See Full Document Text
भारतीय दरू संचार विवियामक प्राविकरण
Telecom Regulatory Authority of India
Consultation Paper
on
Review of Rating of Properties
for
Digital Connectivity Regulations, 2024 (7 of 2024)
New Delhi, India
27th February 2026
NBCC World Trade Centre, Tower-F, (4th to 7th Floors), Nauroji Nagar, New Delhi- 110029
1Stakeholders are requested to submit their comments, feedback, and
suggestions on the proposed amendments and on any other aspects of
Rating of Properties for Digital Connectivity Regulations, 2024, preferably
in electronic form, on TRAI website in specific Template mentioned in
Annexure-I, or to adv-qos1@trai.gov.in with a copy to ja.qos1@trai.gov.in
by 23rd March 2026.
For any clarifications/ information, Shri Tejpal Singh, Advisor (QoS-I),
TRAI, may be contacted at +91-11-20907759 or email: adv-
qos1@trai.gov.in
2Contents
S. No. Title Page No.
Chapter 1 Introduction 4
Chapter 2 Stakeholder Feedback on Regulations 9
Chapter 3 Analysis and Proposed Amendments to the Regulations 17
Chapter 4 Proposed Amendments in Regulation 34
Chapter 5 Proposed Amendments in Rating Manual 38
Annexure-I Template for submitting Comments or Feedback 54
Annexure-II Draft Regulation with Amendments 55
Annexure-III Draft Rating Manual with Amendments 69
Declaration by Property Manager for Under-
Annexure-IV 228
Construction Property
Indicative Template for Optional Digital Connectivity
Annexure-V 238
Audit Report
Department of Telecommunications (DoT) Office
Appendix-A Memorandum No. 20-1341/2023-AS-I dated 09th July 241
2025
3Chapter 1: Introduction
1. Background
1.1. Digital connectivity has become a critical enabler of modern living and economic
activity. Over the last decade, rapid digitalisation has transformed governance,
education, healthcare, commerce, innovation, and social interaction. As dependence
on digital platforms continues to increase, the availability of seamless and reliable
digital connectivity has emerged as a foundational requirement for inclusive growth
and sustainable development.
1.2. Studies and industry reports indicate that a significant proportion of data consumption
occurs inside buildings. This trend is particularly pronounced with the deployment
of advanced mobile technologies such as 4G and 5G, which operate on higher
frequency bands to deliver high data rates but are more susceptible to signal
attenuation due to walls, building materials, and construction design. As a result, in-
building digital connectivity has become a critical determinant of User Experience
and Quality of Service (QoS).
1.3. Telecom Regulatory Authority of India Act, 1997 (24 of 1997), vide Sub-clause (v) of
clause (b) of sub-section (1) of section 11, mandates the Authority to “lay down the
standards of Quality of Service to be provided by the service providers and ensure the
quality of service and conduct the periodical survey of such service provided by the
service providers so as to protect the interest of the consumers of telecommunication
services”.
1.4. To address these challenges in a structured manner, the Telecom Regulatory Authority
of India (TRAI) submitted its recommendations on “Rating of Buildings or Areas
for Digital Connectivity” to the Government on 20th February 2023. The
4recommendations were accepted by the Government, with certain modifications,
and subsequently referred to relevant Ministries and institutions for implementation.
Department of Telecommunications (DoT), through its Office Memorandum dated
09th July 2025, has referred these action points to multiple stakeholders, including the
Ministry of Housing and Urban Affairs (MoHUA), Bureau of Indian Standards (BIS),
Telecommunication Engineering Centre (TEC), National Communications Academy-
Technology (NCA-T), Ministry of Rural Development (MoRD) and other concerned
bodies, for creation of enabling in-building telecommunication infrastructure and
operationalising the Digital Connectivity Rating framework through appropriate
amendments to Model Building By-laws (MBBL), National Building Code (NBC),
standards, and institutional mechanisms for capacity building. The Department of
Telecommunications (DoT) Office Memorandum No. 20-1341/2023-AS-I dated 09th
July 2025 is attached at Appendix-A.
1.5. To implement the rating framework as per these recommendations, TRAI notified the
“Rating of Properties for Digital Connectivity Regulations, 2024” (07 of 2024) on
25th October 2024, for rating properties based on their digital connectivity readiness.
The framework aims to promote collaboration among Property Managers, Digital
Connectivity Infrastructure Providers (DCIPs), Digital Connectivity Rating Agencies
(DCRAs), Service providers, and other stakeholders, while ensuring transparency,
accountability, and self-sustainability.
1.6. To operationalise the Regulations, TRAI issued a Notice Inviting Comments on the
Draft Manual for Assessment of Digital Connectivity on 13th May 2025. After
examining stakeholder inputs and incorporating suitable suggestions, the Rating
Manual was released on 13th August 2025. The rating manual provides the
operational backbone of the Digital Connectivity Rating framework, laying down the
roles and responsibilities of stakeholders, rating methodology and assessment stages,
5criteria and sub-criteria for rating including their scoring approach, and detailed
procedures for application, evaluation, certification, renewal, and appeals. By
translating regulatory intent into a clear and standardised assessment process, the
Manual enables consistent implementation of the framework across diverse property
types, while ensuring transparency and credibility of the ratings awarded.
1.7. Subsequently, the Authority invited applications for registration of Digital
Connectivity Rating Agencies (DCRAs) on 07th April 2025. A capacity-building
workshop for registered DCRAs was held on 16th September 2025. Till date
registration has been granted to twenty DCRAs as per the eligibility criteria specified
in regulation 5. The registration process is on-going and interested firms, meeting
required eligibility criteria as per regulation 5, may apply for registration as DCRA.
1.8. Further, the Authority invited applications for registration of Property Manager on
29th September 2025. Property Managers have started showing interest and few have
already registered in accordance with regulation 13.
1.9. TRAI has also conducted multiple awareness sessions and workshops for various
stakeholders. For those Property Managers who have begun registering, the rating of
their properties is expected to commence shortly.
1.10. Further details about the rating process are available on the dedicated portal at
https://trai.gov.in/dcra-portal/. The portal provides a consolidated view of the
framework, including its objectives and rating process, the notified Regulations,
Orders issued under the framework, the Rating Manual, details of registered DCRAs,
and other reference material such as press releases, notices, FAQs, media content, and
contact information.
62. Scope of Consultation
2.1. During the process of interaction and engagement with stakeholders, as discussed in
Chapter 2, and based on early implementation experience of the Digital Connectivity
Rating framework, the Authority has examined stakeholder inputs in light of
ecosystem requirements. These inputs have highlighted certain areas where additional
clarity, refinement, or alignment with on-ground practices may be beneficial for
effective implementation of the Regulations.
2.2. Accordingly, the scope of this consultation paper is to seek views of stakeholders on
the proposed amendments in Regulation placed at Chapter 4 and proposed
amendments in Rating Manual in Chapter 5. Draft Regulation and Rating Manual
with Amendments is present at Annexure-II and III respectively. In addition,
stakeholders are also invited to submit their comments, feedback, and suggestions
on any other aspects of the Rating of Properties for Digital Connectivity Regulations,
2024 and Rating Manual in the prescribed format.
3. Structure of the Document
This consultation paper is organised into five chapters. Chapter 1 provides the
introduction and background to the Digital Connectivity Rating framework, including
the regulatory context, key milestones, and the current status of implementation.
Chapter 2 presents the current scenario and summarises stakeholder experience and
observations emerging from early implementation of the framework. This chapter
highlights key areas identified by stakeholders that require further examination, based
on ecosystem interactions and practical deployment realities. Chapter 3 sets out the
proposed amendments to the Regulations, based on the stakeholder observations
discussed in Chapter 2. It explains the context and proposed approach to address the
7concerns of the stakeholders through proposed amendments. Chapter 4 and Chapter 5
contain proposed amendments in Regulation and Rating Manual respectively. The draft
regulation and rating manual with amendments is present in Annexure-II and III and
the amendments are highlighted in yellow colour.
Annexure-I provides the template for submission of stakeholder comments. Annexure-
IV provides supporting formats and reference material, including the draft of
declaration to be submitted by Property Managers while applying for rating of under-
construction properties. Annexure-V provides the Indicative Template for Optional
Digital Connectivity Audit Report. The Appendix-A contains Department of
Telecommunications (DoT) Office Memorandum No. 20-1341/2023-AS-I dated 09th
July 2025.
***
8Chapter 2: Stakeholder Feedback on Regulations
1. Present Implementation Status
1.1. Following the notification of the Rating of Properties for Digital Connectivity
Regulations, 2024 and the release of the Rating Manual, the Digital Connectivity
Rating framework has entered its initial implementation phase. This phase has focused
on ecosystem readiness, including registration and capacity building of Digital
Connectivity Rating Agencies (DCRAs), registration of Property Managers, and
awareness creation among ecosystem stakeholders.
1.2. The Authority is conscious of the fact that this rating framework is one of its kind in
the digital connectivity ecosystem so far. Therefore, it has to be agile to quickly adapt
to the stakeholder needs, whenever required.
1.3. Therefore, the Authority has actively engaged with a wide range of stakeholders
across the digital connectivity and real estate ecosystem. These engagements have
provided important insights into how the framework is being understood, interpreted,
and expected to operate across different property types, stages of development, and
market contexts.
2. Stakeholder Inputs on Rating Framework
2.1. During formulation and early implementation of the Digital Connectivity Rating
framework, the Authority engaged with stakeholders through multiple interactions,
including workshops with registered Digital Connectivity Rating Agencies (DCRAs)
and central government ministries and departments, interactions with Property
Managers and real estate stakeholders during awareness and onboarding initiatives,
and other relevant public sector institutions.
92.2. In addition to inputs received from stakeholders through these interactions, the
Authority also undertook its own assessment based on early implementation
experience, feedback on Rating Manual, and examination of how the framework
implementation is progressing across different property types and stages of
development.
2.3. Collectively, these stakeholder inputs and the Authority’s assessment indicate broad
support for the objectives of the Digital Connectivity Rating framework, particularly
its focus on improving in-building digital connectivity, enabling informed consumer
choice, and encouraging systematic provisioning of Digital Connectivity
Infrastructure (DCI).
2.4. At the same time, the above interactions highlighted few areas where additional clarity
or refinement may be relevant, particularly in relation to:
a) the ability of the rating to meaningfully differentiate between properties with
varying levels of digital connectivity readiness and performance;
b) the application of the rating framework in the context of properties under
construction, which constitute a significant segment of the real estate market; and
c) the review of present categorisation of certain property types under Category ‘A’
and Category ‘B’.
d) the need of Property Managers to seek a fair evaluation of its Digital Connectivity
Infrastructure in order to plan improvement even before applying for a Digital
Connectivity Rating.
102.5. Review of Star Rating Levels
2.5.1. As per Regulation 26, properties are currently assigned digital connectivity ratings
on a five-star scale, based on aggregate scores achieved across prescribed criteria
and sub-criteria as follows:
Digital Connectivity Rating to
S.
Score Range
be awarded
No
1 25-40
2 41-55
3 56-70
4 71-85
5 More than 85
2.5.2. Stakeholders observed that, in practice, properties with different levels of digital
connectivity readiness may fall within the same star category, particularly where
scores lie close to the boundaries between rating levels.
2.5.3. From the perspective of Property Managers, such outcomes limit the ability to
reflect incremental improvements in digital connectivity performance.
Stakeholders further highlighted that under the current structure, progression from
one Star rating to the next Star level requires a minimum additional score of
approximately 15 points. As a result, even where measurable improvements are
made across one or more criteria or sub-criteria, such improvements may not
translate into a higher star rating unless the cumulative score crosses the next
11defined threshold. From the perspective of consumers, they reduce the extent to
which ratings convey nuanced differences in connectivity experience between
properties.
2.5.4. Stakeholders noted that this has implications for how rating outcomes are
interpreted and used by different participants within the ecosystem.
2.6. Rating of Properties Under Construction
2.6.1. Stakeholders highlighted that a substantial proportion of residential and
commercial properties in the country are marketed, booked and sold during the
construction phase itself, often well before physical completion.
2.6.2. The regulations already recognise the relevance of Digital Connectivity
Infrastructure (DCI) during the construction stage. Regulation 17 provides that “(1)
Every property manager shall comply with the approved design for implementation
of DCI during the construction stage and shall not make any change without the
prior approval of the agency which has granted such approval.”
2.6.3. For under-construction properties, currently as per Rating Manual (3.7 vi. e.), “The
Due Diligence stage-II for under construction will commence on completion of DCI
construction, testing and integration”.
2.6.4. While Property Managers may make design-stage provisions for Digital
Connectivity Infrastructure (DCI), there is currently no structured mechanism or
recognised document through which the intended level of digital connectivity can
be communicated during the marketing and booking of properties including in
construction phase. Consequently, Property Managers are unable to credibly
demonstrate the level of digital connectivity planned in the property, and
12consumers, who often make purchase decisions at this stage, have no visibility into
the planned level of digital connectivity for which the property is being designed.
2.6.5. The Authority noted that aforesaid aspect is important for the property managers to
encourage them for planning the digital connectivity infrastructure as a part of
building plan while preserving the credibility of digital connectivity ratings.
Therefore, there is need for a structured and transparent mechanism that
provides visibility of rating right from design stage through construction to
completion stages within the framework of assessment of digital connectivity under
the regulation.
2.7. Categorisation of Property Types
2.7.1. The objective of classification of properties as specified in regulation 3 is solely for
the purpose of applying the rating criteria which are relevant to assess the digital
connectivity in the respective category or group of properties. Currently the
regulation 3 provides for the following grouping of properties under Category ‘A’
and ‘B’:
Sl.
Classification Category Type of Property
No.
Apartments, independent houses, gated
1. Residential A
communities or societies, etc.
All properties of the Central Government,
Government the State Government, Courts, Public Sector
2. A
Properties Undertakings, Local Bodies, Heritage Sites,
etc.
Commercial Commercial office complex, shopping
3. A
Establishments malls, industrial estates, SEZs, multi-modal
13Sl.
Classification Category Type of Property
No.
logistic parks, convention centres, etc.
Airport, Bus Station, Railway Station,
Other private
4. B Hospitals, Hotels, Educational Institutions,
or public areas
etc.
Stadiums or
Sport Arenas or Stadiums or permanent spaces of gathering
5. spaces of B with seating capacity of more than 5000
frequent persons
gathering
Transport Expressways, Highways, Railways routes,
6. B
corridors etc.
2.7.2. During Authority’s assessment of implementation experience, it was noted that
certain property types presently included under Category ‘B’, such as hospitals,
hotels, and educational institutions, exhibit usage patterns and in-building digital
connectivity requirements comparable to commercial office complexes and
shopping malls, which are classified under Category ‘A’. Conversely, it is also
observed that requirements of certain property types currently included under
Category ‘A’, such as multi-modal logistics parks, are more aligned with properties
under Category ‘B’. Further, under the existing classification, “Transport corridors”
include expressways, highways, railway routes, etc. While metro corridors are not
explicitly mentioned, they form a critical part of urban transport infrastructure and
hence needed to clearly mentioned and classified for clarity of stakeholders.
142.8. Digital Connectivity Evaluation without entering into Rating Process
2.8.1. The Authority is of the view that there may be scenarios where a Property Manager
may wish to evaluate present level of Digital Connectivity Infrastructure (DCI) in
a property for the purpose of identifying gaps and improvements required, without
applying for a Digital Connectivity Rating.
2.8.2. Stakeholders highlighted that once a rating is awarded, it becomes publicly visible,
and therefore some Property Managers prefer to first identify gaps and undertake
improvements before entering into a formal rating assessment.
2.8.3. Stakeholders further indicated that, in such situations, Property Managers may find
value in obtaining an audit of the existing digital connectivity infrastructure against
the criteria and sub-criteria prescribed in the Rating Manual, primarily for assessing
the present status, gaps and areas requiring improvement.
2.8.4. The Authority notes that such audits may encourage proactive enhancement of
Digital Connectivity Infrastructure and may, over time, support wider adoption and
effectiveness of the Digital Connectivity Rating framework. Therefore, the
Authority proposed to enable the property managers to undertake optional digital
connectivity audit of their properties through TRAI registered DCRAs without
applying for the ratings. The property managers will be free to choose the DCRA
and negotiate fees with them. DCRAs will declare their maximum chargeable fee
on the rating platform for the reference of the Property Managers. DCRAs will audit
the digital connectivity in accordance with the rating manual and provide relevant
details including sub-criteria wise present status of digital connectivity and areas
for improvement in their audit report.
152.9. Summary of Inputs
The above analysis highlight areas where additional clarity, refinement, or alignment
with on-ground practices may support effective implementation and wider adoption
of the rating framework under the regulations. Accordingly, these inputs form the
basis for examining possible approaches, as discussed in the following chapter.
***
16Chapter 3: Analysis and Proposed Amendments to the Regulations
1. Background and Context
1.1. As discussed in Chapter 2, inputs received from stakeholders during early
implementation of the Digital Connectivity Rating framework, along with Authority’s
own assessment, indicate that while the framework is conceptually robust, certain
aspects would benefit from additional clarity and refinement to enhance effectiveness
and usability.
1.2. Accordingly, the Authority has identified specific provisions of the Regulations for
amendments to meet practical requirements, improve transparency for consumers, and
support smoother adoption by Property Manager and other stakeholders.
1.3. Accordingly, the proposed amendments relate to:
a) Review of Star Rating Levels
b) Rating of Properties Under Construction; and
c) Categorisation of Property Types
d) Optional Digital Connectivity Audit
The proposed amendments in the regulations in each of above case are discussed in
following sections.
2. Proposed Amendment I: Review of Star Rating Levels
2.1. Existing Provision under the Regulations
2.1.1. As per regulation 26, properties are currently rated on a five-level star rating scale,
namely 1-Star, 2-Star, 3-Star, 4-Star, and 5-Star, based on the score achieved against
the applicable criteria and sub-criteria. Current rating approach:
17Digital Connectivity
S.
Score Range
Rating to be awarded
No
1 25-40
2 41-55
3 56-70
4 71-85
5 More than 85
2.1.2. Under the existing framework, properties are assigned digital connectivity ratings
on a five-star scale, based on aggregate scores achieved across prescribed criteria
and sub-criteria as mentioned in regulation 26.
2.1.3. It is noted that in practice, the score range for each rating is too wide and the
properties with different levels of digital connectivity readiness may receive the
same star rating, particularly where overall scores lie close to the lower or upper
range of score for any Star level. For example, a property scoring 56 and another
property scoring 70 would both be awarded a 3-Star rating, despite a difference of
14 in overall score. Similarly, a property scoring 71 and another scoring 85 would
both receive a 4-Star rating, even though the latter demonstrates significantly higher
compliance across criteria and sub-criteria.
2.1.4. From the perspective of consumers, such outcomes may limit the ability to clearly
distinguish between properties offering marginally different levels of digital
connectivity experience. From the perspective of Property Managers, it may reduce
18incentives for making incremental improvements beyond minimum threshold
requirements.
2.2. Proposed Amendment to the Regulation
2.2.1. In order to address the above observation and provide a more nuanced
representation of digital connectivity performance of the property, it is proposed
to refine the rating scale by introducing additional half-star levels similar to the
approach adopted by Bureau of Energy Efficiency (BEE) for assigning the energy
efficiency levels for electrical appliances.
2.2.2. Under the proposed amendment, the digital connectivity rating levels shall be
expanded from five levels to nine levels, as follows: 1, 1.5, 2, 2.5, 3, 3.5, 4, 4.5, and
5 Stars
Digital Connectivity
S.
Score Range
Rating to be awarded
No
1 >=25-32
2 >32-40
3 >40-48
4 >48-56
5 >56-64
6 >64-72
7 >72-80
19Digital Connectivity
S.
Score Range
Rating to be awarded
No
8 >80-88
9 More than 88
2.2.3. The proposed refinement does not involve any change to the existing criteria and
sub-criteria; the scoring methodology; or the assessment process.
2.2.4. The revised rating scale is expected to enable clearer differentiation between
properties with varying levels of digital connectivity, provide more meaningful and
transparent information to consumers at the time of decision-making and encourage
Property Managers to pursue continuous and incremental improvements in Digital
Connectivity Infrastructure (DCI).
3. Proposed Amendment II: Rating of Properties Under Construction
3.1. Existing Rating Process as per the Rating Manual
3.1.1. Section 3.7 of the Rating Manual sets out a structured, multi-stage rating
process, applicable to both constructed and under-construction properties. The key
stages are explained below:
20a) Registration of Property Manager: Property Manager register on the Digital
Connectivity Rating Platform. Registration enables Property Managers to apply
for rating for their properties.
b) Application for rating of property: The Property Manager applies for rating of
its property and submits details and documents as per regulation and rating
manual. This shall include details relating to the Property Manager and the
property, such as property name, type, category, status, proof of ownership and
ownership details, property address and area particulars, building layout plans
including areas proposed for assessment, etc. Property Manager must also select
DCRA for the assessment.
c) Due Diligence Stage I (Document Review and Preliminary Assessment): In
this stage, the DCRA conducts Due Diligence Stage–I to assess whether the
submitted information and documents meet the basic requirements for
evaluation.
i. The DCRA reviews documents to verify completeness and consistency.
ii. If additional information or clarification is required, the DCRA raises queries
through the platform. The Property Manager is required to respond within
the prescribed timelines.
iii. For under-construction properties, the DCRA may visit the site at suitable
stages to assess whether planned DCI is aligned with approved designs.
iv. This stage is intended to ensure that the property is ready for detailed
evaluation.
d) Due Diligence Stage I (Preliminary Evaluation Comments and Action
Points): Based on Document Review and Preliminary Assessment, the DCRA
21shares preliminary evaluation comments with the Property Manager. Action
points, if any, are categorised as Mandatory, Recommended and Optional by
DCRA and are communicated to Property Manager via Rating platform.
e) Corrective Actions by Property Manager: Property Manager shall take
remedial actions on mandatory points to proceed for second stage of evaluation.
