Parliament Question: Widening of Barabanki-Bahraich-Rupaidiha NH-927

Issued by ROAD TRANSPORT AND HIGHWAYS · Not Applicable

Research with AI Agent Chat with Document Generate Summary Translate Helpful Share Add to Project Create Task

Executive Summary & Key Takeaways

**Executive Summary** The document is a response to Starred Question No. 191 in the Lok Sabha, answered on February 12, 2026, regarding the widening of the Barabanki-Bahraich-Rupaidiha section of National Highway No. 927 (NH-927). The response confirms the preparation of a Detailed Project Report (DPR) for four-laning the Barabanki-Bahraich section and outlines the planned installation of an Advanced Traffic Management System (ATMS). The project's scheduled completion is 24 months after the award of work and the declaration of the Appointed Date, post sanction of project. **Key Points / Main Content** * **Four-Laning of Barabanki-Bahraich Section:** * The DPR for four-laning of the Barabanki-Bahraich section has been finalized in two packages. * Package 1: Barabanki to Mushfabad (Km.0.000 to Km.43.030), length 43.030 Km. * Package 2: Mushfabad to Biswariya (Km.43.030 to Km.101.515), length 58.485 Km. * **Bahraich-Rupaidiha Four-Laning:** * The feasibility study for four-laning from Bahraich to Rupaidiha has been awarded. * **Digital Highway Features:** * An Advanced Traffic Management System (ATMS) will be installed. * ATMS features include Variable Messaging Sign Boards (VMSB), an accident detection system with cameras, a weather monitoring system, and an optical fibre network. * **Project Completion Timeline:** * The scheduled completion of the project is 24 months after the award of work and declaration of the Appointed Date, post sanction of project. **Impact Analysis** **Stakeholder: Commuters/Road Users** * **Impact:** Improved road infrastructure, reduced travel time, enhanced safety through ATMS features, and better traffic management. * **Action Required:** Be aware of construction timelines and potential disruptions during the widening process. **Stakeholder: Residents of Barabanki, Bahraich, Rupaidiha and adjacent regions** * **Impact:** Improved connectivity and economic opportunities; potential disruptions during construction. * **Action Required:** Stay informed about the project's progress and adhere to traffic regulations during construction. **Stakeholder: Project Contractors** * **Impact:** Responsible for executing the project within the stipulated timeline and standards. * **Action Required:** Adhere to the terms of the contract, manage resources effectively, and ensure timely completion of the project.

Key Entities Referenced

Ministry of Road Transport and Highways: The ministry responsible for answering the parliamentary question regarding the widening of NH-927. NH-927: National Highway 927, the subject of the widening project from Barabanki-Bahraich-Rupaidiha. Detailed Project Report (DPR): The report prepared for the widening of the Barabanki–Bahraich section of NH-927. Uttar Pradesh: The state where the National Highway is proposed to be developed as the first Digital Highway. Advanced Traffic Management System (ATMS): System to be installed on the project highway, featuring Variable Messaging Sign Board (VMSB), Accident detection system, weather monitoring system, and optical fibre network.
Official Source Record View Original Source →
See Full Document Text
GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA STARRED QUESTION NO. 191 ANSWERED ON 12TH FEBRUARY, 2026 WIDENING OF BARABANKI-BAHRAICH-RUPAIDIHA NH-927 †*191. DR. ANAND KUMAR: Will the Minister of ROAD TRANSPORT AND HIGHWAYS सड़क परिवहन औि िाजमार्ग मंत्री be pleased to state: (a) whether a Detailed Project Report (DPR) has been prepared for widening the two-lane Barabanki–Bahraich–Rupaidiha section of National Highway No. 927 into a four-lane highway; (b) if so, the details thereof including the total length of the proposed four-lane National Highway; (c) whether the said National Highway is proposed to be developed as the first Digital Highway of Uttar Pradesh; (d) if so, the details thereof and the salient features of the proposed Digital Highway; and (e) the time by which the widening of the said National Highway and construction of a bridge over the Ghagra river is likely to commence along with timeline set for completion of the said works? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a) to (e) A statement is laid on the Table of the House.STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (e) OF LOK SABHA STARRED QUESTION NO. 191 ANSWERED ON 12TH FEBRUARY, 2026 ASKED BY DR. ANAND KUMAR REGARDING WIDENING OF BARABANKI-BAHRAICH- RUPAIDIHA NH-927. (a) & (b) Yes Sir. The Detailed Project Report (DPR) for four-laning of the Barabanki–Bahraich section has been finalized in two packages. The details of the two packages are as follows: S.No Project name Length (Km.) 1 Barabanki to Mushfabad 43.030 Km. from Km.0.000 to Km.43.030 2 Mustfabad to Biswariya 58.485 Km. from Km.43.030 to Km.101.515 Further, the feasibility study for 4-laning from Bahraich to Rupaidiha has been awarded. (c) & (d) Advanced Traffic Management System (ATMS) shall be installed. The ATMS is having features of Variable Messaging Sign Board (VMSB), Accident detection system with cameras, weather monitoring system, optical fibre network etc., which shall be installed on the Project Highway as part of the project. (e) Scheduled completion of project will be 24 months after the award of work and declaration of Appointed Date, post sanction of project *****