRED QUESTION NO. 1126 FOR ANSWER ON 05.02.2026 ASKED BY SHRI ARUN KUMAR SAGAR REGARDING "UPGRADATION OF NHS CONNECTING SHAHJAHANPUR". Details of completed NHs projects for development and maintenance of NHs passing through Shahjahanpur district during last three years and current year Total S. NH Project Length Date of Expenditure Project Name No. No. Cost (Rs (km) completion (Rs Crores) Crores) NH- Balance work of Bareilly 1 994.68 58.75 30.08.2024 984.63 30 Sitapur section of NH-24 Rehabilitation and Up- gradation to 2L+PS of 2 730C Allahganj–Miranpur Katra 316.05 61.23 27.02.2024 299.06 section (Km 52.770 to Km.114.000) of NH-730C Balance work of construction of a minor bridge over Kaimua 3 731K 0.72 1 Job 22.02.2025 0.71 Nala in Km.24.00 of NH-731K on item rate basis PR in km 1 (1420m) to km 12, km 19 to 21, km 40 and km 43 4 731K 7.77 17.42 09.04.2023 5.53 of NH-731K on EPC modeANNEXURE II ANNEXURE REFERRED TO IN REPLY TO PARTS (a) TO (e) OF LOK SABHA UNSTARRED QUESTION NO. 1126 FOR ANSWER ON 05.02.2026 ASKED BY SHRI ARUN KUMAR SAGAR REGARDING "UPGRADATION OF NHS CONNECTING SHAHJAHANPUR". Project wise details of sanctioned/ ongoing NHs projects for development and maintenance of NHs passing through Shahjahanpur district Total Original Project Date of Physical Revised/Target S. NH Length Appointed contractual Project Name Cost Sanction/ progress date of No. No. (km) date date of (Rs Award in % completion completion Crores) Improvement and Up-Gradation of Existing Road to 2/4L PS from Km 40.000 to 88.750, 1 731 338.57 48.75 20.06.2022 03.02.2023 02.02.2025 99.20 15.02.2026 start of Khutar bypass to start of Shahjahanpur bypass of NH 731(Pkg-I) Improvement and Up-Gradation of Existing Road to 4L PS from Km 88.750 to 123.650, from 2 731 564.76 34.9 30.11.2022 19.01.2024 18.01.2026 53.04% 20.06.2026 Start of Shahjahanpur Bypass to start of Shahabad bypass of NH 731(Pkg.-2A) Rehabilitation and Upgradation to 2L+PS of Miranpur-Katra to 18.04.2020/ 3 730C Radhaita of NH-730C 172.50 23.25 28.07.2022 27.07.2024 88 31.03.2026 14.03.2022 (Km. 114.000 to Km. 137.250) (Package- III)Total Original Project Date of Physical Revised/Target S. NH Length Appointed contractual Project Name Cost Sanction/ progress date of No. No. (km) date date of (Rs Award in % completion completion Crores) Widening/Upgradation to four lane configuration of 27.03.2023/ 4 731K Shahjahanpur - 1590.20 47.03 Agreement signed on 14.01.2026 02.12.2025 Bisalpur section from Km. 0.000 to Km. 47.026 of NH-731K Maintenance of km 0.000 to km 82.000 (except ch. 2.180 to 18.01.2024/ 5 730 3.260 & Ch.30.840 to 97.44 80.14 19.06.2024 18.06.2029 75 18.06.2029 15.03.2024 31.620) of NH-730 under PBMC for the financial year 2023-24 Maintenance of Km. 0.000 to Km 105.500 08.01.2024/ 6 730A (excluding Ch.15.500 128.67 104.00 19.06.2024 18.06.2029 75 18.06.2029 15.03.2024 to Ch. 17.000) of NH- 730A under PBMC *****