Compliance with mandatory action points is required to proceed to the next stage.
Property Managers are encouraged to also consider recommended and optional
actions to achieve a higher rating. Once mandatory actions are completed, the
Property Manager may request initiation of Due Diligence Stage–II.
f) Due Diligence Stage II: The DCRA conducts onsite assessment of deployed
DCI against prescribed criteria and sub-criteria as per regulation 24 and 25. For
under-construction properties, this stage commences only after completion of
DCI construction, testing and integration.
g) Final Evaluation by DCRA and Award of Rating: The DCRA prepares the
assessment report, updates scores for the property for respective criteria and sub-
criteria as per methodology mentioned in Chapter 4 and 5 of Rating Manual, and
issue the Digital Connectivity Rating certificate, which will be available for
public verification.
3.1.2. The above process functions appropriately for constructed properties and remains
unchanged.
3.1.3. As discussed in Chapter 2, stakeholders highlighted that a large number of
properties are marketed and sold during the construction phase, often before
physical completion.
223.1.4. The Rating Manual currently provides that, for under-construction properties, Due
Diligence Stage–II shall commence only after completion of Digital
Connectivity Infrastructure (DCI) construction, testing and integration,
thereby ensuring that final ratings are based on actual on-ground assessment.
3.1.5. While the existing process ensures that final ratings are based on actual on-ground
assessment, stakeholder interactions indicated that during the construction phase
there is no structured mechanism through which the intended level of digital
connectivity or target star rating can be communicated to the prospective
customers.
3.1.6. It is further noted that during the construction phase:
a) Property Managers, despite planning DCI at the design stage, are unable to
demonstrate such preparedness in a standardised and credible manner; and
b) consumers, who often make purchase decisions at this stage, have no visibility
of the planned level of digital connectivity in properties.
3.1.7. Stakeholder interactions indicate that while the existing process safeguards
assessment integrity, it does not address the practical need for visibility and
transparency during the construction phase, when properties are actively
marketed and sold.
3.2. Proposed Rating Process for Properties Under Construction
3.2.1. To address the above stakeholders’ input, it is proposed to adapt certain steps
within the existing process, particularly at the application stage and Due
Diligence Stage–I, while retaining all other stages as prescribed in the Rating
Manual.
233.2.2. The proposed process remains aligned with the Rating Manual. Only specific steps
are supplemented; all remaining steps continue unchanged.
3.2.3. Proposed Flow for Properties Under Construction: The following diagram
provides the process of rating for the properties under construction. Each stage of
the process, including issue of certificate at the building plan stage and the final
rating after the construction is complete, is discussed in the following paras.
a) Registration of Property Manager: Property Manager register on the Digital
Connectivity Rating Platform. Registration enables Property Managers to apply
for rating for its properties.
b) Application for rating of property: Property Managers of under-construction
properties may apply for a digital connectivity rating in accordance with the
Regulations, once all components of Digital Connectivity Infrastructure
(DCI) (covering relevant criteria and sub-criteria as per regulations 24 and
25) have been planned and approved as part of the building plan and
implementation design is ready. In addition to the standard requirements under
the step “Application for Rating of Property”, the Property Manager shall submit
a declaration specific to under-construction properties, in the format
provided at Annexure-IV. The declaration shall include the following:
i. the target star rating that the property intends to achieve.
ii. a rating criterion-wise and sub-criterion-wise plan, including:
24a. the proposed measures and design provisions to achieve the declared target
rating;
b. the target score proposed against each applicable sub-criterion; and
c. explanatory remarks mapping the proposed measures to approved design
documents.
iii. The plan shall be supported by approved design documents and relevant
documentary evidence, such as approved building plans for DCI, layouts,
infrastructure schematics, and other supporting technical documents related to
DCI.
iv. The Property Manager shall provide appropriate documentary evidence for
each applicable sub-criterion, along with structured responses to specific
questions, where prescribed, in order to enable the DCRA to assess the level
of digital connectivity provisions at the design stage. Such responses shall
clearly explain how the proposed Digital Connectivity Infrastructure complies
with the requirements of the relevant criterion and sub-criterion.
In addition to the declaration and supporting documents specified above,
Property Managers of under-construction properties shall submit all
information, particulars, and documents as per regulation and rating manual.
This shall include details relating to the Property Manager and the property,
such as property name, type, category, status, proof of ownership and
ownership details, property address and area particulars, building layout plans
including areas proposed for assessment, and any other information or
documents required for assessment of digital connectivity under the
Regulations and the Rating Manual.
25c) Due Diligence Stage I (DCI Design Review, Assessment and Certification by
DCRA): For under-construction properties, the DCRA shall review the
submitted declaration and documents to verify completeness, consistency, and
alignment with the digital connectivity rating framework. This stage is limited to
building plan and DCI design verification and preliminary evaluation, including
site visits, where appropriate, to assess alignment with approved designs. During
the review of the declaration, design documents, and supporting information
submitted by the Property Manager:
i. the concerned Digital Connectivity Rating Agency (DCRA) shall assess the
extent to which the proposed design-stage provisions in the property align with
the applicable rating criteria and sub-criteria;
ii. In respect of those criteria and sub-criteria which involve parameters (such as
network speed, coverage, no. of service providers etc.) that cannot be
physically verified during the under-construction stage, the assessment shall
be based on the structured responses provided in this declaration and the
supporting documentary evidence submitted by the Property Manager. Such
assessment shall be indicative in nature and subject to verification during Due
Diligence Stage–II upon completion of construction and commissioning of
Digital Connectivity Infrastructure.
iii. based on such assessment, the DCRA shall determine the appropriate design-
stage star level corresponding to the planned Digital Connectivity
Infrastructure; and
iv. the property shall be listed on the rating platform with the design-stage star
level as assessed by the DCRA, along with an indication that the rating is
based on design-stage evaluation;
26v. Accordingly, a certificate indicating “Designed for XX Stars”, as assessed
by the DCRA, shall be issued to property manager;
vi. The “Designed for XX Stars” certificate will be indicative in nature,
reflecting design-stage preparedness only, and shall not be treated as a final or
provisional Digital Connectivity Rating;
vii. This step must be completed by DCRA within a reasonable period.
d) Construction Phase Monitoring by DCRA: As the deployment of Digital
Connectivity Infrastructure progresses during construction, the concerned
DCRA, at appropriate stages of construction, will monitor the development of
DCI as per submitted design for obtaining rating for design stage and may also
suggest corrective and improvement action points, if required, to Property
Manager.
e) Intimation of completion of DCI by Property Manager and Confirmation
by DCRA: Upon completion of construction and implementation as per DCI
design, testing, and integration of Digital Connectivity Infrastructure, the
Property Manager shall intimate the concerned DCRA through the rating
platform. Based on such intimation, the DCRA shall verify whether the DCI has
been implemented in accordance with the approved design-stage submissions
and shall record its confirmation on the rating platform, clearly indicating any
deviations, if observed, from the approved design.
f) Due Diligence Stage II: Upon completion of construction, testing, and
integration of Digital Connectivity Infrastructure, and after confirmation by the
concerned DCRA as recorded on the rating platform, the Property Manager
may submit a request for initiation of Due Diligence Stage II through the
rating platform. Due Diligence Stage II shall be initiated only upon such request
27by the Property Manager and shall involve full on-site assessment by the
DCRA in accordance with the Regulations and the Rating Manual as applicable
to already constructed properties.
g) Final Evaluation and Award of Rating: Following Due Diligence Stage II, the
DCRA prepares the assessment report, updates scores for the property for
respective criteria and sub-criteria, and issues the final Digital Connectivity
Rating certificate, which is available for public verification.
3.3. With these proposed additional steps, it is expected that both constructed properties
and properties under construction shall be uniformly and transparently governed
under the digital connectivity rating framework, from the building plan and design
stage through to completion of construction and commissioning.
4. Proposed Amendment III: Categorisation of Property Types
4.1.1. As discussed in Chapter 2, it has been observed that certain property types exhibit
digital connectivity usage patterns and infrastructure requirements that are more
closely aligned with a different category than presently specified under Regulation
3.
4.1.2. The objective of categorisation under Regulation 3 is to ensure that appropriate and
relevant rating criteria are applied for assessment of digital connectivity.
Accordingly, alignment of property categories with applicability of bye laws, actual
usage patterns and digital connectivity requirements is important for ensuring
consistency and effectiveness of the rating framework.
4.2. Proposed Amendment
4.2.1. To better align property categorisation with digital connectivity requirements, the
following amendments are proposed under Regulation 3:
28(i) Multi-modal logistics parks should be moved from Category ‘A’ to Category ‘B’.
(ii) Hospitals, Hotels, and Educational Institutions should be moved from Category
‘B’ to Category ‘A’.
4.2.2. Revised table for categories of properties for evaluation and assessment of digital
connectivity is as follows:
Sl.
Classification Category Type of Property
No.
Apartments, independent houses, gated
1. Residential A
communities or societies, etc.
All properties of the Central Government,
Government the State Government, Courts, Public
2. A
Properties Sector Undertakings, Local Bodies,
Heritage Sites, etc.
Commercial office complex, shopping
Commercial malls, industrial estates, SEZs, convention
3. A
Establishments centres, Hospitals, Hotels, Educational
Institutions, etc.
Other private or Airport, Bus Station, Railway Station,
4. B
public areas multi-modal logistic parks, etc.
Stadiums or Sport Stadiums or permanent spaces of
5. Arenas or spaces of B gathering with seating capacity of more
frequent gathering than 5000 persons
Expressways, Highways, Railways routes,
6. Transport corridors B
Metro corridors etc.
295. Proposed Amendment IV: Optional Digital Connectivity Audit
5.1. Background
5.1.1. As discussed in Chapter 2, the Authority has noted that there may be scenarios
where a Property Manager may wish to review the level of Digital Connectivity in
a property for internal evaluation and improvement purposes, without immediately
applying for a Digital Connectivity Rating under the Regulations.
5.1.2. Inputs received from Property Managers indicate that, in certain cases, Property
Managers may prefer to first understand the present status of digital connectivity,
identify gaps, and undertake corrective actions before opting for a formal rating
assessment, if required.
5.1.3. The Authority is of the view that facilitating such optional improvement-oriented
audit may support wider adoption of digital connectivity best practices and
encourage Property Managers to proactively enhance Digital Connectivity
Infrastructure.
5.2. Proposed Approach
5.2.1. It is proposed to enable optional digital connectivity audit, whereby a Property
Manager may, on a voluntary basis, engage a registered Digital Connectivity Rating
Agency (DCRA) to undertake an audit of the property’s digital connectivity based
on the criteria and sub-criteria specified in the Rating Manual and Regulation.
5.2.2. For the limited purpose of facilitating initiation of such audit and enabling
transparency in timelines, a simple electronic form may be made available on the
Rating Platform. The form shall capture basic details of the Property Manager and
the property, along with selection of registered DCRA.
305.2.3. Upon submission of such request by the Property Manager, one or more DCRA(s),
as selected by the Property Manager, shall be notified through the platform.
Thereafter, the Property Manager and the selected DCRA may mutually agree on
the scope of audit, timelines for completion, and fee structure.
5.2.4. Once mutual agreement is reached, the DCRA shall update its acceptance of the
audit request on the platform along with the agreed date of completion of the audit.
5.2.5. The DCRA shall update the status of such audit on the platform upon completion.
The role of the platform shall be limited to facilitation of initiation and status
tracking only.
5.2.6. The outcome of an Optional Digital Connectivity Audit may include a report
indicating the present status of Digital Connectivity, identification of gaps against
the applicable criteria and sub-criteria as per Rating Manual, and actionable
recommendations for improvement. Any indicative score or indicative star rating
level, if provided, shall be non-binding and for internal reference only.
5.2.7. The digital connectivity audit report prepared by the DCRA shall be shared directly
with the Property Manager. Refer Annexure-V of this consultation paper for
indicative template for Optional Digital Connectivity Audit Report.
5.2.8. Such optional audit shall not create any right, expectation, or entitlement with
respect to award of a Digital Connectivity Rating.
5.2.9. Participation in Optional Digital Connectivity Audit shall not be a prerequisite for
applying for a Digital Connectivity Rating, nor shall it have any bearing on the
outcome of a rating assessment undertaken under the Regulation.
5.2.10. High-level workflow for Optional Digital Connectivity Audit is as follows:
31a) Submission of Audit Request: The Property Manager submits a Optional
Digital Connectivity Audit request through a simple electronic form on the
rating platform capturing basic property manager and property details along
with selection of DCRA.
b) Notification to DCRA(s) and submission of proposals to Property
Manager: The shortlisted DCRA(s) receives intimation of the audit request
through the platform. The concerned DCRA(s) will do the due diligence and
submit their proposals directly to the Property Manager. DCRA may also
request for on-site visit if required.
c) Mutual Agreement: The Property Manager and the selected DCRA mutually
agree on scope of audit, timelines, and fee. The Property Manager shall update
the selected DCRA on the platform.
d) Acceptance Update: The DCRA updates acceptance of the audit request along
with agreed date of completion.
e) Conduct of Audit: The DCRA undertakes assessment of Digital Connectivity
against applicable criteria and sub-criteria, including on-site assessment, as per
rating manual and prepare audit report.
f) Report Sharing: The report is shared directly between the DCRA and the
Property Manager.
32g) Status Update: The DCRA updates the status of audit as ‘completed’ on the
platform for monitoring purposes.
6. Summary of Proposed Amendments : Based on the analysis set out above, the
Authority has proposed Amendments relating to:
(i) refinement of the Star Rating Levels through introduction of half-star
levels for better differentiation
(ii) structured design-stage assessment mechanism for properties under
construction, including issuance of an indicative “Designed for XX Stars”
certificate
(iii) realignment of certain property types between Category ‘A’ and Category
‘B’ and
(iv) recognition of an Optional Digital Connectivity Audit mechanism for
evaluation and improvement purposes.
Additionally, certain clarifications are proposed under the Code of Conduct for DCRAs
to further strengthen impartiality and independence in the rating process. The Draft
Regulation incorporating the proposed amendments is placed at Annexure-II. The Draft
Rating manual incorporating the proposed amendments is placed in Annexure-III. In
addition to comments on the proposed amendments, stakeholders are also invited to
submit their comments, feedback, or suggestions on any other provisions of the
Regulations, in the format prescribed in Annexure-I.
***
33Chapter 4: Proposed Amendments in Regulation
Based on the background set out in Chapter 1, the stakeholder inputs and Authority’s
assessment discussed in Chapter 2, and the proposed changes explained in Chapter 3, the
details of proposed amendments in the Regulations are as follows:
TO BE PUBLISHED IN THE GAZETTE OF INDIA
EXTRAORDINARY PART III SECTION
TELECOM REGULATORY AUTHORITY OF INDIA
NOTIFICATION
NEW DELHI, the Date XX Month, 2026
F. No C-2/3/(2)/2021-QoS: In exercise of the powers conferred by section 36, read with
sub-clauses (i) and (v) of clause (b), clause (c) and clause (d) of sub-section (1) of section
11, of the Telecom Regulatory Authority of India Act, 1997 (24 of 1997), the Telecom
Regulatory Authority of India hereby makes the following regulations further to amend the
Rating of Properties for Digital Connectivity Regulations, 2024 (7 of 2024), namely:-
RATING OF PROPERTIES FOR DIGITAL CONNECTIVITY (FIRST
AMENDMENT)
REGULATIONS, 2026 (XX of 2026)
1. Short title, extent and commencement.— (1) These regulations may be called the
Rating of Properties for Digital Connectivity (First Amendment) Regulations, 2026.
(2) These regulations shall come into force with effect from XX.YY.2026.
2. In regulation 3 of the Rating of Properties for Digital Connectivity Regulations, 2024
(7 of 2024) (hereinafter referred to as the principal regulations), in sub-regulation (1),
in the table, under the column ‘Type of Property’-
34(i) against serial number (3), for the character “Commercial office complex, shopping
malls, industrial estates, SEZs, multi-modal logistic parks, convention centres,
etc.”, the character “Commercial office complex, shopping malls, industrial
estates, SEZs, convention centres, Hospitals, Hotels, Educational Institutions,
etc.”, shall be substituted;
(ii) against serial number (4), for the character “Airport, Bus Station, Railway Station,
Hospitals, Hotels, Educational Institutions, etc.”, the character “Airport, Bus
Station, Railway Station, multi-modal logistic parks, etc.”, shall be substituted;
(iii) against serial number (6), for the character “Expressways, Highways, Railways
routes, etc.”, the character “Expressways, Highways, Railways routes, Metro
corridors etc.”, shall be substituted;
3. In regulation 14 of the principal regulations, in sub-regulation (1), the following
provisos shall be inserted, namely-
“Provided that an application for rating of properties, under construction, shall be
accompanied with approved design documents and other relevant details as may be
specified by the Authority.
Provided further that the property manager may also undertake optional digital
connectivity audit through the registered DCRAs without applying for rating for digital
connectivity.”
4. In regulation 24 of the principal regulations, in sub-regulation (1), for Note (ii), the
following clause shall be substituted, namely-
“For the purposes of rating for digital connectivity, MBBL issued by Ministry of
Housing and Urban Affairs (MoHUA) shall be referred in cases where Building
Byelaws of Cities/State or Union Territory do not have provisions for digital
connectivity infrastructure.”
355. In regulation 26 of the principal regulations, in sub-regulation (2), for table, the
following table shall be substituted, namely-
S. Digital Connectivity Rating
Score Range
No to be awarded
1 >=25-32
2 >32-40
3 >40-48
4 >48-56
5 >56-64
6 >64-72
7 >72-80
8 >80-88
9 More than 88
6. In Schedule-I of the principal regulations, for item (i), the following item shall be
substituted, namely-
“(i) Impartiality and independence: DCRA shall remain impartial and
independent during digital connectivity assessment and entire rating process. DCRA
should not have any financial interest or ownership or operational interests in the
property under evaluation and assessment. To avoid any conflict of interest, any DCRA
providing DCI services shall not undertake digital connectivity assessment of
properties where another DCRA has provided DCI services. DCRA shall establish
policy and procedures for reviewing the work of its agents/employees to ensure
independence of evaluation and assessment without external influences.”
Secretary, TRAI
36Note.1. - The principal regulations were published in the Gazette of India, Extraordinary,
Part III, Section 4 dated the 25th October 2024 vide notification number No. C-2/3/(2)/2021-
QoS dated the 25th October 2024
***
37Chapter 5: Proposed Amendments in Rating Manual
Based on the background set out in Chapter 1, the stakeholder inputs and Authority’s
assessment discussed in Chapter 2, and the proposed changes explained in Chapter 3, the
details of proposed amendments in respective chapter of the Rating Manual are as follows:
1. Proposed Amendments in Chapter 1 of Rating Manual:
(a) In Section 1.3. Background and Purpose, following shall be inserted after first
paragraph:
“The framework also recognizes the importance of enabling visibility of planned
digital connectivity at the design and construction stages of properties, while
ensuring that final ratings continue to be awarded based on actual on-ground
assessment.”
(b) In Section 1.4. Digital Connectivity Rating Framework, under sub-section i.
Standardized Process, following shall be inserted in first paragraph:
“The standardized process also provides for assessment of digital connectivity at
different stages of property development, as specified in the regulations.”
2. Proposed Amendments in Chapter 2 of Rating Manual:
(a) In Section 2.1. Digital Connectivity Rating Agency (DCRA), following shall be
inserted after point vii.:
“In addition to the above, a DCRA may, on a voluntary basis and upon request by
a Property Manager, undertake an Optional Digital Connectivity Audit for internal
review and improvement purposes for a property, outside the formal rating process
and without award of any Digital Connectivity Rating.”
(b) In Section 2.2. Property Manager (PM), following shall be inserted under i.
Application for ratings after point c.:
38“d. For under-construction properties, the Property Manager shall also submit a
declaration and supporting design-stage documents, as prescribed by the
Authority.”
(c) In Section 2.2. Property Manager (PM), following shall be inserted after v.
Customer communication and tenant engagement:
“A Property Manager may, at its discretion, engage a registered Digital
Connectivity Rating Agency (DCRA) for an Optional Digital Connectivity Audit of
the property for the purpose of identifying gaps and undertaking improvements in
Digital Connectivity Infrastructure, without applying for a Digital Connectivity
Rating under the Regulations.”
3. Proposed Amendments in Chapter 3 of Rating Manual:
(a) In Section 3.6. Classification of Properties for Rating, following shall be the
amendments in Table 3.1 Classification of Properties for Rating of digital
connectivity:
(i) At serial number 3. Commercial Establishments, properties in “Type of
Property” column shall be substituted as “Commercial office complex,
shopping malls, industrial estates, SEZs, convention centres, Hospitals, Hotels,
Educational Institutions, etc.”
(ii) At serial number 4. Other private or public areas, properties in “Type of
Property” column shall be substituted as “Airport, Bus Station, Railway
Station, multi-modal logistic parks, etc.”
(iii) At serial number 6. Transport corridors, properties in “Type of Property”
column shall be substituted as “Expressways, Highways, Railways routes,
Metro corridors etc.”
(b) In Section 3.7. Rating Process for Constructed Properties, following figure
shall be inserted as Figure 3.1: High Level Rating Workflow for Constructed
Properties after first paragraph:
39(c) After Section 3.7. “Rating Process for Constructed Properties”, a new Section
3.8. “Rating Process for Properties Under Construction”, shall be inserted:
“3.8. Rating Process for Properties Under Construction
The rating process for digital connectivity in properties under construction follows
a structured, multi-stage evaluation approach to ensure transparency, consistency,
and reliability in assessment, while preserving the integrity of final rating outcomes.
The framework enables design-stage assessment of Digital Connectivity
Infrastructure (DCI) readiness during the construction phase and provides for final
evaluation based on on-ground verification after completion of construction. This
framework is designed to evaluate service quality, infrastructure readiness, and user
experience, ultimately assigning a rating that reflects the property’s ability to
support digital connectivity efficiently. The following steps outline the rating
lifecycle and role of DCRA and Property Manager:
Figure 3.2: High Level Rating Workflow for Properties Under Construction
i. Registration by DCRA and Property Managers: As already outlined in
Section 3.2 and Section 3.4 of this manual, the interested DCRA and Property
Managers need to register on the online rating platform. A one-time and non-
refundable registration fee, as prescribed by the Authority, must be paid by
40the property manager at the time of registration. The registration enables
Property Managers to apply for a rating assessment of their properties. The
property manager may also apply for the rating of under construction
properties to enable assessment and guidance by DCRA on implementation of
DCI in line with the provision. However, the rating certificate shall be issued
after provisioning DCI as per the requirement of the regulation for rating
criteria.
ii. Application for Rating of Properties:
a. Property Managers seeking rating for the property under construction
shall submit an online application in accordance with regulations, once
all components of Digital Connectivity Infrastructure (DCI)
(covering relevant criteria and sub-criteria as per regulations 24 and
25) have been planned and approved as part of the building plan and
implementation design is ready.
b. A document checklist, including for fully constructed and under
construction properties, will be available in the Frequently Asked
Questions (FAQ) section on the rating platform.
c. In addition to the standard requirements, the Property Manager shall
submit a declaration specific to under-construction properties, in
format specified by the Authority. The declaration shall include the
following:
I. the target star rating that the property intends to achieve.
II. a rating criterion-wise and sub-criterion-wise plan, including:
(a) the proposed measures and design provisions to achieve
the declared target rating;
(b) the target score proposed against each applicable sub-
criterion; and
41(c) explanatory remarks mapping the proposed measures to
approved design documents.
III. The plan shall be supported by approved design documents and
relevant documentary evidence, such as approved building
plans for DCI, layouts, infrastructure schematics, and other
supporting technical documents related to DCI.
IV. The Property Manager shall provide appropriate documentary
evidence for each applicable sub-criterion, along with structured
responses to specific questions, where prescribed, in order to
enable the DCRA to assess the level of digital connectivity
provisions at the design stage. Such responses shall clearly
explain how the proposed Digital Connectivity Infrastructure
complies with the requirements of the relevant criterion and sub-
criterion.
d. In addition to the declaration and supporting documents specified
above, Property Managers of under-construction properties shall
submit all information, particulars, and documents as per regulation
and rating manual. This shall include details relating to the Property
Manager and the property, such as property name, type, category,
status, proof of ownership and ownership details, property address and
area particulars, building layout plans including areas proposed for
assessment, and any other information or documents required for
assessment of digital connectivity under the Regulations and the Rating
Manual.
e. Once application for rating is submitted by the property manager, the
system will generate a Unique Request Identification Number (URIN)
for tracking the application status.
f. The Property Manager can select any of the registered DCRA from the
list provided on the rating platform.
42g. The details of the maximum chargeable fee (MCF), to be charged by
different DCRAs, will be available on the rating platform.
h. Online application of the Property Manager will be automatically
assigned to the Digital Connectivity Rating Agency (DCRA) selected
during the submission of application for rating.
iii. Due Diligence Stage I (DCI Design Review, Assessment and Certification
by DCRA):
a. For under-construction properties, the DCRA shall review the
submitted declaration and documents to verify completeness,
consistency, and alignment with the digital connectivity rating
framework.
b. This stage is limited to building plan and DCI design verification and
preliminary evaluation, including site visits, where appropriate, to
assess alignment with approved designs.
c. During the review of the declaration, design documents, and supporting
information submitted by the Property Manager:
I. The concerned Digital Connectivity Rating Agency (DCRA) shall
assess the extent to which the proposed design-stage provisions
in the property align with the applicable rating criteria and sub-
criteria;
II. In respect of those criteria and sub-criteria which involve
parameters (such as network speed, coverage, no. of service
providers etc.) that cannot be physically verified during the
under-construction stage, the assessment shall be based on the
structured responses provided in this declaration and the
supporting documentary evidence submitted by the Property
Manager. Such assessment shall be indicative in nature and
subject to verification during Due Diligence Stage–II upon
43completion of construction and commissioning of Digital
Connectivity Infrastructure.
III. Based on such assessment, the DCRA shall determine the
appropriate design-stage star level corresponding to the planned
Digital Connectivity Infrastructure; and
IV. The property shall be listed on the rating platform with the
design-stage star level as assessed by the DCRA, along with an
indication that the rating is based on design-stage evaluation.
V. Accordingly, a certificate indicating “Designed for XX Stars”,
as assessed by the DCRA, shall be issued to property manager
VI. The “Designed for XX Stars” certificate will be indicative in
nature, reflecting design-stage preparedness only, and shall not
be treated as a final or provisional Digital Connectivity Rating.
VII. This step must be completed by DCRA within a reasonable
period
iv. Construction Phase Monitoring by DCRA:
a. As the deployment of Digital Connectivity Infrastructure progresses
during construction, the concerned DCRA, at appropriate stages of
construction, will monitor the development of DCI as per submitted
design for obtaining rating for design stage and may also suggest
corrective and improvement action points, if required, to Property
Manager.
v. Intimation of completion of DCI by Property Manager and Confirmation by
DCRA:
a. Upon completion of construction and implementation as per DCI
design, testing, and integration of Digital Connectivity Infrastructure,
the Property Manager shall intimate the concerned DCRA through the
rating platform.
44b. Based on such intimation, the DCRA shall verify whether the DCI has
been implemented in accordance with the approved design-stage
submissions and shall record its confirmation on the rating platform,
clearly indicating any deviations, if observed, from the approved
design.
vi. Due-Diligence Stage II:
a. Upon completion of construction, testing, and integration of Digital
Connectivity Infrastructure, and after confirmation by the concerned
DCRA as recorded on the rating platform, the Property Manager may
submit a request for initiation of Due Diligence Stage II through the
rating platform. Due Diligence Stage II shall be initiated only upon
such request by the Property Manager.
b. The Due Diligence stage-II will involve the process of onsite
verification of digital connectivity and associated infrastructure by the
DCRA against the prescribed rating criteria including as provided in
supporting documents.
c. The detailed methodology for scoring against each criterion and sub-
criteria and respective weightage is provided in Chapter 4 for
properties of category ‘A’ and Chapter 5 for properties of category ‘B’
of this manual.
d. The Due Diligence Stage-II will be completed by the DCRA in a time-
bound manner preferable within 60 days of submission of request by
the Property Manager for Due Diligence-II evaluation.
vii. Final Evaluation by DCRA and Award of Rating:
a. Final Evaluation by DCRA:
I. After the completion of Due Diligence stage - II, the DCRA shall
consolidate all the relevant details and prepare a comprehensive
assessment report. The assessment report shall cover the list of
45all documents collected; the summary criteria and sub-criteria
wise comments, documents, score awarded, and list of
test/evidence collected during the assessment.
II. The objective of each sub-criteria, methodology of assessment
and scoring criteria against each criterion and sub-criteria are
provided in Chapter 4 for properties of category ‘A’ and Chapter
5 for properties of category ‘B’.
III. In the end, the assessment report will provide the score card for
the property against each criteria and sub-criteria.
IV. A copy of assessment report with URIN and property details shall
be uploaded against respective property. The assessment report
will be digitally signed by the authorized representative of the
DCRA. This report will also be visible to the property manager
concerned.
V. The DCRA shall also update the score against each criterion and
sub-criteria on rating platform to generate the rating certificate.
b. Award of Rating:
I. After the rating score is updated in the rating platform, the
DCRA shall generate a rating certificate and sign it digitally.
II. The Property Manager will be able to download the rating
certificate through their registered account on the rating
platform against respective property till its validity.
c. Once the rating certificate is issued by DCRA, it will be available for
the public to view or verify the rating certificates either through unique
certificate number or QR code available on the certificate or other
search and filter criteria as may be provided on the rating platform.”
(d) After Section 3.8. “Rating Process for Properties Under Construction”, a new
Section 3.9. “Optional Digital Connectivity Audit”, shall be inserted:
46“3.9. Optional Digital Connectivity Audit
There may be scenarios where a Property Manager may wish to review the level of
Digital Connectivity Infrastructure (DCI) in a property for purpose of identifying
gaps and undertaking improvements, without applying for a Digital Connectivity
Rating. Additionally, once a rating is awarded, it becomes publicly visible, and
therefore some Property Managers prefer to first identify gaps and undertake
improvements before opting for a formal rating assessment.
In such situations, Property Managers may find value in obtaining an audit of the
existing digital connectivity infrastructure against the criteria and sub-criteria
prescribed in the Rating Manual, primarily for understanding the present status and
areas requiring improvement.
In such cases, Property Manager may, on a voluntary basis, engage a registered
Digital Connectivity Rating Agency (DCRA) to undertake an audit of the property’s
digital connectivity based on the criteria and sub-criteria specified in the
Regulation and this Rating Manual.
For the limited purpose of facilitating initiation of such audit and enabling
transparency in timelines, a simple electronic form may be made available on the
Rating Platform. The form shall capture basic details of the Property Manager and
the property, along with selection of a registered DCRA.
Upon submission of such request by the Property Manager, one or more DCRA(s),
as selected by Property Manager, shall be notified through the platform. Thereafter,
the Property Manager and the selected DCRA may mutually agree on the scope of
audit, timelines for completion, and fee structure.
Once mutual agreement is reached, the DCRA shall update its acceptance of the
audit request on the platform along with the agreed date of completion of the audit.
The DCRA shall update the status of such audit on the platform upon completion.
The role of the platform shall be limited to facilitation of initiation and status
tracking only.
47The outcome of an Optional Digital Connectivity Audit may include a report
indicating the present status of Digital Connectivity, identification of gaps against
the applicable criteria and sub-criteria as per Rating Manual, and actionable
recommendations for improvement. Any indicative score or indicative star rating
level, if provided, shall be non-binding and for internal reference only.
The digital connectivity audit report prepared by the DCRA shall be shared directly
with the Property Manager.
Such optional audit shall not create any right, expectation, or entitlement with
respect to award of a Digital Connectivity Rating.
Participation in an Optional Digital Connectivity Audit shall not be a prerequisite
for applying for a Digital Connectivity Rating, nor shall it have any bearing on the
outcome of a rating assessment undertaken under the Regulation.
High-level workflow for Optional Digital Connectivity Audit is as:
Figure 3.3: High Level Workflow for Optional Digital Connectivity Audit
i. Submission of Audit Request: The Property Manager submits a Optional
Digital Connectivity Audit request through a simple electronic form on the
rating platform capturing basic property manager and property details along
with selection of DCRA.
ii. Notification to DCRA(s) and submission of proposals to Property Manager:
The shortlisted DCRA(s) receives intimation of the audit request through the
platform. The concerned DCRA(s) will do the due diligence and submit their
proposals directly to Property Manager. DCRA may also request for on-site
visit if required.
48iii. Mutual Agreement: The Property Manager and the selected DCRA mutually
agree on scope of audit, timelines, and fee. Property Manager shall update
the selected DCRA on the platform.
iv. Acceptance Update: The DCRA updates acceptance of the audit request along
with agreed date of completion.
v. Conduct of Audit: The DCRA undertakes assessment of Digital Connectivity
against applicable criteria and sub-criteria, including on-site assessment, as
per this rating manual and prepare audit report.
vi. Report Sharing: The report is shared directly between the DCRA and the
Property Manager.
vii. Status Update: The DCRA updates the status of audit as ‘completed’ on the
platform for monitoring purposes.”
4. Proposed Amendments in Chapter 6 of Rating Manual:
(a) In Section 6.1. Classification of Ratings, Table 6.1 Rating Scorecard shall be
substituted as:
S. No. Score Range Digital Connectivity Rating to be awarded
1. >=25-32
2. >32-40
3. >40-48
4. >48-56
5. >56-64
6. >64-72
7. >72-80
49S. No. Score Range Digital Connectivity Rating to be awarded
8. >80-88
9. More than 88
5. Proposed Amendments in Chapter 11 of Rating Manual:
(a) In Section 11.1. Frequently Asked Questions (FAQ), response to FAQ xiv. shall
be substituted as:
“xiv. What are the key provisions that the DCRA must evaluate to assess
compliance with the applicable Model Building Bye-Laws (MBBL) and
National Building Code (NBC)?
The DCRA needs to evaluate whether the property’s Digital Connectivity
Infrastructure (DCI) has been provided in the property as per the requirement
of the latest applicable National Building Code (NBC) issued by Bureau of
Indian Standards (BIS) and Model Building Bye-Laws (MBBL) issued by
Ministry of Housing and Urban Affairs, Government of India (MoHUA).
As per Regulation 24, for the purposes of rating for digital connectivity,
MBBL issued by MoHUA shall be referred in cases where Building Byelaws
of Cities/State or Union Territory do not have provisions for digital
connectivity infrastructure.
For clarity and uniformity in assessment, the Authority has published a
separate “Checklist for compliance to MBBL and NBC in the Manual under
Rating of Properties for Digital Connectivity Regulations, 2024”. The DCRA
shall undertake evaluation in accordance with the items and compliance
impact specified in the said Checklist, as updated from time to time.”
(b) In Section 11.1. Frequently Asked Questions (FAQ), following FAQs shall be
inserted:
50“xviii. What is the objective of introducing design-stage assessment for properties
under construction?
The objective of introducing design-stage assessments for properties under
construction is to provide structured visibility of Digital Connectivity
Infrastructure (DCI) preparedness at the planning and construction stage,
when properties are often marketed and sold. This mechanism enables Property
Managers to integrate digital connectivity requirements into the building
design in a systematic manner and allows prospective buyers and tenants to
understand the intended level of digital connectivity.
xix. Can the “Designed for XX Stars” certificate be used in marketing and
promotional materials?
Yes, the Property Manager may use the “Designed for XX Stars” certificate for
marketing purposes during the construction phase, provided it is clearly
represented as a design-stage assessment only. The certificate shall not be
presented as a final Digital Connectivity Rating and shall not mislead
consumers regarding the final rating outcome.
xx. Will the design-stage star level be publicly visible on the rating platform?
Yes. The design-stage star level assessed by the DCRA shall be displayed on
the rating platform with a clear indication that it is based on design-stage
evaluation and not a final Digital Connectivity Rating. This ensures
transparency while preserving clarity between design-stage preparedness and
final rating.
xxi. Can the target star rating declared by the Property Manager guarantee the
final rating?
No. The target star rating declared by the Property Manager at the
application stage represents an intended level of digital connectivity
preparedness. The final Digital Connectivity Rating shall be determined
solely on the basis of on-ground assessment conducted during Due Diligence
51Stage–II after completion of construction and implementation of Digital
Connectivity Infrastructure.
xxii. What is the objective of introducing the Optional Digital Connectivity
Audit?
The objective of introducing the Optional Digital Connectivity Audit is to
provide Property Managers with an opportunity to assess the present level of
Digital Connectivity Infrastructure (DCI) in their property for internal
evaluation and improvement purposes, without immediately applying for a
Digital Connectivity Rating under the Regulations. This mechanism is
intended to encourage proactive enhancement of digital connectivity and
wider adoption of best practices, while preserving the integrity of the formal
rating framework.
xxiii. Is the Optional Digital Connectivity Audit mandatory before applying for a
Digital Connectivity Rating?
No. Participation in an Optional Digital Connectivity Audit is entirely
voluntary. It is not a prerequisite for applying for a Digital Connectivity
Rating and shall have no bearing on the outcome of any rating assessment
conducted under the Regulations.
xxiv. Does the Optional Digital Connectivity Audit result in a rating or certificate
under the Regulation?
No. The Optional Digital Connectivity Audit does not constitute a Digital
Connectivity Rating, provisional rating, interim rating, or certification under
the Regulations. It is conducted outside the formal rating framework and is
intended solely for internal use by the Property Manager.
xxv. What is the role of the Rating platform in the Optional Digital Connectivity
Audit?
The Rating Platform facilitates only the initiation of the audit request and
enables status tracking for transparency in timelines. The platform does not
52evaluate, validate, review, or endorse the audit findings. The audit
engagement, scope, timelines, and fee structure are mutually agreed between
the Property Manager and the selected DCRA.
xxvi. Can the indicative score or indicative star level mentioned in the audit report
be used for marketing or public communication?
No. Any indicative score or indicative star level provided in the audit report
is non-binding and intended solely for internal reference. It shall not be
represented as a Digital Connectivity Rating under the Regulations and shall
not be used in marketing, promotional materials, or public communication as
an official rating.”
(c) In Section 11.5. Template for declaration of maximum chargeable fee by
DCRA (As per regulation), following shall be the amendments:
(iv) At serial number 3. Commercial Establishments, properties in “Type of
Property” column shall be substituted as “Commercial office complex,
shopping malls, industrial estates, SEZs, convention centres, Hospitals, Hotels,
Educational Institutions, etc.”
(v) At serial number 4. Other private or public areas, properties in “Type of
Property” column shall be substituted as “Airport, Bus Station, Railway
Station, multi-modal logistic parks, etc.”
(vi) At serial number 6. Transport corridors, properties in “Type of Property”
column shall be substituted as “Expressways, Highways, Railways routes,
Metro corridors etc.”
***
53Annexure-I
Template for submitting Comments or Feedback
[Comments on each regulation or any other aspect of the Rating of Properties for Digital
Connectivity Regulations, 2024 or rating manual may be stated in a fresh row. Comments
should include justification and, wherever applicable, suggestions for modified or
additional wordings.]
Name of the Commentator/ Organization: ____________________________
S. Regulation No./ Comments/ Justification for Comments/
No. Rating Manual Suggested modified Suggestions
reference / Subject wordings
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
NOTE:
1. Stakeholders may insert additional rows, as required.
2. Where a comment does not pertain to a specific regulation number or specific reference
of rating manual, stakeholders may indicate the relevant subject, provision, or
general comment in the “Regulation No./ Subject” column.
3. Stakeholders are encouraged to provide clear justification and, wherever feasible,
suggested revised wording to facilitate examination of the comments.
***
54Annexure-II
Draft Regulation with Amendments
The draft regulation with amendments is as follows with amendments highlighted in yellow
colour for consultation.
----------------------------------------------***-------------------------------------------------------------
TO BE PUBLISHED IN THE GAZETTE OF INDIA
EXTRAORDINARY PART III SECTION
TELECOM REGULATORY AUTHORITY OF INDIA
NOTIFICATION
NEW DELHI, the Date XX Month, 2026
F. No C-2/3/(2)/2021-QoS: In exercise of the powers conferred by section 36, read with sub-clauses (i) and (v) of clause (b),
clause (c) and clause (d) of sub-section (1) of section 11, of the Telecom Regulatory Authority of India Act, 1997 (24 of 1997),
the Telecom Regulatory Authority of India hereby makes the following regulations, namely:-
RATING OF PROPERTIES FOR DIGITAL CONNECTIVITY
REGULATIONS, 2024 ( xx of 2026 )
SECTION-I
PRELIMINARY
1. Short title, extent and commencement.— (1) These regulations may be called the Rating of Properties for Digital
Connectivity Regulations, 2024.
(2) These regulations shall apply to -
(i) property managers who intend to get their property, of minimum specified size, rated for digital connectivity,
either voluntarily or under the provisions of applicable laws, rules or regulations;
(ii) digital connectivity rating agencies, who may evaluate and award ratings for property under these regulations;
and
(iii) the service providers, who may enter into an arrangement with the property manager for development or access
of digital connectivity or digital connectivity infrastructure.
(3) They shall come into force from XX.YY.2026.
2. Definitions. — (1) In these regulations, unless the context otherwise requires, --
(a) “Act” means the Telecom Regulatory Authority of India Act, 1997 (24 of 1997);
(b) “Authority” means the Telecom Regulatory Authority of India established under sub- section (1) of section 3 of the
Telecom Regulatory Authority of India Act, 1997;
55(c) “digital connectivity” means the connectivity made available to the users to deliver telecommunication services using
wireless or wireline medium;
(d) “digital connectivity infrastructure” or “DCI” means passive and active elements, which include any apparatus,
appliance, instrument, equipment and system used or capable of extending seamless digital connectivity:
Explanation: All infrastructure required for establishing Wireless or Wireline Access Networks such as Radio Access
Networks (RAN) and Wi-Fi systems, and Transmission Links Interface, Duct Space, Optical Fiber, Poles, Towers,
Feeder cable, Antenna, Base Station, In-Building Solutions (IBS), Distributed Antenna System (DAS), or any other
equipment to be used for the provision of digital connectivity, may be part of DCI, however, it shall not include
core network elements;
(e) “digital connectivity rating agency” or “DCRA” means an eligible entity duly empaneled with the Authority on rating
platform for rating of properties for digital connectivity under these regulations;
(f) “entity” means a company registered under the Companies Act, 2013 (18 of 2013) or a registered LLP firm;
(g) "person" means an individual, any company or association or body of individuals, whether incorporated or not, by
whatsoever name called or referred to;
(h) “property” means the properties provided under regulation 3 and includes buildings and their surroundings and areas
under construction;
(i) “property manager” means the person who is either the owner of the property to be rated for digital connectivity or
has any legal right to control or manage the property;
(j) “public Wi-Fi network” means family of wireless network protocols commonly used for extending wireless internet
access to general public in a property;
(k) “Quality of Service” or “QoS” means main indicator of the performance of a telecommunication network and the degree
to which such network conforms to the standards of such quality of service as specified in the applicable regulations;
(l) “rating” means rating of digital connectivity in the property as assigned by DCRA and expressed in the form of
specified symbols, as provided in these regulations;
(m) “regulations” means the Rating of Properties for Digital Connectivity Regulations, 2024;
(n) “rating platform" means the information technology system and associated applications set up or authorized by the
Authority for the purpose of managing rating of properties for digital connectivity as per provisions of the regulations:
Note:- The Authority shall notify the date on which the rating platform shall be made live. Further, the Authority may,
till the development of online rating platform, provide an alternate mechanism for rating of property;
(o) “schedule” means the schedules appended to the regulations;
(p) “service provider” means any service provider licensed under section 4 of the Indian Telegraph Act, 1885 or granted
authorization under the Telecommunications Act, 2023, to provide telecommunication service;
(q) “telecommunication network” means telecommunication network as defined in the Telecommunications Act, 2023;
(r) “telecommunication service” means telecommunication service as defined in the Telecommunications Act, 2023;
(2) Words and expressions used in these regulations but not defined in the regulations, but defined in the Act or the rules
and other regulations made thereunder or in the Telecommunications Act, 2023 or in the license or authorization
granted thereunder, shall have the meanings respectively assigned to them in the Act, or the rules or the regulation or
the Telecommunications Act, 2023 or in the license or authorization granted under relevant Act, as the case may be.
56SECTION II
CLASSIFICATION OF PROPERTIES FOR RATING
3. Categories of properties for evaluation and assessment of digital connectivity.– (1) The properties shall, for the
purpose of rating for digital connectivity, be classified under the following categories:-
Sl. No. Classification Category Type of Property
1. Residential A Apartments, independent houses, gated communities
or societies, etc.
2. Government Properties A All properties of the Central Government, the State
Government, Courts, Public Sector Undertakings,
Local Bodies, Heritage Sites, etc.
3. Commercial A Commercial office complex, shopping malls,
Establishments industrial estates, SEZs, convention centres,
Hospitals, Hotels, Educational Institutions, etc.
4. Other private or public B Airport, Bus Station, Railway Station, multi-modal
areas logistic parks, etc.
5. Stadiums or Sport Arenas B Stadiums or permanent spaces of gathering with
or spaces of frequent seating capacity of more than 5000 persons
gathering
6. Transport corridors B Expressways, Highways, Railways routes, Metro
corridors etc.
SECTION III
REGISTRATION OF DIGITAL CONNECTIVITY RATING AGENCY
4. Application for registration.– (1) Any entity, fulfilling the eligibility criteria under regulation 5 and intending to commence
activity as DCRA under these regulations, shall make an application to the Authority for grant of registration on the rating
platform in the manner and format, and upon payment of such fee, as may be specified by the Authority.
(2) An application for registration, which is not complete in all respects or does not conform to the eligibility criteria
specified under regulation 5 or the instructions specified by the Authority from time to time, shall be rejected:
Provided that before rejecting any such application, the applicant shall be given an opportunity to rectify the
deficiency, if any, within thirty days from the date of receipt of communication from the Authority:
Provided further that the Authority may, for sufficient reasons, extend the time for rectification of the
deficiency by such time as it may consider appropriate, but such extended time shall not exceed thirty days.
(3) The Authority may, if it so desires, ask the applicant to appear before it, in person, in connection with the grant of
registration.
5. Eligibility Criteria.– (1) An entity shall be eligible for registration as DCRA with the Authority under regulation 4, if it
-
57a) is registered as a company under the Companies Act, 2013 (18 of 2013) or is a registered LLP firm;
b) has minimum two years’ experience in setting up in-building solutions or assessment of quality of service of
telecommunication networks or installation or maintenance of telecommunication networks;
c) has, in its employment persons having adequate professional experience in telecom, civil and electrical domain, to
the satisfaction of the Authority, to meet obligations under the regulations and the rating framework;
d) has valid ISO certified quality management system in its organization or submits an undertaking to get it within one year
of the grant of registration.
6. Grant of registration and listing on rating platform.– (1) The Authority shall, on being satisfied that the applicant meets
the eligibility criteria under regulation 5, grant registration to the applicant on the rating platform for a period of five
years.
(2) The registration granted under sub-regulation (1) shall be subject to payment of such fees and such terms and
conditions, as may be specified by the Authority from time to time, by an order or direction.
(3) The registration granted under sub-regulation (1) shall be valid for the specified period unless it is suspended or
cancelled by the Authority as per provisions of these regulations, or upon approval of the request of DCRA for
withdrawal of its registration by the Authority, and such registration shall not confer any right upon the DCRA for
assignment of work for rating of property.
(4) The Authority may, upon the request of DCRA and on being satisfied with its performance, subject to the DCRA
meeting the eligibility criteria, renew the registration of DCRA for another five years:
Provided that the DCRA shall, in case of non-renewal of its registration by the Authority, continue to
discharge its obligations under the regulations for the remaining validity period of its registration.
(5) If the applicant or DCRA submits information which is found to be false or misleading at any stage, either prior to the
registration or during the validity of the registration, the Authority shall, without prejudice to its rights under any law,
Act or regulations, reject the application for registration or cancel or suspend the registration of DCRA:
Provided that no order for cancellation or suspension of registration shall be made by the Authority unless
DCRA has been given a reasonable opportunity of representing against such cancellation or suspension by the
Authority.
7. Conditions of registration of DCRA. – (1) The registration of DCRA shall be subject to the following conditions,
namely:-
(i) DCRA shall comply with the provisions of the regulations and the guidelines, orders, directions and instructions
issued thereunder by the Authority, from time to time.
(ii) where any information or particulars furnished to the Authority by DCRA has undergone change subsequent to
submission of the application for registration or grant of registration, DCRA shall inform the Authority of such
change within a period of sixty days;
(iii) where DCRA proposes change in its management, it shall provide prior intimation to the Authority, at least fifteen
days prior to the date of effect of such change, demonstrating its capability and commitment to continue to work as
DCRA, failing which the registration of DCRA may be cancelled.
(iv) DCRA shall continue to have a valid ISO certificate for quality management and have adequate number of
professionals with experience in telecom, civil and electrical domain to meet the obligations under the regulations.
58SECTION IV
GENERAL OBLIGATIONS OF DIGITAL CONNECTIVITY RATING AGENCY
8. Code of Conduct.– Every DCRA shall abide by the Code of Conduct contained in Schedule-I to these regulations.
9. Disclosure of fees and other terms and conditions to the property manager.– (1)Every DCRA shall disclose the fee
to be charged and other terms and conditions, if any, to the property manager and get their acceptance before
commencement of any rating activity.
(2) The fees charged by DCRA shall be based on the category and classification of properties as provided in regulation
3, the responsibility of DCRA under the provisions of these regulations, the complexity involved, the area of the
property, etc.
(3) DCRA shall offer suitable fee terms to the property manager, in a transparent manner, based on its obligations for
the rating of the property.
10. Evaluation and award of ratings.– (1) Every DCRA shall comply with the rating criteria, process for evaluation and
award of ratings as provided in these regulations or the orders, directions or guidelines issued by the Authority from time to
time.
(2) No DCRA shall undertake evaluation and rating of any property which may result in potential conflict of interest
with property owners or property manager, infrastructure providers, or service providers, which may directly or
indirectly affect the transparency of the rating process.
11. Monitoring of ratings.– (1) Every DCRA shall monitor feedback or complaints received from service providers or end users
during the validity of the rating certificate of the properties, as received through the rating platform, concerning the ratings
awarded by DCRA.
(2) Every DCRA shall examine feedback or complaints received under sub-regulation (1) and evaluate the need for
either review of rating awarded or corrective actions required by the property manager and take follow up action with
the property manager, if required, for resolving such identified issues.
12. Retention of records and audit of DCRA.– (1) Every DCRA shall preserve the records, in digital form, pertaining to
the evaluation and assessment of digital connectivity and award of ratings, during the validity period of the ratings and
provide the same to the Authority, as and when the Authority may direct.
(2) The Authority may, if it considers expedient so to do and to ensure compliance of the provisions of these regulations,
direct any of its officers or appoint an auditor from the panel of auditors as may be notified by the Authority under
sub-regulation (3), to undertake verification or audit, which may include inspection of the records maintained by the
DCRA.
(3) The Authority may, from time to time, notify a panel of auditors to audit the evaluation and assessment of digital
connectivity and award of ratings by DCRA to ensure compliance of these regulations.
(4) DCRA shall cooperate with the auditor and provide all relevant records sought by the auditor.
(5) The Authority may specify the objective criteria and the frequency for the audit, by an order or direction, from time
to time. The results of such audits may be published on the rating platform.
59SECTION V
GENERAL OBLIGATIONS OF PROPERTY MANAGER
13. Registration on rating platform.– (1) Any property manager, who intends to apply for rating of their property for digital
connectivity under these regulations, shall register himself on the rating platform, in such manner and format and upon
payment of such fees, as may be specified by the Authority.
(2) No property manager, who is not registered on the rating platform, shall be eligible to apply for the rating of property
being used, controlled or managed by him, in accordance with the provisions of these regulations.
(3) The fees for rating of property shall be mutually decided by DCRA and the property manager as provided under
regulation 9.
14. Application for rating of property for digital connectivity. – (1) Every property manager, who intends to get their
property rated for digital connectivity under these regulations, shall apply for such rating on the rating platform, in such
manner and format, as may be specified by the Authority from time to time.
Provided that an application for rating of properties, under construction, shall be accompanied with approved design
documents and other relevant details as may be specified by the Authority.
Provided further that the property manager may also undertake optional digital connectivity audit through the registered
DCRAs without applying for rating for digital connectivity.
(2) If the property manager submits any false or misleading information, undertaking, declaration or documents under
this regulation, it shall amount to the contravention of the provisions of the regulations and the Authority may take
action as per applicable laws, Act or regulations.
15. Facilitation and co-operation during rating process and inspection. – (1) Every property manager shall, during the
evaluation and assessment of the property and the validity of the ratings, co-ordinate and co-operate with DCRA, or the
auditor or such officers as may be appointed by the Authority, and grant access to the property for smooth conduct of
evaluation and assessment as per the provisions of these regulations.
(2) The Authority may, if it considers expedient so to do, appoint its own officers or direct DCRA to inspect the property
which has been rated for digital connectivity under these regulations.
16. Compliance of terms and conditions of rating certificate. – (1) Every property manager shall adhere to the terms and
conditions associated with the ratings awarded to their property, as provided under these regulations and as may be
specified by the Authority, by orders, directions, guidelines or instructions, from time to time.
17. Compliance to approved DCI design. – (1) Every property manager shall comply with the approved design for
implementation of DCI during the construction stage and shall not make any change without the prior approval of the
agency which has granted such approval.
18. Repair and maintenance of DCI. – (1) Every property manager shall properly maintain digital connectivity infrastructure
and the related documents, including design, approval, etc., during the validity of ratings.
(2) Every property manager shall, on the feedback of concerned DCRA or complaints received from end users or from
the service providers, review and take remedial action in the manner and within such time period, as may be specified
by the Authority.
19. Renewal of ratings. – (1) A property manager who intends to renew the rating of the property owned, controlled or
60managed by him shall apply for renewal of ratings, on the rating platform, at least one hundred and twenty days prior to
the expiry of validity of ratings.
20. No exclusive arrangement with the service providers. – (1) No property manager shall enter into an exclusive
arrangement or tie-up arrangements with any service provider for providing access to its digital connectivity infrastructure
in their property.
21. Fair use of ratings.– (1) The property manager shall only use the ratings in a fair, legal and transparent manner and
comply with the terms and conditions specified in Schedule-II to these regulations.
(2) The property manager shall display only the latest rating awarded to the property on its website, advertisement, or
marketing campaigns, etc.
(3) The property manager shall disclose, suo moto or on demand, the ratings of digital connectivity infrastructure to the
concerned stakeholders, including potential tenants, residents, or investors, etc.
22. Change of property manager or ownership and continuity of DCI.- (1) The property manager shall inform the
Authority, about change of property manager or ownership, within thirty days of such change, on the rating platform, in
such manner and format as the Authority may specify.
(2) In case of change of property manager, the property manager shall ensure smooth transfer of digital connectivity
infrastructure to the new property manager for continuity of digital connectivity till the validity of the rating
certificate awarded in respect of the property, and may include suitable provisions in the agreement to ensure
compliance of the provisions of the regulations and terms and conditions of the rating certificate, post transfer of the
property, failing which the ratings awarded to the property may be suspended or withdrawn by the Authority.
(3) The failure of the property manager to intimate the change under sub-regulation (1) to the Authority shall be
considered as contravention of the regulations.
SECTION VI
GENERAL OBLIGATIONS OF SERVICE PROVIDERS
23. No exclusive arrangement with Property Manager for digital connectivity.– (1) No service provider shall enter into
an exclusive arrangement or tie-up arrangement with any property manager for development or access of digital
connectivity or digital connectivity infrastructure in their property.
SECTION VII
RATING CRITERA AND PROCESS FOR EVALUATION OF DIGITAL CONNECTIVITY AND AWARD OF
RATINGS
24. Rating criteria for evaluation of digital connectivity in category ‘A’ property.- (1) DCRA shall evaluate category
‘A’ property as per the following criteria, weightage and sub-criteria:-
61Sl. No. Criteria Weightage Sub-Criteria
Compliance to applicable
1 5 1.1 Approved DCI design
Model Building Bye Laws
(MBBL) and National 1.2 DCI implementation as per approved DCI
Building Code(NBC) for design
digital connectivity
Provision in civil
2 5 2.1 Provision for expansion of telecom rooms
infrastructure, over and
and cable pathways
above MBBL and NBC
requirements, for ensuring 2.2 Provision for expansion of mobile and
robust digital connectivity wireline connectivity
2.3 Ease of access of DCI installed for repair or
maintenance
3 Provision in power 5 3.1 Redundancy of power source
infrastructure, over and 3.2 UPS power backup for DCI
above MBBL or NBC
3.3 Power continuity monitoring
requirements, for ensuring
reliable digital 3.4 Building Management System
connectivity
4 Digital Connectivity 10 4.1 Availability of alternate entry paths for
digital connectivity infrastructure
Infrastructure Resilience
4.2 Non-flooding measures for DCI installation
4.3 Implementation of redundancy in power
source and DCI paths
5 Future Readiness of 10 5.1 Availability of the latest generation of
mobile connectivity
Digital Connectivity
Infrastructure 5.2 Support for future bands
5.3 Upgradability of wireline DCI
6 Provision of Wired 20 6.1 Backhaul fibre connectivity (service provider
to property)
Connectivity
infrastructure 6.2 Fibre connectivity till user premises
6.3 Fibre connectivity in each room or office or
commercial space
7 Availability of Service 15 7.1 Number of wireline Internet Service
providers having integration with Digital
Providers
Connectivity Infrastructure
7.2 Number of Mobile Service providers having
coverage or integration with Digital
Connectivity Infrastructure
8 Service Performance 25 8.1 Mobile network coverage and performance in
public areas of property
8.2 Secure public Wi-Fi network coverage and
performance in public areas of property
62Sl. No. Criteria Weightage Sub-Criteria
8.3 Mobile network coverage and performance in
non-public areas
8.4 Secure public Wi-Fi network coverage and
performance in non-public areas
8.5 Average download speed of different wireline
network(s) in respective highest speed plan
9 User Experience 5 User feedback on digital connectivity experience
Note: (i) In case of new property, where actual end users are yet to use services, the weightage against ‘user experience’
shall be merged with ‘Service Performance’.
(ii) For the purposes of rating for digital connectivity, MBBL issued by Ministry of Housing and Urban Affairs (MoHUA)
shall be referred in cases where Building Byelaws of Cities/State or Union Territory do not have provisions for digital
connectivity infrastructure.
(2) The Authority may, by order, direction or guidelines, specify the weightage against each sub-criteria provided under
sub-regulation (1) from time to time.
25. Rating criteria for evaluation of digital connectivity in category ‘B’ property. - (1) DCRA shall evaluate category
‘B’ property as per the following criteria, weightage and sub-criteria:-
Sl. No. Criteria Weightage Sub-Criteria
1 Provision in power 10 1.1 Redundancy of power source
infrastructure for ensuring 1.2 UPS Power backup for DCI
1.3 Power continuity monitoring
reliable digital
1.4 Building Management System
connectivity
2 Digital Connectivity 10 2.1 Availability of alternate entry paths for
Infrastructure Resilience digital connectivity infrastructure
2.2 non-flooding measures for DCI installation
2.3 Implementation of redundancy in power
source and DCI paths
3 Future Readiness of Digital 10 3.1 Availability of latest generation of mobile
Connectivity Infrastructure connectivity
3.2 Support for future bands
3.3 Upgradability of wireline DCI
4 Provision of Wired 20 4.1 Backhaul fibre connectivity (service
Connectivity infrastructure provider to property)
4.2 Fibre connectivity till user premises
4.3 Fibre connectivity in each room or office or
commercial space
635 Availability of Service 15 5.1 Number of wireline Internet Service
Providers providers having integration with Digital
Connectivity Infrastructure
5.2 Number of Mobile Service providers
having coverage or integration with Digital
Connectivity Infrastructure
6 Service Performance 25 6.1 Mobile network coverage and performance
in public areas of property
6.2 Secure public Wi-Fi network coverage and
performance in public areas of property
6.3 Mobile network coverage and performance
in non-public areas
6.4 Secure public Wi-Fi network coverage and
performance in non-public areas
6.5 Average download speed of different
wireline network(s) in respective highest
speed plan
7 User Experience 10 User feedback on digital connectivity
experience
(2) The Authority may, by order, direction or guidelines, specify the weightage against each sub-criteria provided under
sub-regulation (1) from time to time.
26. Evaluation, assessment and award of rating.– (1) The rating process shall be implemented through the rating platform
only.
(2) DCRA shall evaluate the property and assign scores, on the rating platform, against each rating criteria and sub-
criteria, as provided under Regulation 24 or Regulation 25, as the case may be, and award rating as under:-
S. Digital Connectivity Rating to be
Score Range
No awarded
1 >=25-32
2 >32-40
3 >40-48
4 >48-56
5 >56-64
6 >64-72
7 >72-80
8 >80-88
9 More than 88
64(3) DCRA shall update the rating awarded to the property on the rating platform and issue the rating certificate through
the rating platform, which shall be digitally signed by the DCRA.
(4) The rating certificates may be downloaded by the property manager through the rating platform.
(5) The ratings awarded for different properties shall also be available on rating platform for viewing by end users and
public.
(6) The Authority may specify the manner and process of evaluation and assessment of digital connectivity for award
of ratings to the property, including the timelines, from time to time.
27. Appeal against ratings awarded.– (1) In case the property manager is not satisfied with the ratings awarded to their
property, the property manager may file an appeal on the rating platform, in the manner and format specified by the
Authority, within thirty days of issue of the rating certificate.
(2) Upon receipt of appeal, the concerned DCRA shall review and decide the appeal within sixty days, as per the process
specified by the Authority.
(3) In case the property manager is still not satisfied with the ratings awarded by DCRA, he may prefer an appeal before
the Authority, in the manner and format and upon payment of such fee, as may be specified by the Authority, within
thirty days of the decision of DCRA on the appeal under sub-regulation (1).
(4) The Authority may, if it considers expedient so to do, refer such appeals to another DCRA, or a panel of experts for
examination of the appeal and recommendation thereon.
(5) No appeal shall be entertained after expiry of the period for filing of the appeal as provided under this regulation.
28. Review of ratings.– (1) DCRA may review the ratings awarded, based on the feedback of the consumer or service
provider or on complaints, and modify the ratings based on such review, if required:
Provided that DCRA shall not modify the ratings awarded to the property unless the property manager has been given an
opportunity to remove such defects or deficiencies and resolve complaints, within ninety days of the date of receipt of
communication from DCRA through the rating platform.
29. Re-rating of property within the validity of the rating certificate.– (1) The property manager shall be eligible to apply
for re-rating of the property during validity period of rating certificate, after paying applicable fees to DCRA, in case:-
a) DCI has been fully upgraded;
b) there has been a change or upgradation in the implemented technology leading to demand for re-rating by their end
users;
c) of any change which may affect the rating as per the criteria specified in these regulations.
30. Validity period of ratings.– (1) The Authority may, by order, direction or guidelines, specify the validity period of the
rating:
Provided that the Authority may specify different validity periods for different categories of properties.
SECTION VIII
CONSEQUENCES FOR CONTRAVENTION OF THE REGULATIONS
31. Consequences for the failure of DCRA to comply with the provisions of the regulations or orders or directions or
guidelines.– (1) If any DCRA fails to comply with the provisions of the regulations, or the orders, directions or guidelines
issued thereunder, it shall, without prejudice to the terms and conditions of its registration and listing on rating platform,
be liable for suspension or cancellation of registration and shall be barred from undertaking rating of new properties under
65these regulations, or de-listed from the rating platform, or blacklisted for a specified period, or any combination thereof,
as the Authority may, by order, direct:
Provided that no order for suspension or cancellation of registration or de-listing on rating platform or
blacklisting, as the case may be, shall be made by the Authority unless DCRA has been given a reasonable opportunity of
representing against the contravention of the regulations, or orders, directions or guidelines issued thereunder.
32. Consequences for the failure of property manager to comply with the provisions of the regulations or orders or
directions or guidelines.– (1) If any property manager fails to comply with the provisions of the regulations, or orders or
directions or guidelines issued thereunder, it shall, without prejudice to the terms and conditions of its registration on
rating platform and ratings issued to its properties, be liable for withdrawal of one or more ratings already awarded or in-
process, as the Authority may direct:
Provided that no action for withdrawal of ratings shall be made by the Authority unless the property manager has been
given a reasonable opportunity of representing against the contravention of the regulations or orders or directions or
guidelines, observed by the Authority.
SECTION IX
MISCELLANEOUS
33. Review.— The provisions of these regulations may be reviewed by the Authority from time to time.
34. Interpretation. — In case of any doubt regarding interpretation of any of the provisions of these regulations, the decision
of the Authority shall be final and binding.
Secretary, TRAI
66SCHEDULE-I
Code of Conduct for DCRAs
DCRA shall follow the code of conduct specified hereunder: -
(i) Impartiality and independence: DCRA shall remain impartial and independent during digital connectivity assessment
and entire rating process. DCRA should not have any financial interest or ownership or operational interests in the
property under evaluation and assessment. To avoid any conflict of interest, any DCRA providing DCI services shall
not undertake digital connectivity assessment of properties where another DCRA has provided DCI services. DCRA
shall establish policy and procedures for reviewing the work of its agents/employees to ensure independence of
evaluation and assessment without external influences.
(ii) Transparency and disclosure: DCRAs shall maintain documented process for evaluation and assessment of digital
connectivity as specified by the Authority and disclose all relevant information about their evaluation and assessment
methodologies. DCRA shall maintain verifiable historical information, in electronic form, about ratings awarded by it
during the validity of ratings.
(iii) Compliance with regulations: DCRAs shall strictly adhere to the regulations, guidelines, and standards set forth by the
Authority for the digital connectivity rating system.
(iv) Data privacy and security: DCRAs shall implement robust data privacy and security measures to protect sensitive
information collected during digital connectivity assessments and comply with all relevant data privacy regulations.
(v) Qualified personnel: DCRAs shall employ qualified and certified professionals with the necessary expertise and
experience to conduct digital connectivity assessment as per the provisions of the regulations. DCRA shall ensure regular
training and upskilling of its concerned employees to account for technological upgradations.
(vi) Fair and non-discriminatory practices: DCRAs shall ensure that the process for evaluation and assessment of the
property and award of rating is fair, transparent and non-discriminatory. The DCRAs shall also ensure that the fees
charged by them are fair and without discrimination to any property managers regardless of the type of property or
ownership.
(vii) Clear fee structure: DCRAs shall establish a clear and transparent fee structure for different categories of properties
as per regulations. Maximum chargeable fees (MCF) should be commensurate with the scope of work, and not excessive.
MCF should be based on the complexity and size of the property. The broad fee structure and criteria shall be displayed
on the rating platform to all relevant stakeholders.
(viii) Conflict resolution mechanism: DCRAs shall establish a transparent mechanism for addressing conflicts and disputes
with property managers. This mechanism should ensure a fair and unbiased resolution of issues.
(ix) Compliance with building Bye-Laws: DCRAs shall ensure that their assessments align with the building bye-laws and
other relevant regulations.
(x) Continuous improvement: DCRAs shall commit to ongoing improvements in their assessment methodologies by
staying updated with technological advancements and adapting to industry best practices.
(xi) Conflict of interest: DCRA shall not rate a property that has a stake in the DCRA or its associated business. DCRA
shall not undertake evaluation, assessment and rating of any property which may result in potential conflict of interest
with property owners or property manager, infrastructure providers, or service providers, which may directly or
indirectly affect the transparency of the rating process.
(xii) Review of ratings: DCRA shall institute a formal system of any review of ratings under provisions of regulations. The
review shall not be taken up by the same personnel involved in initial ratings.
(xiii) Ethical marketing and advertising: DCRA shall not use any unethical means for marketing and shall not misrepresent
its role or capabilities.
67SCHEDULE-II
Terms and conditions for fair use of rating and rating certificate
(i) Ratings are non-transferable: The ratings are awarded to specific property and are non-transferable. Therefore, the
ratings shall only be used for the specific property to which it has been awarded.
(ii) Use in marketing and promotion: The property managers can use the awarded ratings in their marketing and
promotional materials, including brochures, websites, and advertisements. However, the ratings shall be used accurately
and in a non-misleading manner.
(iii) Non-alteration: The property managers shall not alter or represent the rating certificates in any way that could be
misleading in any manner whatsoever.
(iv) Periodic updates: The property managers shall always use the valid ratings and update their rating certificates
periodically as and when there is any change.
(v) Disclosure of ratings: The property managers shall either suo moto disclose the ratings to their users/owners/tenants or
provide the details as and when demanded.
(vi) Compliance with regulatory requirements: The property managers should adhere to any regulatory requirements
related to the use of ratings, ensuring that they do not violate any laws or regulations.
(vii) Usage within validity period: The property manager is authorized to use the ratings or rating certificates only during
the validity period of the certificate. Use of ratings or rating certificates after the validity period shall be considered as
misuse of the certificate and be construed as contravention of the regulations.
***
68Annexure-III Draft Rating Manual with Amendments
Table of Contents
1. Introduction ............................................................................................................................................... 74
1.1. Overview .............................................................................................................................................74
1.2. Importance of Digital Connectivity ..........................................................................................74
1.3. Background and Purpose .............................................................................................................75
1.4. Digital Connectivity Rating Framework ................................................................................76
1.5. Objectives of the Rating Manual ...............................................................................................77
1.6. Scope of the Rating Manual.........................................................................................................77
2. Role of Stakeholders ......................................................................................................................... 79
2.1. Digital Connectivity Rating Agency (DCRA) .........................................................................79
2.2. Property Manager (PM) ................................................................................................................80
2.3. Service Providers ............................................................................................................................81
2.4. Digital Connectivity Infrastructure Providers (DCIPs)/Infrastructure Providers
Category 1 (IP-1s) ..........................................................................................................................................82
2.5. Consumers/ End Users .................................................................................................................82
3. Registration Process and Rating Lifecycle ............................................................................... 84
3.1. Eligibility Criteria of Digital Connectivity Rating Agency (DCRA) Registration ...84
3.2. Registration Process of DCRA ....................................................................................................84
3.3. General Obligations for DCRA ...................................................................................................86
3.4. Registration of Property Manager............................................................................................86
3.5. General Obligations for Property Manager ..........................................................................86
3.6. Classification of Properties for Rating ...................................................................................87
3.7. Rating Process for Constructed Properties ..........................................................................88
3.8. Rating Process for Properties Under Construction ..........................................................91
3.9. Optional Digital Connectivity Audit .........................................................................................97
4. Assessment Methodology for Category ‘A’ Properties ....................................................... 100
4.1. Compliance to Applicable Model Building Bye Laws (MBBL) and National
Building Code (NBC) for Digital Connectivity.................................................................................104
4.2. Provision in Civil Infrastructure, over and above MBBL and NBC requirements,
for Ensuring Robust Digital Connectivity .........................................................................................108
4.3. Provision in Power Infrastructure, over and above MBBL or NBC requirements,
for Ensuring Reliable Digital Connectivity.......................................................................................113
4.4. Digital Connectivity Infrastructure Resilience .................................................................119
694.5. Future Readiness of Digital Connectivity Infrastructure .............................................124
4.6. Provision of Wired Connectivity Infrastructure ..............................................................129
4.7. Availability of Service Providers .............................................................................................134
4.8. Service Performance ....................................................................................................................137
4.9. User Experience .............................................................................................................................149
4.10. Summary of Rating Score ......................................................................................................151
5. Assessment Methodology for Category ‘B’ Properties ....................................................... 155
5.1. Provision in Power Infrastructure for Ensuring Reliable Digital Connectivity ..157
5.2. Digital Connectivity Infrastructure Resilience .................................................................162
5.3. Future Readiness of Digital Connectivity Infrastructure .............................................167
5.4. Provision of Wired Connectivity Infrastructure ..............................................................172
5.5. Availability of Service Providers .............................................................................................177
5.6. Service Performance ....................................................................................................................180
5.7. User Experience .............................................................................................................................192
5.8. Summary of Rating Score ..........................................................................................................194
6. Award of Rating and Renewal ..................................................................................................... 197
6.1. Classification of Ratings .............................................................................................................197
6.2. Validity Period of Ratings ..........................................................................................................198
6.3. Reassessment Process .................................................................................................................198
6.4. Renewal Process ............................................................................................................................199
7. Reporting and Feedback Mechanism ............................................................................................ 201
7.1. Monitoring and Reporting Mechanism ................................................................................201
7.2. Mechanism for Stakeholder Feedback .................................................................................201
7.3. Addressing Non-Compliance ....................................................................................................202
8. Appeal Process ................................................................................................................................... 203
8.1. Filing of Appeal by Property Manager ..................................................................................203
8.2. Review of Appeal by DCRA ........................................................................................................203
8.3. Escalation of Appeal to the Authority ...................................................................................204
8.4. Examination of Appeal by Authority .....................................................................................204
9. Review and Updates of Rating Manual .................................................................................... 205
9.1. Process for Periodic Updates ...................................................................................................205
10. Best Practices for Digital Connectivity in Properties ......................................................... 206
10.1. Best Practices for Digital Connectivity .............................................................................206
7010.2. Integration of Connectivity Infrastructure in Design and Construction ...........209
10.3. Collaboration with stakeholders ........................................................................................209
11. Appendix .............................................................................................................................................. 211
11.1. Frequently Asked Questions (FAQ) .......................................................................................211
11.2. List of Applicable Standards and References ....................................................................217
11.3. Documents Checklist ...................................................................................................................217
11.4. User Feedback Form ................................................................................................................225
11.5. Template for declaration of maximum chargeable fee by DCRA (As per
regulation) .....................................................................................................................................................226
71Abbreviations
Acronyms Description
AI Artificial Intelligence
AR Augmented Reality
BIS Bureau of Indian Standards
BMS Building Management System
BoM Bill of Material
BW Bandwidth
CSSR Call Setup Success Rate
DAS Distributed Antenna System
DCI Digital Connectivity Infrastructure
DCIP Digital Connectivity Infrastructure Provider
DCRA Digital Connectivity Rating Agency
DTH Direct to Home
DWDM Dense Wavelength Division Multiplexing
Gbps Gigabits per Second
HVAC Heating, Ventilation, and Air Conditioning
ICT Information and Communications Technology
IoT Internet of Things
IBS In-Building Solutions
IP Infrastructure Provider
IPv6 Internet Protocol version 6
ISP Internet Service Provider
KPI Key Performance Indicator
M2M Machine to Machine Communication
MBBL Model Building Bye-Laws
72Acronyms Description
Mbps Megabits per Second
MCF Maximum Chargeable Fee
Mn Million
MoHUA Ministry of Housing and Urban Affairs
MoS Mean Opinion Score
NBC National Building Code
NDCP National Digital Communication Policy
PM Property Manager
PON Passive Optical Network
QoE Quality of Experience
QoS Quality of Service
RF Radio Frequency
RRU Remote Radio Unit
RSRP Reference Signal Received Power
SON Self-Optimizing Networks
TEC Telecom Engineering Center
TRAI Telecom Regulatory Authority of India
TSP Telecom Service Provider
UPS Uninterrupted Power Supply
URIN Unique Request Identification Number
VoLTE Voice over Long-Term Evolution
VoNR Voice over New Radio
VR Virtual Reality
WFA Work From Anywhere
WPA Wi-Fi Protected Access
731. Introduction
1.1. Overview
Internet access serves as a critical enabler, connecting individuals and businesses to
governments, markets, and a wide range of economic and social opportunities. Digital
services, including e-payments, e-commerce, and e-identification, are revolutionizing
business models across sectors such as financial services, healthcare, and education, while
also transforming the delivery and consumption of goods throughout the broader economy.
Emerging technologies like Internet of Things (IoT) and Artificial Intelligence (AI) have the
potential to further accelerate the growth of the digital economy. In emerging markets, digital
connectivity has been a significant driver of development over the past two decades, fostering
economic growth, job creation, and poverty reduction. By expanding markets, improving
efficiency in both business and government operations, and driving innovation in traditional
sectors, digital technologies are unlocking new opportunities for inclusive development.
However, the benefits of digital connectivity cannot be fully realized without universal access
to the Internet. Significant progress has been made over the past two decades to increase the
reach of telecommunication networks, with 95 percent of the world population covered by a
mobile broadband network1.
1.2. Importance of Digital Connectivity
The development of resilient, world-class infrastructure—physical, social, financial, and
digital—forms a cornerstone of India’s strategy to achieve the vision of Viksit Bharat @ 2047.
Among these, digital infrastructure has emerged as a critical necessity, often rivaling
traditional infrastructure components such as power, water, and transportation. The COVID-
19 pandemic not only reshaped the global order but also accelerated the expansion of digital
infrastructure worldwide. Comprising the physical resources and systems required to process
and utilize data effectively; digital infrastructure has become essential to societal functioning
and quality of life. As nations aim to make their digital systems more resilient, agile, and
forward-looking, India, with its vast population and technological potential, is well-
positioned to assume a leadership role in shaping the future global digital landscape.
The rapid advancement of technologies such as 4G and 5G, coupled with enabling devices
and software applications, has profoundly transformed both personal and professional lives
while reshaping governance and business models globally. Today, individuals across all age
groups increasingly rely on smart devices for activities such as studying, working, and
entertainment. The availability of online services, including banking, e-commerce, citizen-
centric solutions, and infotainment options like gaming and social networking, hinges on
robust digital connectivity. In the modern era, it is almost unimaginable to function without
access to these services, emphasizing the critical need for reliable and high-quality digital
connectivity.
1 https://www.itu.int/itu-d/reports/statistics/2023/10/10/ff23-mobile-network-coverage/
74India’s digital transformation holds immense promise, with nearly ~975 Mn internet users
as of 31st May 20252 and a growing ecosystem of indigenous digital services, platforms, and
applications. This digital transformation could unlock significant opportunities for
businesses, startups, and innovators to invest in emerging technologies like AI, blockchain,
and drones tailored to India’s unique needs. However, the rapid adoption of frontier
technologies has placed tremendous pressure on existing digital infrastructure. To harness
the full potential of initiatives such as Smart Cities and Smart Health, focus on augmenting
and modernizing digital infrastructure is essential to sustain this momentum and enable the
seamless integration of advanced technologies into its digital infrastructure.
1.3. Background and Purpose
The purpose of the rating framework is to establish a standardized framework to assess the
availability of digital connectivity infrastructure in different categories of properties and to
encourage the stakeholders to improve the telecom network quality of service in properties.
The aim is to improve consumer experience, ensure seamless digital connectivity, and
promote stakeholder collaboration, making Digital Connectivity Infrastructure (DCI) an
integral part of property development. The quality of telecommunication services inside the
properties is an integral part of protection of consumer interest.
The framework also recognizes the importance of enabling visibility of planned digital
connectivity at the design and construction stages of properties, while ensuring that final
ratings continue to be awarded based on actual on-ground assessment.
To provide legal and regulatory trigger for addressing the issue of accessibility and quality of
digital connectivity inside properties, the Telecom Regulatory Authority of India has
submitted recommendations to the Government on “Recommendations on Rating of
Buildings or Areas for Digital Connectivity” dated 20th February 2023 and regulation on
“Rating of Properties for Digital Connectivity,2024” dated 25th October 2024. The
recommendations and regulations are aimed at creating an ecosystem for co-creations of
Digital Connectivity Infrastructure (DCI) as a part of any development activity, be it a Building
or an Area
The key objectives of regulation on “Rating of Properties for Digital Connectivity,2024”,
hereunder referred as the regulation, includes:
a. To improve consumer experience by ensuring seamless connectivity inside properties
b. To standardize and promote high-quality digital connectivity in residential, commercial,
and public properties
c. To provide a standardized rating system to evaluate properties for their digital
infrastructure and service readiness
d. To provide prospective tenants, owners, and businesses with transparent measure of
quality of property’s digital connectivity
2 https://www.trai.gov.in/sites/default/files/2025-06/PR_No.51of2025_0.pdf
75e. To encourage coordination between property managers, Service Providers, DCIPs to
implement connectivity standards.
The regulation is applicable for:
i. Property managers who intend to get their property, of minimum specified size, rated
for digital connectivity, either voluntarily or under the provisions of applicable laws,
rules or regulations
ii. Digital connectivity rating agencies (DCRA), who may evaluate and award ratings for
property under these regulations; and
iii. Service providers, who may enter an arrangement with the property manager for
development or access of digital connectivity or digital connectivity infrastructure.
1.4. Digital Connectivity Rating Framework
The regulation provides a standardized method to evaluate digital connectivity inside
properties. The ratings, provided under the rating framework under the regulation, will enable
stakeholders to make informed choices while promoting the development of robust digital
infrastructure. The key aspects of rating framework include:
i. Standardized Process
The framework establishes a uniform methodology to assess the digital connectivity of
properties and areas across various categories, ensuring comparability and reliability.
Properties shall be evaluated based on defined parameters in the regulation such as fiber
readiness, mobile network availability, in-building solutions, and Wi-Fi infrastructure.
Different property types (commercial, residential, industrial, public spaces, hospitals,
government offices, transport corridors and many more) may have tailored benchmarks
to ensure relevant and fair assessments. The standardized process also provides for
assessment of digital connectivity at different stages of property development, as specified
in the regulations.
ii. Consistent Quality and Coverage
Integrating Digital Connectivity Infrastructure (DCI) at an early stage in property
development ensures that digital services are of high quality, reducing connectivity gaps
and enhancing user experience. The framework promotes the inclusion of diverse
connectivity options, such as fiber optic networks, Wi-Fi, cellular connectivity, and
satellite broadband, to enhance resilience. Properties will be assessed based on their
capability to provide seamless indoor and outdoor network coverage, including
provisions for small cells, DAS (Distributed Antenna Systems) and Wi-Fi network.
iii. Consumer Empowerment
76A structured rating system enables consumers and stakeholders to make informed
decisions based on digital connectivity performance, driving competitive improvements.
a. Informed decision-making: Prospective tenants and buyers can compare
properties based on their connectivity rating, ensuring they choose locations with the
best digital infrastructure.
b. Market differentiation: Property managers and consumers are incentivized to
enhance their digital infrastructure to achieve higher ratings, improving property
value and marketability.
c. Future readiness: Encourages property managers to adopt emerging technologies
to future-proof their properties.
1.5. Objectives of the Rating Manual
The Rating Manual serves as a structured framework designed to ensure a fair, transparent,
and standardized approach to assessing digital connectivity under the provisions of the
regulation.
1.6. Scope of the Rating Manual
The Rating Manual outlines the detailed methodology to be followed by the stakeholders for
assessment of digital connectivity in different categories of properties as per the assessment
criteria provided in the "Rating of Properties for Digital Connectivity Regulations, 2024". This
document provides a comprehensive guide for all stakeholders involved in implementation
and assessment of digital connectivity in properties and areas, including Digital Connectivity
Rating Agency (DCRA), Property Manager (PM), and Service Providers.
Key aspects of the manual include a detailed description of the overall rating process for
digital connectivity. This process encompasses the registration procedures for DCRAs and
property managers. It also specifies the evaluation methodology tailored for distinct property
classifications provided in the regulation i.e. Category A properties and Category B properties.
The manual also elaborates on the processes for the award and renewal of ratings.
Additionally, it sets forth provisions for a reporting and feedback mechanism, empowering
stakeholders to provide input for maintaining and improving the rating framework. Processes
for dispute resolution are also detailed, offering structured processes to address and resolve
conflicts among stakeholders effectively.
Recognizing the dynamic nature of digital connectivity needs, the manual provides a protocol
for the periodic review and updates of the rating manual. This ensures that the manual
remains relevant in addressing technological advancements, changing user expectations, and
emerging challenges. The manual also includes a chapter dedicated to guidelines and best
practices to be adhered to by property managers and DCRAs, fostering consistency and quality
in the implementation of digital connectivity standards.
77This rating manual provides processes and methodology for assessment of digital connectivity
under the "Rating of Properties for Digital Connectivity Regulations, 2024". In case of any
discrepancy or interpretation, the provision of the regulations shall prevail.
782. Role of Stakeholders
The following sections provide an overview of roles of key stakeholders within the ecosystem
including the digital connectivity rating agency, property manager, service provider, and
digital connectivity infrastructure provider.
2.1. Digital Connectivity Rating Agency (DCRA)
DCRAs play a critical role in evaluating and certifying the quality, reliability, and readiness
of digital connectivity in the properties. The responsibilities of DCRA, as per the regulations,
include:
i. Evaluation of property for digital connectivity: Conduct thorough assessments
of the digital connectivity in properties including fiber-optic availability, mobile
network coverage, Wi-Fi accessibility, and broadband reliability and use established
criteria to evaluate the digital connectivity.
ii. Issuance of ratings: Assign objective and transparent ratings based on the
evaluation results, providing property managers and stakeholders with a clear
indication of connectivity infrastructure and service performance. Generate official
rating certificates that property managers can use to demonstrate their digital
connectivity standards to tenants, investors, and businesses. DCRA ensures that
ratings reflect real-world digital connectivity experiences, helping end-users make
informed decisions about properties based on their digital connectivity requirements
and available performance.
iii. Feedback and recommendations: Provide constructive feedback to property
managers on areas for improvement in their digital connectivity infrastructure or
services and indicate best practices and enhancements to help property managers
achieve higher ratings.
iv. Collaboration with stakeholders: Work closely with property managers, service
providers and infrastructure providers to gather necessary data for evaluations and
maintain communication with TRAI to ensure compliance with regulatory standards.
v. Continuous improvement: Stay updated on technological advancements and
regulatory changes to refine evaluation criteria and participate in training and
workshops to enhance evaluation methodologies. Participate in training programs,
workshops, and knowledge-sharing initiatives to enhance evaluation methodologies
and improve accuracy in assessments.
vi. Reporting: Maintain comprehensive records of all evaluations conducted, ratings
issued, and feedback provided to property managers for different properties. Submit
periodic reports and trend analyses to TRAI, highlighting industry-wide connectivity
performance, key challenges, and areas needing regulatory attention.
79vii. Compliance with Regulations: All the DCRA activities shall be within the
framework of the regulations and directions or orders or guidelines issued from time
to time by the Authority.
In addition to the above, a DCRA may, on a voluntary basis and upon request by a Property
Manager, undertake an Optional Digital Connectivity Audit for internal review and
improvement purposes for a property, outside the formal rating process and without award
of any Digital Connectivity Rating.
2.2. Property Manager (PM)
As defined in the regulations, the “Property Manager” means the person who is either the
owner of the property to be rated for digital connectivity or has any legal right to control or
manage the property. The Property Manager plays a key role in facilitating digital connectivity
assessments, coordinating with relevant authorities, and implementing improvements to
enhance user experience and maintain compliance with regulatory standards. Property
Managers are responsible for overseeing the management and maintenance of properties,
including ensuring adequate digital connectivity. The responsibilities of Property Manager,
under the regulations, inter-alia, include:
i. Application for ratings:
a. Submit applications for digital connectivity ratings through the rating platform
and provide accurate and comprehensive information about the property’s digital
connectivity.
b. Provide accurate and comprehensive information regarding the property’s existing
digital connectivity infrastructure, including network coverage, fiber availability,
and telecom service provider details.
c. Ensure that all submitted data is up to date and reflects the actual service available
on the property.
d. For under-construction properties, the Property Manager shall also submit a
declaration and supporting design-stage documents, as prescribed by the
Authority.
ii. Documentation and compliance:
a. Prepare and upload the necessary documentation required for the evaluation
process and ensure ongoing compliance with standards set by DCRAs and TRAI.
b. Keep track of changes in compliance requirements and implement necessary
updates to avoid penalties or service disruptions.
iii. Maintenance of digital connectivity infrastructure:
80a. Regularly inspect and maintain the digital connectivity infrastructure to ensure
optimal performance and address any connectivity issues promptly to maintain
service quality.
b. Address connectivity issues proactively by working with telecom service providers
and technical support teams.
c. Ensure proper maintenance and upgrades of network equipment to optimize
performance and provide a seamless digital experience for occupants and tenants.
iv. Collaboration with DCRAs:
a. Facilitate the evaluation and rating process by providing Digital Connectivity
Rating Agencies (DCRAs) with necessary access to the property.
b. Work closely with evaluators to share technical data, network reports, and other
relevant details needed for the rating assessment.
c. Implement recommendations and best practices suggested by DCRAs to enhance
the property's digital connectivity rating.
v. Customer communication and tenant engagement:
a. Act as the primary point of contact for tenants and occupants regarding digital
connectivity services within the property.
b. Address concerns or complaints related to network performance and ensure that
users are informed about available connectivity solutions and upgrades.
Educate tenants on digital connectivity features available in the property and
promote initiatives aimed at improving network access and reliability.
A Property Manager may, at its discretion, engage a registered Digital Connectivity Rating
Agency (DCRA) for an Optional Digital Connectivity Audit of the property for the purpose of
identifying gaps and undertaking improvements in Digital Connectivity Infrastructure,
without applying for a Digital Connectivity Rating under the Regulations.
2.3. Service Providers
The Regulation “Rating of Properties for Digital Connectivity Regulations, 2024" defines
Service Providers as “Service Providers means any service provider licensed under section
4 of the Indian Telegraph Act, 1885 or granted authorization under the
Telecommunications Act, 2023, to provide telecommunication service”. Service Providers
are responsible for delivering a wide range of telecommunications and digital services,
including mobile and fixed-line communication, internet access, Wi-Fi, and broadband
services. They serve as the backbone of digital connectivity, ensuring seamless and reliable
communication for end-users. Their role is critical in maintaining and improving the overall
quality of digital services, directly impacting the user experience and the effectiveness of
digital infrastructure. The Service Providers are encouraged to collaborate with the property
managers and DCIPs for extending and maintenance of digital connectivity in the properties.
812.4. Digital Connectivity Infrastructure Providers (DCIPs)/Infrastructure
Providers Category 1 (IP-1s)
DCIPs/IP-1s are entities that develop and maintain the digital infrastructure as per their
authorization. This includes network equipment, cabling, and other technological
frameworks.
DCIPs/IP-1s are key enablers in the telecommunication and digital ecosystem for developing,
deploying, and maintaining the physical and digital infrastructure that supports seamless
digital connectivity services. Their role is vital in ensuring high-speed, reliable, and future-
ready network infrastructure that caters to the growing demands of consumers, businesses,
and service providers.
2.5. Consumers/ End Users
The consumer or end-user is the primary stakeholder in the broader ecosystem for assessing
and rating digital connectivity in properties or specific geographical areas. Their role is
pivotal, as the quality and reliability of connectivity directly impact their daily digital
interactions, productivity, and overall satisfaction.
The fundamental objective of implementing a rating system is to enhance the quality of
service and thereby experience (QoE) for consumers by identifying gaps in connectivity and
encouraging improvements in digital infrastructure. To achieve this, user feedback and real-
world end-user experiences must be integral components of the rating framework, ensuring
that assessments reflect actual usability.
The quality of user experience can be measured objectively through various technical key
performance indicators (KPIs). These include parameters such as network latency, download
and upload speeds, signal strength, coverage consistency, etc. These metrics collectively
define the Quality of Experience (QoE) from a technical standpoint and provide quantifiable
data to assess digital connectivity standards.
On the other hand, subjective evaluation of QoE involves gathering consumer perceptions
through structured methods such as end-user surveys, real-time feedback mechanisms, and
digital reporting platforms. This qualitative input helps capture aspects of user experience
that may not be fully reflected in technical measurements, such as service reliability, ease of
connectivity, and user satisfaction with network performance.
By combining both objective technical assessments and subjective user feedback, the rating
framework can provide a holistic evaluation of digital connectivity in properties and areas,
ultimately driving improvements that align with consumer expectations and technological
advancements.
82833. Registration Process and Rating Lifecycle
The rating lifecycle begins with the registration of the Digital Connectivity Rating Agency
(DCRA) and property managers, ensuring adherence to established terms and conditions.
Following this, properties are mapped to the categories provided in the regulations for the
assessment process. The assessment phase involves a comprehensive review of the digital
connectivity infrastructure and services in the properties against set benchmarks, verifying
compliance with regulatory and operational standards. Only after completing the evaluation
steps, the final rating is awarded providing a transparent and standardized measure of digital
connectivity.
3.1. Eligibility Criteria of Digital Connectivity Rating Agency (DCRA)
Registration
An entity shall be eligible for registration as a Digital Connectivity Rating Agency (DCRA)
under regulation if it meets the criteria outlined in (Section III – "Registration of Digital
Connectivity Rating Agency" of the Regulation on Rating of Properties for Digital
Connectivity). The eligible entities may apply for registration as DCRA as per the guidelines
issued by the Authority from time to time.
3.2. Registration Process of DCRA
The registration process for Digital Connectivity Rating Agencies (DCRA) is outlined under
Section III – "Registration of Digital Connectivity Rating Agency" in the Regulation on Rating
of Properties for Digital Connectivity,2024 as amended from time to time. The process
ensures that only eligible and competent entities can participate in property rating activities.
The registration process, as provided in the regulations, is summarized below:
i. Any entity fulfilling the eligibility criteria under regulation and intending to
commence activity as DCRA under the regulations, shall make an application to the
Authority for grant of registration on the rating platform in the manner and format,
and upon payment of such fee, as may be specified by the Authority
ii. An application for registration, which is not complete in all respects or does not
conform to the eligibility criteria specified under regulation or the instructions
specified by the Authority from time to time, shall be rejected:
Provided that before rejecting any such application, the applicant shall be given an
opportunity to rectify the deficiency, if any, within thirty days from the date of receipt
of communication from the Authority;
84Provided further that the Authority may, for sufficient reasons, extend the time for
rectification of the deficiency by such time as it may be considered appropriate, but
such extended time shall not exceed thirty days.
iii. The Authority may, if it so desires, ask the applicant to appear before it, in person, in
connection with the grant of registration.
3.2.1 Grant of Registration and Listing on Rating Platform
The registration and listing process of DCRA on the rating platform is provided in regulation
(6) as summarized below:
i. Eligible applicants meeting the eligibility criteria under regulation will be granted
registration on the rating platform for a period of five years. However, the registration
granted under sub-regulation shall be subject to payment of such fees and such terms
and conditions, as may be specified by the Authority from time to time, by order or
direction.
ii. The registration granted under sub-regulations shall be valid for the specified period
unless it is suspended or cancelled by the Authority as per provisions of these
regulations, or upon approval of the request of DCRA for withdrawal of its registration
by the Authority.
iii. Such registration shall not confer any right upon the DCRA for assignment of work for
rating of property.
iv. The Authority may, upon the request of DCRA and on being satisfied with its
performance, subject to the DCRA meeting the eligibility criteria, renew the
registration of DCRA for another five years.
v. However, in case of non-renewal of its registration by the Authority, DCRA shall
continue to discharge its obligations under the regulations for the remaining validity
period of its registration.
vi. If the applicant or DCRA submits information which is found to be false or misleading
at any stage, either prior to the registration or during the validity of the registration,
the Authority shall, without prejudice to its rights under any law, Act or regulations,
reject the application for registration or cancel or suspend the registration of DCRA.
However, no order for cancellation or suspension of registration shall be made by the
Authority unless DCRA has been given a reasonable opportunity of representing
against such cancellation or suspension by the Authority.
853.2.2 Conditions of Registration for DCRA
The registration of DCRA shall be subject to the conditions prescribed under (Section III –
"Registration of Digital Connectivity Rating Agency" of the Regulation on Rating of
Properties for Digital Connectivity).
3.3. General Obligations for DCRA
DCRA is required to follow a set of terms and conditions prescribed under Section IV -
“General Obligations of DCRA” of “Regulation on Rating of Properties for Digital
Connectivity”. These terms ensure transparency, accountability, and compliance in the rating
process and cover the following aspects:
i. Code of Conduct.
ii. Disclosure of fees and other terms and conditions to the property manager.
iii. Evaluation and award of ratings.
iv. Monitoring of ratings.
v. Retention of records and audit of DCRA.
3.4. Registration of Property Manager
The registration of a Property Manager on the rating platform is an important step in ensuring
that only eligible and authorized individuals or entities can apply for property ratings related
to digital connectivity. This process is governed by the regulation under Section V – General
Obligations of Property Manager. The process for registration is summarized below:
i. Any property manager, who intends to apply for a rating of their property for digital
connectivity under these regulations, shall register himself on the rating platform, in
such manner and format and upon payment of such fees, as may be specified by the
Authority.
ii. No property manager, who is not registered on the rating platform, shall be eligible
to apply for the rating of property being used, controlled, or managed by him, in
accordance with the provisions of these regulations.
iii. If the property manager submits any false or misleading information, undertaking,
declaration or documents under this regulation, it shall amount to the contravention
of the provisions of the regulations and the authority may take action as per applicable
laws, Act or regulations.
iv. The fees for rating of property shall be mutually decided by DCRA and the property
manager as provided under regulation.
3.5. General Obligations for Property Manager
The general obligations of a Property Manager are provided in Section V– General Obligations
of Property Manager. These obligations broadly cover the following aspects:
i. Facilitation and co-operation during rating process and inspection.
ii. Compliance of terms and conditions of rating certificate.
86iii. Compliance to approved DCI design.
iv. Repair and maintenance of DCI.
v. Renewal of ratings.
vi. No exclusive arrangement with the service providers.
vii. Fair use of ratings.
viii. Change of property manager or ownership and continuity of DCI.
3.6. Classification of Properties for Rating
The classification of properties for the purpose of rating is one of the key aspects of the
regulations. It provides a structured framework to assess and categorize properties based on
their digital connectivity and ensure a standardized rating system for different types of
properties.
Below is the detailed classification of properties as provided in Section II of the regulation:
Category
S. No. Classification Type of Property
or Group
Apartments, independent houses, gated
1. Residential A
communities or societies, etc.
All properties of the Central Government, the
Government
2. A State Government, Courts, Public Sector
Properties
Undertakings, Local Bodies, Heritage Sites, etc.
Commercial office complex, shopping malls,
Commercial
3. A industrial estates, SEZs, convention centres,
Establishments
Hospitals, Hotels, Educational Institutions, etc.
Other private or Airport, Bus Station, Railway Station, multi-
4. B
public areas modal logistic parks, etc.
Stadiums or
Sport Arenas or Stadiums or permanent spaces of gathering
5. spaces of B with seating capacity of more than 5000
frequent persons
gathering
Transport Expressways, Highways, Railways routes,
6. B
corridors Metro corridors etc.
Table 3.1: Classification of Properties for Rating of digital connectivity
873.7. Rating Process for Constructed Properties
The rating process for digital connectivity in properties follows a structured, multi-stage
evaluation approach to ensure transparency, consistency, and reliability in assessing a
property’s digital capabilities. This framework is designed to evaluate service quality,
infrastructure readiness, and user experience, ultimately assigning a rating that reflects the
property’s ability to support digital connectivity efficiently. The following steps outline the
rating lifecycle and role of DCRA and Property Manager:
Figure 3.1: High Level Rating Workflow for Constructed Properties
i. Registration by DCRA and Property Managers: As already outlined in
Section 3.2 and Section 3.4 of this manual, the interested DCRA and Property
Managers need to register on the online rating platform. A one-time and non-
refundable registration fee, as prescribed by the Authority, must be paid by the
property manager at the time of registration. The registration enables Property
Managers to apply for a rating assessment of their properties. The property manager
may also apply for the rating of under construction properties to enable assessment
and guidance by DCRA on implementation of DCI in line with the provision.
However, the rating certificate shall be issued after provisioning DCI as per the
requirement of the regulation for rating criteria.
ii. Application for Rating of Properties:
a. Property Managers seeking a new rating or renewal of an existing rating for the
property shall submit an online application along with the prescribed supporting
documents.
b. A document checklist, including for fully constructed and under construction
properties, will be available in the Frequently Asked Questions (FAQ) section on
the rating platform.
c. Once application for rating is submitted by the property manager, the system will
generate a Unique Request Identification Number (URIN) for tracking the
application status.
88d. The Property Manager can select any of the registered DCRA from the list
provided on the rating platform.
e. The details of the maximum chargeable fee (MCF), to be charged by different
DCRAs, will be available on the rating platform.
f. Online application of the Property Manager will be automatically assigned to the
Digital Connectivity Rating Agency (DCRA) selected during the submission of
application for rating.
iii. Due-Diligence Stage I (Document Review and Preliminary Assessment):
a. The selected DCRA shall conduct Stage I of due diligence to assess basic
requirements for assessing the digital connectivity status of the property based
on the submitted documents.
b. This stage of assessment must be completed in a time bound manner within 30
days from the date of assignment of the property to the DCRA.
c. If additional details or clarifications are required, the DCRA will notify the
Property Manager to complete the application through the rating platform.
d. The Property Manager should provide relevant inputs to the DCRA within 7 days
of the request by the DCRA failing which the delay will be attributed to the
property manager and not to the DCRA.
e. All the requests and responses for seeking the inputs or clarifications shall be
made through the rating platform.
f. The DCRA will visit the site, at suitable stage(s) of construction, in case the site
is under development or construction to assess whether the DCI is in line with
the approved design. The DCRA will provide its inputs to the property manager
for construction of DCI aligned with requirements of rating criteria as far as
possible.
iv. Due-Diligence Stage I (Preliminary evaluation comments and action
points):
The DCRA shall share their comments with action items, if any, to the Property
Manager concerned through the rating platform. The actions points shall be
classified broadly in three categories as follows:
89a. Mandatory: These action points will only include the actions required by
Property Manager without which the evaluation process cannot proceed to next
stage.
b. Recommended: These action items will include those points which may affect
the rating score and consequently the rating of the property. The Property
Manager may choose to ignore these comments and may confirm proceeding for
the next stage of evaluation.
c. Optional: This category of action items will include suggestive actions to be
taken by the Property Manager which does not affect the score and rating of the
property. However, such actions may further improve quality of service and
consumer experience.
v. Corrective action by property manager:
a. In response to the action points arising out of ‘Preliminary evaluation’, the
Property Manager shall take remedial actions on mandatory points to proceed
for second stage of evaluation.
b. After all the ‘Mandatory’ action points are complied, the Property Manager can
apply for second stage of evaluation i.e., Due-Diligence Stage-II. However, the
property managers are encouraged to consider action on recommended and
optional inputs from DCRA to get the best possible score for their property.
vi. Due-Diligence Stage II:
a. The request for initiation of Due Diligence stage-II shall commence upon the
request of the property manager after the action has been completed on at least
‘Mandatory’ action points or preferable other recommended and optional points.
b. The Due Diligence stage-II will involve the process of onsite verification of digital
connectivity and associated infrastructure by the DCRA against the prescribed
rating criteria including as provided in supporting documents.
c. The detailed methodology for scoring against each criterion and sub-criteria and
respective weightage is provided in Chapter 4 for properties of category ‘A’ and
Chapter 5 for properties of category ‘B’ of this manual.
d. The Due Diligence Stage-II will be completed by the DCRA in a time-bound
manner preferable within 60 days of submission of request by the Property
Manager for Due Diligence-II evaluation.
e. The Due Diligence stage-II for under construction will commence on completion
of DCI construction, testing and integration.
90vii. Final Evaluation by DCRA and Award of Rating:
a. Final Evaluation by DCRA:
I. After the completion of Due Diligence stage - II, the DCRA shall consolidate
all the relevant details and prepare a comprehensive assessment report. The
assessment report shall cover the list of all documents collected; the
summary criteria and sub-criteria wise comments, documents, score
awarded, and list of test/evidence collected during the assessment.
II. The objective of each sub-criteria, methodology of assessment and scoring
criteria against each criterion and sub-criteria are provided in Chapter 4
for properties of category ‘A’ and Chapter 5 for properties of category ‘B’.
III. In the end, the assessment report will provide the score card for the
property against each criteria and sub-criteria.
IV. A copy of assessment report with URIN and property details shall be
uploaded against respective property. The assessment report will be digitally
signed by the authorized representative of the DCRA. This report will also
be visible to the property manager concerned.
V. The DCRA shall also update the score against each criterion and sub-criteria
on rating platform to generate the rating certificate.
b. Award of Rating:
I. After the rating score is updated in the rating platform, the DCRA shall
generate a rating certificate and sign it digitally.
II. The Property Manager will be able to download the rating certificate
through their registered account on the rating platform against respective
property till its validity.
c. Once the rating certificate is issued by DCRA, it will be available for the public to
view or verify the rating certificates either through unique certificate number or
QR code available on the certificate or other search and filter criteria as may be
provided on the rating platform.
3.8. Rating Process for Properties Under Construction
The rating process for digital connectivity in properties under construction follows a
structured, multi-stage evaluation approach to ensure transparency, consistency, and
reliability in assessment, while preserving the integrity of final rating outcomes. The
91framework enables design-stage assessment of Digital Connectivity Infrastructure (DCI)
readiness during the construction phase and provides for final evaluation based on on-
ground verification after completion of construction. This framework is designed to evaluate
service quality, infrastructure readiness, and user experience, ultimately assigning a rating
that reflects the property’s ability to support digital connectivity efficiently. The following
steps outline the rating lifecycle and role of DCRA and Property Manager:
Figure 3.2: High Level Rating Workflow for Properties Under Construction
i. Registration by DCRA and Property Managers: As already outlined in
Section 3.2 and Section 3.4 of this manual, the interested DCRA and Property
Managers need to register on the online rating platform. A one-time and non-
refundable registration fee, as prescribed by the Authority, must be paid by the
property manager at the time of registration. The registration enables Property
Managers to apply for a rating assessment of their properties. The property manager
may also apply for the rating of under construction properties to enable assessment
and guidance by DCRA on implementation of DCI in line with the provision.
However, the rating certificate shall be issued after provisioning DCI as per the
requirement of the regulation for rating criteria.
ii. Application for Rating of Properties:
a. Property Managers seeking rating for the property under construction shall
submit an online application in accordance with regulations, once all
components of Digital Connectivity Infrastructure (DCI) (covering
relevant criteria and sub-criteria as per regulations 24 and 25) have
been planned and approved as part of the building plan and
implementation design is ready.
b. A document checklist, including for fully constructed and under construction
properties, will be available in the Frequently Asked Questions (FAQ) section on
the rating platform.
c. In addition to the standard requirements, the Property Manager shall submit a
declaration specific to under-construction properties, in format specified by the
Authority. The declaration shall include the following:
92I. the target star rating that the property intends to achieve.
II. a rating criterion-wise and sub-criterion-wise plan, including:
(a) the proposed measures and design provisions to achieve the declared
target rating;
(b) the target score proposed against each applicable sub-criterion; and
(c) explanatory remarks mapping the proposed measures to approved
design documents.
III. The plan shall be supported by approved design documents and relevant
documentary evidence, such as approved building plans for DCI,
layouts, infrastructure schematics, and other supporting technical
documents related to DCI.
IV. The Property Manager shall provide appropriate documentary evidence for
each applicable sub-criterion, along with structured responses to specific
questions, where prescribed, in order to enable the DCRA to assess the level
of digital connectivity provisions at the design stage. Such responses shall
clearly explain how the proposed Digital Connectivity Infrastructure
complies with the requirements of the relevant criterion and sub-criterion.
d. In addition to the declaration and supporting documents specified above,
Property Managers of under-construction properties shall submit all
information, particulars, and documents as per regulation and rating manual.
This shall include details relating to the Property Manager and the property, such
as property name, type, category, status, proof of ownership and ownership
details, property address and area particulars, building layout plans including
areas proposed for assessment, and any other information or documents
required for assessment of digital connectivity under the Regulations and the
Rating Manual.
e. Once application for rating is submitted by the property manager, the system will
generate a Unique Request Identification Number (URIN) for tracking the
application status.
93f. The Property Manager can select any of the registered DCRA from the list
provided on the rating platform.
g. The details of the maximum chargeable fee (MCF), to be charged by different
DCRAs, will be available on the rating platform.
h. Online application of the Property Manager will be automatically assigned to the
Digital Connectivity Rating Agency (DCRA) selected during the submission of
application for rating.
iii. Due Diligence Stage I (DCI Design Review, Assessment and Certification
by DCRA):
a. For under-construction properties, the DCRA shall review the submitted
declaration and documents to verify completeness, consistency, and alignment
with the digital connectivity rating framework.
b. This stage is limited to building plan and DCI design verification and preliminary
evaluation, including site visits, where appropriate, to assess alignment with
approved designs.
c. During the review of the declaration, design documents, and supporting
information submitted by the Property Manager:
I. The concerned Digital Connectivity Rating Agency (DCRA) shall assess the
extent to which the proposed design-stage provisions in the property align
with the applicable rating criteria and sub-criteria;
II. In respect of those criteria and sub-criteria which involve parameters (such
as network speed, coverage, no. of service providers etc.) that cannot be
physically verified during the under-construction stage, the assessment
shall be based on the structured responses provided in this declaration and
the supporting documentary evidence submitted by the Property Manager.
Such assessment shall be indicative in nature and subject to verification
during Due Diligence Stage–II upon completion of construction and
commissioning of Digital Connectivity Infrastructure.
III. Based on such assessment, the DCRA shall determine the appropriate
design-stage star level corresponding to the planned Digital Connectivity
Infrastructure; and
94IV. The property shall be listed on the rating platform with the design-stage star
level as assessed by the DCRA, along with an indication that the rating is
based on design-stage evaluation.
V. Accordingly, a certificate indicating “Designed for XX Stars”, as
assessed by the DCRA, shall be issued to property manager
VI. The “Designed for XX Stars” certificate will be indicative in nature,
reflecting design-stage preparedness only, and shall not be treated as a final
or provisional Digital Connectivity Rating.
VII. This step must be completed by DCRA within a reasonable period
iv. Construction Phase Monitoring by DCRA:
a. As the deployment of Digital Connectivity Infrastructure progresses during
construction, the concerned DCRA, at appropriate stages of construction, will
monitor the development of DCI as per submitted design for obtaining rating for
design stage and may also suggest corrective and improvement action points, if
required, to Property Manager.
v. Intimation of completion of DCI by Property Manager and Confirmation
by DCRA:
a. Upon completion of construction and implementation as per DCI design, testing,
and integration of Digital Connectivity Infrastructure, the Property Manager
shall intimate the concerned DCRA through the rating platform.
b. Based on such intimation, the DCRA shall verify whether the DCI has been
implemented in accordance with the approved design-stage submissions and
shall record its confirmation on the rating platform, clearly indicating any
deviations, if observed, from the approved design.
vi. Due-Diligence Stage II:
a. Upon completion of construction, testing, and integration of Digital Connectivity
Infrastructure, and after confirmation by the concerned DCRA as recorded on the
rating platform, the Property Manager may submit a request for initiation of Due
Diligence Stage II through the rating platform. Due Diligence Stage II shall be
initiated only upon such request by the Property Manager.
b. The Due Diligence stage-II will involve the process of onsite verification of digital
connectivity and associated infrastructure by the DCRA against the prescribed
rating criteria including as provided in supporting documents.
95c. The detailed methodology for scoring against each criterion and sub-criteria and
respective weightage is provided in Chapter 4 for properties of category ‘A’ and
Chapter 5 for properties of category ‘B’ of this manual.
d. The Due Diligence Stage-II will be completed by the DCRA in a time-bound
manner preferable within 60 days of submission of request by the Property
Manager for Due Diligence-II evaluation.
vii. Final Evaluation by DCRA and Award of Rating:
a. Final Evaluation by DCRA:
I. After the completion of Due Diligence stage - II, the DCRA shall consolidate
all the relevant details and prepare a comprehensive assessment report. The
assessment report shall cover the list of all documents collected; the
summary criteria and sub-criteria wise comments, documents, score
awarded, and list of test/evidence collected during the assessment.
II. The objective of each sub-criteria, methodology of assessment and scoring
criteria against each criterion and sub-criteria are provided in Chapter 4
for properties of category ‘A’ and Chapter 5 for properties of category ‘B’.
III. In the end, the assessment report will provide the score card for the property
against each criteria and sub-criteria.
IV. A copy of assessment report with URIN and property details shall be
uploaded against respective property. The assessment report will be digitally
signed by the authorized representative of the DCRA. This report will also
be visible to the property manager concerned.
V. The DCRA shall also update the score against each criterion and sub-criteria
on rating platform to generate the rating certificate.
b. Award of Rating:
I. After the rating score is updated in the rating platform, the DCRA shall
generate a rating certificate and sign it digitally.
II. The Property Manager will be able to download the rating certificate
through their registered account on the rating platform against respective
property till its validity.
c. Once the rating certificate is issued by DCRA, it will be available for the public to
view or verify the rating certificates either through unique certificate number or
96QR code available on the certificate or other search and filter criteria as may be
provided on the rating platform.
3.9. Optional Digital Connectivity Audit
There may be scenarios where a Property Manager may wish to review the level of Digital
Connectivity Infrastructure (DCI) in a property for purpose of identifying gaps and
undertaking improvements, without applying for a Digital Connectivity Rating. Additionally,
once a rating is awarded, it becomes publicly visible, and therefore some Property Managers
prefer to first identify gaps and undertake improvements before opting for a formal rating
assessment.
In such situations, Property Managers may find value in obtaining an audit of the existing
digital connectivity infrastructure against the criteria and sub-criteria prescribed in the
Rating Manual, primarily for understanding the present status and areas requiring
improvement.
In such cases, Property Manager may, on a voluntary basis, engage a registered Digital
Connectivity Rating Agency (DCRA) to undertake an audit of the property’s digital
connectivity based on the criteria and sub-criteria specified in the Regulation and this Rating
Manual.
For the limited purpose of facilitating initiation of such audit and enabling transparency in
timelines, a simple electronic form may be made available on the Rating Platform. The form
shall capture basic details of the Property Manager and the property, along with selection of
a registered DCRA.
Upon submission of such request by the Property Manager, one or more DCRA(s), as
selected by Property Manager, shall be notified through the platform. Thereafter, the
Property Manager and the selected DCRA may mutually agree on the scope of audit,
timelines for completion, and fee structure.
Once mutual agreement is reached, the DCRA shall update its acceptance of the audit request
on the platform along with the agreed date of completion of the audit.
The DCRA shall update the status of such audit on the platform upon completion. The role
of the platform shall be limited to facilitation of initiation and status tracking only.
The outcome of an Optional Digital Connectivity Audit may include a report indicating the
present status of Digital Connectivity, identification of gaps against the applicable criteria
and sub-criteria as per Rating Manual, and actionable recommendations for improvement.
97Any indicative score or indicative star rating level, if provided, shall be non-binding and for
internal reference only.
The digital connectivity audit report prepared by the DCRA shall be shared directly with the
Property Manager.
Such optional audit shall not create any right, expectation, or entitlement with respect to
award of a Digital Connectivity Rating.
Participation in an Optional Digital Connectivity Audit shall not be a prerequisite for
applying for a Digital Connectivity Rating, nor shall it have any bearing on the outcome of a
rating assessment undertaken under the Regulation.
High-level workflow for Optional Digital Connectivity Audit is as:
Figure 3.3: High Level Workflow for Optional Digital Connectivity Audit
i. Submission of Audit Request: The Property Manager submits a Optional Digital
Connectivity Audit request through a simple electronic form on the rating platform
capturing basic property manager and property details along with selection of DCRA.
ii. Notification to DCRA(s) and submission of proposals to Property
Manager: The shortlisted DCRA(s) receives intimation of the audit request through
the platform. The concerned DCRA(s) will do the due diligence and submit their
proposals directly to Property Manager. DCRA may also request for on-site visit if
required.
iii. Mutual Agreement: The Property Manager and the selected DCRA mutually agree
on scope of audit, timelines, and fee. Property Manager shall update the selected
DCRA on the platform.
iv. Acceptance Update: The DCRA updates acceptance of the audit request along with
agreed date of completion.
98v. Conduct of Audit: The DCRA undertakes assessment of Digital Connectivity against
applicable criteria and sub-criteria, including on-site assessment, as per this rating
manual and prepare audit report.
vi. Report Sharing: The report is shared directly between the DCRA and the Property
Manager.
vii. Status Update: The DCRA updates the status of audit as ‘completed’ on the platform
for monitoring purposes.
***
994. Assessment Methodology for Category ‘A’ Properties
The regulation 24 under Section VII - “Rating criteria and process for evaluation of digital
connectivity and award of ratings” of the Regulation provides criteria, weightage, and high-
level sub-criteria against each main criterion for category ‘A’ properties as indicated in column
[a], [b], and [c] respectively in Table 4.1. To enable uniform and objective assessment against
each sub-criteria, the sub-criteria weightage shall be as provided in column [d]. The sub-
criteria weightage has been arrived factoring their relative importance for assessment of digital
connectivity and associated infrastructure.
Sub
S. No.
Criteria Criteria Weightage Sub-Criteria Criteria
(as per
No. Weightage
regulation)
[a] [b] [c] [d]
Compliance to
applicable 4.1.1 Approved
2.5
Model DCI design
Building Bye
Laws (MBBL)
4.1 1 5
and National 4.1.2 DCI
Building Code implementation
2.5
(NBC) for as per approved
digital DCI design
connectivity
4.2.1 Provision for
expansion of
Provision in telecom rooms 2
civil and cable
infrastructure, pathways
over and
4.2.2 Provision for
above MBBL
4.2 2 5 expansion of
and NBC
mobile and 2
requirements,
wireline
for ensuring
connectivity
robust digital
4.2.3 Ease of
connectivity
access of DCI
1
installed for repair
or maintenance
100Sub
S. No.
Criteria Criteria Weightage Sub-Criteria Criteria
(as per
No. Weightage
regulation)
[a] [b] [c] [d]
4.3.1 Redundancy
1
Provision in
of power source
power
infrastructure, 4.3.2 UPS power
2
over and backup for DCI
above MBBL
4.3 3 5 4.3.3 Power
or NBC
continuity 1
requirements,
monitoring
for ensuring
reliable digital 4.3.4 Building
connectivity Management 1
System
4.4.1 Availability
of alternate entry
paths for digital 3
connectivity
infrastructure
Digital 4.4.2 Non-
Connectivity flooding measures
4.4 10 3
4 Infrastructure for DCI
Resilience installation
4.4.3
Implementation
of redundancy in 4
power source and
DCI paths
4.5.1 Availability
of the latest
generation of 4
Future
mobile
Readiness of
connectivity
4.5 5 Digital 10
4.5.2 Support for
Connectivity 3
future bands
Infrastructure
4.5.3
Upgradability of 3
wireline DCI
101Sub
S. No.
Criteria Criteria Weightage Sub-Criteria Criteria
(as per
No. Weightage
regulation)
[a] [b] [c] [d]
4.6.1 Backhaul
fiber connectivity
10
(service provider
to property)
Provision of
4.6.2 Fiber
Wired
4.6 6 20 connectivity till 5
Connectivity
user premises
infrastructure
4.6.3 Fiber
connectivity in
each room or 5
office or
commercial space
4.7.1 Number of
wireline Internet
Service
providers having
7.5
integration with
Digital
Connectivity
Availability of Infrastructure
4.7 7 Service 15
Providers 4.7.2 Number of
Mobile Service
providers having
coverage or
7.5
integration with
Digital
Connectivity
Infrastructure
102Sub
S. No.
Criteria Criteria Weightage Sub-Criteria Criteria
(as per
No. Weightage
regulation)
[a] [b] [c] [d]
4.8.1 Mobile
network coverage
and performance 6
in public areas of
property
4.8.2 Secure
public Wi-Fi
network coverage
4
and performance
in public areas of
property
4.8.3 Mobile
network coverage
Service and performance 5
4.8 8 25
Performance in non-public
areas
4.8.4 Secure
public Wi-Fi
network coverage
5
and performance
in non-public
areas
4.8.5 Average
download speed of
different wireline
5
network(s) in
respective highest
speed plan
4.9.1 User
feedback on
User
4.9 9 5 digital 5*
Experience
connectivity
experience
* In case of new property, where actual end users are yet to use services, the weightage
against ‘User Experience’ shall be merged with ‘Service Performance’ and will be
distributed equally among each sub-criterion. (Refer Table 4.54)
Table 4.1: Weightage for different sub-criteria for category ‘A’ properties
103The Digital Connectivity Rating Agency (DCRA) shall assess the digital connectivity and
associated infrastructure as per provisions of the Regulations. The detailed assessment
methodology against each sub-criterion is provided in the following sections. The DCRA shall
scrupulously follow the assessment methodology and collect the artifacts, evidence or test
results as prescribed against respective sub-criteria under each main criterion. The required
supporting documents shall be preserved by the DCRA or uploaded to the rating platform as
per the requirement of the regulations, guidelines or rating manual issued or amended from
time to time. For awarding the score against each sub-criteria, ‘scoring criteria’ tables have
been provided in the following sections. A property can be awarded only one out of the given
scores in ‘scoring criteria’ table meeting the relevant compliance requirement as prescribed.
4.1. Compliance to Applicable Model Building Bye Laws (MBBL) and National
Building Code (NBC) for Digital Connectivity
(Weightage – 5)
This criterion evaluates whether a property adheres to the relevant provisions of Model
Building Bye-Laws (MBBL) and the National Building Code (NBC) of India in terms of digital
connectivity infrastructure. Compliance with these provisions ensures that properties are
designed and constructed with structured telecom infrastructure, safety standards, and
future-readiness for advanced digital services.
4.1.1. Sub-Criteria: Approved Digital Connectivity Infrastructure (DCI) design
(Weightage – 2.5)
i. Objective: The primary goal of this sub-criterion is to evaluate whether the digital
connectivity infrastructure (DCI) for a property has been planned and approved in
compliance with the applicable Model Building Bye-Laws (MBBL) and National
Building Code (NBC) regulations. Ensuring adherence to these standards is crucial
for:
a. Establishing a strong foundation for seamless digital connectivity.
b. Future-proofing readiness of the property by integrating provisions for advanced
communication technologies.
c. Enhancing digital accessibility and reliability for residents, businesses, and
service providers.
ii. Assessment Methodology
The assessment of the approved DCI design will be conducted based on document
verification, compliance checks, and certification validation. The key evaluation steps
are:
104a. Availability of Approved DCI or ICT Infrastructure Design
Documents:
1. Confirm whether the property manager has obtained formal approval for the
DCI blueprint.
2. Evaluate that the design considers all necessary elements of DCI as per
applicable Model Building Bye-laws (MBBL) or NBC.
b. Supporting documents:
1. The architectural drawings for digital connectivity or ICT infrastructure
2. The documents should be duly stamped and certified by the competent
authority.
c. Document Review:
1. Verify whether the submitted design aligns with the relevant sections of
MBBL and NBC.
2. Evaluate if the design accommodates evolving digital connectivity needs, such
as provisions for horizontal and vertical pathways, entry points, telecom
rooms/telecom areas, HVAC (Heat ventilation air conditioning) in telecom
room/telecom area etc. as per NBC.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Deviation Record
from Type of maintenance
S.
Item description MBBL or deviations requirement
No.
NBC (if any) (Upload/ DCRA
(Yes/ No) level)
Approved DCI design
1. documents by Record and Upload
competent authority
Design drawings
2. certified by Record
competent authority
Design compliance
3. with MBBL and NBC Record and Upload
standards
Table 4.2: Compliance checklist
105iv. Scoring criteria: The DCRA shall award score against this sub-criterion as follows:
S. No. Score Compliance Requirement
1. 2.5 On compliance to MBBL and NBC.
If there is minor deviation in design from MBBL
or NBC. Minor deviations shall be those
deviations which do not impact future readiness
2. 1.5
and provision of digital connectivity i.e. the
requirements under any criteria/sub-criteria
listed in section 4.4 & 4.6 of this manual.
Note: Refer 11.1 FAQ xiv. for further details
Table 4.3: Scoring criteria
4.1.2. Sub-Criteria: DCI implementation as per approved DCI design
(Weightage – 2.5)
i. Objective: The purpose of this assessment is to ensure that the Digital Connectivity
Infrastructure (DCI) at the property site has been implemented in strict accordance
with the approved DCI design. This verification is carried out in compliance with the
Model Building Bye-Laws (MBBL) and National Building Code (NBC) requirements
to ensure standardization, quality, and maintainability of digital infrastructure
deployment.
ii. Assessment Methodology
The assessment process is divided into three key components: Physical Inspection,
Supporting Documents, and Documentation Review to ensure a thorough
assessment.
a. Physical Inspection:
1. During physical verification, the DCRA shall verify the availability of DCI as
per the approved design under sub-criteria 4.1.1.
2. The compliance and deviations, if any, shall be specifically recorded with
supporting evidence.
b. Supporting Documents:
1. Photographs of installed key DCI infrastructure.
2. Site inspection reports for DCI with design vs implementation comparisons.
3. Testing and Commissioning certificates for DCI as applicable.
106c. Documentation Review:
1. Verify the as-build documents and confirm it is as per the approved design.
2. Validate the veracity of as-build DCI implementation with testing and
commissioning certificates for different DCI components.
3. Record observations in the onsite visit report.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Deviation Record
from Type of maintenance
S.
Item description MBBL or deviations requirement
No.
NBC (if any) (Upload/ DCRA
(Yes/ No) level)
As-build DCI is as per
1. Record and Upload
approved design
2. Photographs of DCI Record and Upload
Site inspection reports for
3. DCI with design Record and Upload
comparisons
Testing and
4. Commissioning certificates Record
for DCI as applicable
Table 4.4: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S.
Score Compliance Requirement
No.
On compliance with the approved design in the
1. 2.5
implementation of DCI or ICT infrastructure
If there is minor deviation from approved design in
implementation of DCI or ICT infrastructure. Minor
deviations shall be those deviations which do not impact
2. 1.5
future readiness and provision of digital connectivity i.e.
the requirements under any criteria/sub-criteria listed in
section 4.4 & 4.6 of this manual.
Table 4.5: Scoring criteria
1074.2. Provision in Civil Infrastructure, over and above MBBL and NBC
requirements, for Ensuring Robust Digital Connectivity
(Weightage – 5)
This criterion evaluates the extent to which a property goes beyond the mandatory
requirements set by the Model Building Bye-Laws (MBBL) and National Building Code
(NBC) to enhance its digital connectivity infrastructure.
4.2.1. Sub-Criteria: Provision for expansion of telecom rooms and cable
pathways
(Weightage – 2)
i. Objective: To assess the civil infrastructure provisions, over and above MBBL or
NBC requirements, for supporting DCI maintenance and future upgradation. Such
provisions may include the capacity for expanding telecom rooms/telecom areas,
cable pathways to support increasing telecom and digital infrastructure needs over
time.
ii. Assessment Methodology
a. Site Inspection: The Digital Connectivity Rating Agency (DCRA) will conduct
physical inspections to assess:
1. The availability and scalability of such civil infrastructure beyond the
requirement of NBC.
2. Upgradability and maintainability of DCI to support future digital
infrastructure needs. Here maintainability shall mean the ease of installation,
repair, and replacement of digital connectivity infrastructure by the property
manager or the service provider, as applicable.
b. Supporting documents: The DCRA will review building layout plans to verify:
1. The allocation of space for telecom rooms/telecom areas, and cable pathways.
2. Whether these provisions exceed the standard requirements of NBC or MBBL.
c. Documentation Review:
1. Validate the building layout plans and mark the specific civil infrastructure
considered as being provisioned beyond requirements of NBC or MBBL.
2. Prepare or review the assessment report (if already available with property
manager) on upgradability and maintainability of the civil infrastructure to
support future digital infrastructure needs.
108iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Building layout plans for
DCI or ICT infrastructure
1. duly marked and signed by Record and Upload
DCRA and property
manager
Expansion feasibility reports
– DCI or ICT infrastructure
2. Record and Upload
pathways and telecom
rooms/telecom areas
Table 4.6: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If telecom rooms/telecom areas, horizontal and vertical
1. 2 pathways are expandable to accommodate ≥ 50%
expansion with respect to existing capacity.
If telecom rooms/telecom areas, horizontal and vertical
2. 1.5 pathways are expandable to accommodate ≥ 30% and <
50% expansion with respect to existing capacity.
If telecom rooms/telecom areas, horizontal and vertical
3. 0.5 pathways are expandable to accommodate up to 30%
expansion with respect to existing capacity.
Table 4.7: Scoring criteria
1094.2.2. Sub-Criteria: Provision for expansion of mobile and wireline
connectivity
(Weightage – 2)
i. Objective: To assess the availability of civil infrastructure like DCI space,
pathways, and provisions to allow for the expansion of both mobile (e.g.,
4G/5G/6G) and wireline connectivity (e.g., fiber-optic cables, Television, camera
etc.) inside the property as technology evolves.
ii. Assessment Methodology
a. Physical Verification of Expansion Conduits:
1. Inspect the telecom room/telecom area, ducts, risers, and pathways to assess
if sufficient space is available for future mobile and wireline deployments.
2. Inspect the space earmarked for installation of mobile base station(s),
distributed antenna system, Wi-Fi infrastructure, Direct to Home (DTH)
system etc. to extend coverage inside the property including lifts and
basements.
b. Technology Readiness: Evaluate whether the current civil infrastructure
design supports emerging technologies such as 5G, Internet of Things (IoT),
Machine to Machine Communication (M2M) and high-capacity fiber networks.
c. Supporting Documents:
1. Layout diagrams for existing civil infrastructure for DCI.
2. Layout indicating provisions for future expansion.
d. Documentation Review: Verify the updated network diagrams and future
expansion plans during the physical verification and site inspection.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
Compliance
S. No. Item description requirement (Upload/
(Yes/ No)
DCRA level)
Updated network
1. Record and Upload
diagrams
Future expansion
2. Record and Upload
plans
Table 4.8: Compliance checklist
110iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S.
Score Compliance Requirement
No.
If civil infrastructure or space provision and pathways
are available and space is earmarked, in the approved
1. 2 layout, to support installation of Mobile base station(s),
Distributed Antenna System (DAS), Wi-Fi, Wireline
infrastructure and Direct to Home (DTH) system etc.
If space provision and pathways exist for at least Mobile
2. 1.5
base station, DAS, and Wireline infrastructure
If space provision and pathways exist for at least Wi-Fi
3. 1
or Wireline infrastructure
Table 4.9: Scoring criteria
4.2.3. Sub-Criteria: Ease of access of DCI installed for repair or maintenance
(Weightage – 1)
i. Objective: Properly planned access areas for DCI are essential to ensure ease of
maintenance and repair of digital connectivity infrastructure. This reduces
downtime and service interruptions. These sub-criteria intend to evaluate the ease
of maintenance of DCI which is supported by the provisioned civil infrastructure.
The equipment, cables, pathways, ducts should be easily accessible for smooth repair
and maintenance of DCI by respective service providers.
ii. Assessment Methodology:
a. Physical Accessibility: Conduct on-site assessments to check the physical
accessibility of pathways, telecom rooms/telecom areas, cable ducts and
equipment points.
b. Labeling and Marking Verification: Verify all DCI equipment, pathways,
cable ducts etc. are clearly labeled and marked.
c. Supporting documents
1. Site photos showing maintenance pathways.
2. As-build documentation.
111iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
Compliance
S. No. Item description requirement (Upload/
(Yes/ No)
DCRA level)
Site photos showing
1. maintenance Record and Upload
pathways
Maintenance
2. Record
checklists
Table 4.10: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If physical accessibility of pathways, telecom
rooms/telecom areas, cable ducts and equipment
1. 1 is provided and labelling of pathways, telecom
rooms/telecom areas, cable ducts and equipment
is available for DCI.
If physical accessibility of pathways, telecom
rooms/telecom areas, cable ducts and equipment
2. 0.5 is provided or labelling of pathways, telecom
rooms/telecom areas, cable ducts and equipment
is available for DCI.
Table 4.11: Scoring criteria
1124.3. Provision in Power Infrastructure, over and above MBBL or NBC
requirements, for Ensuring Reliable Digital Connectivity
(Weightage – 5)
This criterion evaluates additional provisions in power infrastructure that go beyond the
Model Building Bye-Laws (MBBL) and National Building Code (NBC) to ensure
uninterrupted and reliable power supply for digital connectivity.
4.3.1. Sub-Criteria: Redundancy of power source
(Weightage – 1)
i. Objective: The redundant power sources are essential for reliable operation of
digital connectivity. Under this sub-criterion, the availability of redundancy in
power sources is assessed to ensure that DCI remain operational even during power
failures. This redundancy may include backup generators or alternative power
systems.
ii. Assessment Methodology:
a. Verification of actual peak load and available capacity of redundant
power source:
1. Verify the availability of redundant power source for DCI.
2. Verify whether all key DCI and systems are on redundant power source like
alternate feeder or separate power generator.
b. Power Source Switching Tests: Check the functionality of the automatic
switchover mechanism between primary and backup power sources on a sample
basis.
c. Supporting documents:
1. Power layout diagrams.
2. DCI load switchover test report.
d. Documentation Review: Verify the power layout diagrams, load test reports
submitted by the property manager.
113iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
1. Power layout diagrams Record and Upload
Load switchover testing
2. Record and Upload
reports
Table 4.12: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If all digital connectivity services affecting load is
1. 1
supported/ fed by redundant power source
Table 4.13: Scoring criteria
4.3.2. Sub-Criteria: UPS power backup for DCI
(Weightage – 2)
i. Objective: The continuity of power supply is essential for uninterrupted digital
connectivity and Uninterrupted Power Supply (UPS) systems play an important
role in service availability for any telecom or information and communication
technology system. This sub-criterion will assess the availability and robustness of
power backup system in case of failure of input sources i.e. commercial power and
generator supply.
ii. Assessment Methodology:
a. UPS backup verification for DCI:
1. Check from the line diagram whether all DCI systems are provided with UPS
backup.
2. Verify the DCI system rated load and correspond UPS power capacity
provided for DCI from commissioning reports or other authentic documents
to calculate the provisioned UPS backup time.
3. Check the availability of UPS system redundancy by way of load sharing
among multiple UPS if applicable.
4. Sample test the UPS system’s ability to provide uninterrupted power to the
DCI by simulating input power failure.
114b. Supporting documents:
1. Electrical system line diagram for key DCI elements including redundant
input sources and UPS system(s).
2. Test reports of UPS power backup time or other supporting document(s)
with full DCI load and other load if any.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record
maintenance
Compliance
S. No. Item description requirement
(Yes/ No)
(Upload/ DCRA
level)
Electrical system line diagram
1. including redundant input Record and Upload
sources and UPS system(s)
Whether all key DCI systems
2. affecting service availability are Record
on UPS?
Whether UPS system has
3. Record
redundancy?
UPS switch over successfully
4. Record
tested during sample testing?
Whether duration of UPS backup
5. matches with available test Record and Upload
reports with full DCI load?
Table 4.14: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
UPS power backup for important DCI components > 3
1. 2
Hrs.
UPS power backup for important DCI components is ≥ 1
2. 1
and ≤ 3 Hrs.
Table 4.15: Scoring criteria
1154.3.3. Sub-Criteria: Power continuity monitoring
(Weightage – 1)
i. Objective: The power supply monitoring system plays an important role in ensuring
the power supply continuity to DCI. If the health of power systems like generator or
UPS or switch gear systems is not monitored on a continuous basis, it may result in
major interruption when input commercial power supply fails. Therefore, this sub-
criterion provides special emphasis on the implementation of monitoring system in
the property for power services.
ii. Assessment Methodology:
a. Verification of Monitoring Dashboards: Verify availability of dashboards
or interfaces showing real-time power status, health status of UPS, generator(s),
alerts, and reports/ alerts in case of power failures.
b. Validation of Automated Alerts: Test alert mechanisms for their ability to
notify maintenance team of power anomalies in real time.
c. Supporting documents: Monitoring system screenshots with alerts generated
during testing.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Monitoring system
1. Record and Upload
high level diagram
Capture monitoring
2. system dashboard Record and Upload
screenshot
Table 4.16: Compliance checklist
116iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
The dashboard covers end-to-end health status
1. 1
monitoring of all power systems
The dashboard covers end-to-end health status
2. 0.5 monitoring of important power systems which may
affect DCI availability
Table 4.17: Scoring criteria
4.3.4. Sub-Criteria: Building Management System
(Weightage – 1)
i. Objective: While power monitoring system manages power related installations,
building management system (BMS) encompasses monitoring of major building
services like fire alarms, access control, Heating, Ventilation Air conditioning
(HVAC), power systems etc. These facilities may affect the performance and
availability of DCI and digital connectivity services. Thus, availability of BMS in the
property enhances the DCI service availability and continuity. Therefore, this sub-
criterion has been incorporated as a part of assessment for an enabling system for
digital connectivity services.
ii. Assessment Methodology
a. Real-Time Data Integration Tests: Verify that the DCI power, fire alarms
and HVAC management system is integrated with the BMS to provide centralized
control and monitoring for DCI systems.
b. BMS communication and notification validation: Validate that the BMS
receives accurate input data from related sensors or actuators and disseminates
to the operations team in configured timelines.
c. Supporting documents:
1. BMS system high level diagram for DCI system areas of the property.
d. Documentation Review:
1. Verify the BMS screenshots against system diagrams.
117iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
Compliance
S. No. Item description requirement (Upload/
(Yes/ No)
DCRA level)
BMS system
1. Record and Upload
architecture diagrams
Test report on DCI
power systems, fire
2. Record and Upload
alarms and HVAC
integration with BMS
Sample test report on
detection and
notification of main
3. Record and Upload
power supply failure
and takeover by
generator/UPS for DCI
Table 4.18: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
On availability of BMS integration covering power, fire
1. 1 alarm and HVAC for telecom room(s)/telecom area(s) in
the property
On availability of BMS integration covering at least two
2. 0.5 out of, power, fire alarm and HVAC for telecom
room(s)/telecom area(s) in the property
Table 4.19: Scoring criteria
1184.4. Digital Connectivity Infrastructure Resilience
(Weightage – 10)
Digital connectivity infrastructure (DCI) resilience is a critical factor in ensuring
uninterrupted and high-quality digital connectivity for properties. Resilience refers to the
ability of the infrastructure to withstand disruptions, minimize downtime, and provide
redundancy in case of failures or network congestion.
4.4.1. Sub-Criteria: Availability of alternate entry paths for digital connectivity
infrastructure
(Weightage – 3)
i. Objective: To assess the availability of alternate external entry paths in the
property. The alternate entry paths enable the service providers to extend digital
connectivity with route diversity which reduces the service disruptions in case of
fault in one segment of the network ring including any damage within the property.
The availability of route diversity up to the telecom rooms/telecom areas is an ideal
scenario.
ii. Assessment Methodology:
a. Physical verification as per design documents:
1. Examine on-site layouts for ducts from the entry points and cable pathways
to confirm the availability of alternate entry paths for DCI in the property.
2. Sufficient capacity for multiple service providers.
b. Supporting documents: Ducts and pathway layout diagrams to verify the
availability on site.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record
maintenance
Compliance
S. No. Item description requirement
(Yes/ No)
(Upload/ DCRA
level)
Ducts layout diagrams from
1. different external entry points Record and Upload
for fiber/ DCI
Pathway layout diagrams
from ducts to telecom
2. Record and Upload
room(s)/telecom areas(s) for
fiber/ DCI
Table 4.20: Compliance checklist
119iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
Availability of alternate duct from property entry point
1. 3 and cable pathway routes till telecom room(s)/telecom
areas(s)
Availability of alternate duct from property entry point till
2. 2
telecom room(s)/telecom area(s)
Availability of alternate cable pathway routes from
3. 1 common location in property till telecom
room(s)/telecom area(s)
Table 4.21: Scoring criteria
4.4.2. Sub-Criteria: Non-flooding measures for DCI installation
(Weightage – 3)
i. Objective: Flooding can cause significant damage to digital connectivity
infrastructure and disruption in digital connectivity. Measures like raised
installations, waterproof enclosures, and drainage systems may prevent flooding
of key DCI elements. This sub-criterion intends to the implementation of non-
flooding measures in the property to protect the DCI.
ii. Assessment Methodology:
a. Site Inspection:
1. Check with the site layout and actual location of telecom rooms/telecom
areas if they are located on higher floors, away from potential flooding
zones like basements or ground floors.
2. Verify that power equipment like generator set, UPS, switch over panels are
installed on raised platforms or locations which are less susceptible to
flooding.
3. Verify that no water drain system is connected to the telecom/DCI
rooms/telecom areas which can cause backflow.
b. Drainage System Review: Check the availability of drainage systems with
functional checks to prevent backflow of floodwaters.
c. Supporting documents:
1. Design and layout documentation to review infrastructure layouts to verify
that flood prevention measures align with best practices.
2. Sample photographic evidence for key DCI system as proof of
implementation.
120iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record
maintenance
Compliance
S. No. Item descriptions requirement
(Yes/ No)
(Upload/ DCRA
level)
Site photos of whether
DCI/telecom
1. room(s)/telecom area(s) are Record and Upload
above ground floor as per
design and implementation?
Site photos of whether key
power systems like UPS/
Generators for DCI are
2. Record and Upload
installed on grounds or
higher floor with non-
flooding consideration?
Site photos of whether
drainage system is
3. Record and Upload
implemented as per design
layout?
Table 4.22: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
Telecom/DCI room(s)/Telecom area(s) and UPS are above
1. 3 ground floor and generators/ switching panels are installed
with non-flooding considerations
Only Telecom/DCI room(s)/Telecom area(s) is
2. 2 implemented above ground floor and backup power system
(UPS) is implemented with non-flooding measure
If Telecom/DCI room(s)/Telecom areas(s) and generator
3. 1
system is implemented with non-flooding consideration
Table 4.23: Scoring criteria
1214.4.3. Sub-Criteria: Implementation of redundancy in power source and DCI
paths
(Weightage – 4)
i. Objective: The redundant pathways for power and fiber cables inside the property
provide path diversity in extending digital connectivity within and across the floor
or building blocks. Redundancy should be applied to both the power supply and the
connectivity pathways for ensuring that the DCI through other path can take over
without impacting digital connectivity.
ii. Assessment Methodology:
a. Redundancy Verification:
1. Review the DCI for the presence of at least two independent power sources
(e.g., main power grid and backup generators or UPS).
2. Examine the availability of path diversity for fiber or other cables across the
building blocks, basements, and towers from Telecom/digital connectivity
infrastructure room(s)/ Telecom area(s).
3. Verify that digital connectivity till key aggregation points is supported by a
minimum of two physically separated paths.
b. Supporting documents:
1. Power and cable layout for DCI indicating path redundancy.
2. Sample test reports demonstrate that actual redundancy performance has
been tested during commissioning.
c. Documentation Review:
1. Verify power and cable layout diagram for DCI indicating path redundancy
with actual implementation.
2. Validate test reports to confirm that redundancy mechanisms function as
intended.
122iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record
maintenance
Compliance
S. No. Item description requirement
(Yes/No)
(Upload/ DCRA
level)
Whether DCI is supported with
1. redundant power sources Record
(Generator/ UPS)?
Whether power system network
2. layout for DCI is implemented Record and Upload
with path diversity?
Whether sample test reports
3. demonstrate testing of Record and Upload
redundancy?
Whether path diversity for fiber
and other cables (DTH/
ethernet as applicable) across
the building blocks, basements
4. Record and Upload
and towers from telecom/digital
connectivity infrastructure
room(s)/ telecom area(s) is
implemented?
Table 4.24: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If redundant paths are implemented for power system
1. 4
to DCI and fiber path in the property
If either the power system to DCI or the fiber path
2. 2
incorporate path redundancy
Table 4.25: Scoring criteria
1234.5. Future Readiness of Digital Connectivity Infrastructure
(Weightage – 10)
Future readiness in digital connectivity infrastructure ensures that properties are equipped
to support next-generation telecom technologies, evolving connectivity needs and increasing
data demands. Future-ready property may be considered to have been designed to adapt,
scale, and integrate upcoming innovations in digital connectivity, enabling seamless
adoption of emerging technologies like 5G, advanced Wi-Fi and smart building solutions.
4.5.1. Sub-Criteria: Availability of the latest generation of mobile connectivity
(Weightage – 4)
i. Objective: The infrastructure should be equipped to support the latest generation
of mobile connectivity, such as 4G/5G and future network standards, to ensure high-
speed, low-latency, and reliable communication. The availability of advanced mobile
infrastructure significantly impacts digital connectivity performance and user
experience. This sub-criterion focuses on assessing whether a property has the
necessary infrastructure to support current and next-generation mobile networks
and is future-ready for upcoming technologies.
ii. Assessment Methodology:
a. Inspection of latest technology installed Infrastructure:
1. Physical Verification: Inspect the property’s mobile network
infrastructure, providing coverage to the property including distributed
antenna systems (DAS), and backhaul connectivity.
2. Technology Support: Evaluate if the installed infrastructure is sufficient
to provide coverage in the different areas of the property.
b. Technical Validation:
1. Cross-check compatibility with current frequency bands with different
service providers for latest/current technology.
c. Supporting documents:
1. List of the latest generation mobile connectivity equipment’s installed in the
property.
2. Photographs of installed latest generation mobile connectivity equipment.
124iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Whether the equipment
installed supports the
1. Record
latest generation of
mobile connectivity?
Photographs of installed
2. latest generation mobile Record and Upload
connectivity equipment
Table 4.26: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S.
Score Compliance Requirement
No.
If equipment like DAS, RRU, Base Station, etc.
1. 4 supporting 5G and 4G technology are installed in the
property for mobile connectivity
If equipment like DAS, RRU, Base Station, etc.
2. 2 supporting 4G or 5G technology are installed in the
property for mobile connectivity
Table 4.27: Scoring criteria
4.5.2. Sub-Criteria: Support for future bands
(Weightage – 3)
i. Objective: To ensure long-term relevance and adaptability, digital connectivity
infrastructure must be designed to support the integration of future wireless
communication bands and evolving wired and mobile technologies. The rapid
evolution of telecommunications standards, frequency bands, and network
technologies necessitates a future-proof approach to infrastructure planning. This
enables seamless upgrades, minimizes costly retrofitting, and ensures properties
remain technologically competitive for years to come.
ii. Assessment Methodology
a. Validate the support or upgradability of installed Digital Connectivity
Infrastructure (DCI) for future bands for latest technology.
125b. Verify RF infrastructure installed like radio units, baseband units, duplexers,
combiners, and transmitters, as applicable, are capable for supporting upcoming
technologies and frequency bands.
c. Supporting documents:
1. Bill of Material (BoM) installed at the property and datasheets for relevant
equipment.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
Compliance
S. No. Item description requirement
(Yes/ No)
(Upload/ DCRA level)
Bill of Material (BoM)
installed at building along
1. Record
with datasheets for relevant
equipment
Whether DCI supports
future bands for mobile or
2. Record and Upload
Wi-Fi network as applicable
as per datasheets?
Table 4.28: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If installed infrastructure supports future bands for
4G and 5G technology and/or Wi-Fi network as per
1. 3
the extant National Frequency Allocation Plan
issued by DoT.
If installed infrastructure supports future bands for
4G technology and/or Wi-Fi network as per the
2. 2
extant National Frequency Allocation Plan issued by
DoT.
If installed infrastructure supports future bands for
3. 1 4G technology or Wi-Fi network as per the extant
National Frequency Allocation Plan issued by DoT.
Table 4.29: Scoring criteria
1264.5.3. Sub-Criteria: Upgradability of wireline DCI
(Weightage – 3)
i. Objective: Wireline digital connectivity infrastructure (DCI), such as fiber-optic
networks, plays a crucial role in ensuring high-speed internet access and seamless
communication. As technology evolves, infrastructure must be designed to
accommodate future upgrades, such as higher bandwidth capacities, new
transmission standards, and enhanced network architectures. This sub-criterion
evaluates whether the existing fiber-optic network can be scaled or upgraded
without requiring extensive rework.
ii. Assessment Methodology:
a. Existing bandwidth verification:
1. Assess the current fiber-optic network’s bandwidth capabilities to determine
if it supports high-speed data transfer (e.g., 1 Gbps, 10 Gbps, or higher).
2. Evaluate the type of fiber used and whether it can support technologies such
as Dense Wavelength Division Multiplexing (DWDM) or Passive Optical
Networks (PON).
b. Scalability review:
1. Inspect the physical infrastructure, including cable pathways, ducts, and
fiber termination points, to verify if additional fiber cables can be added in
the future without major structural modifications.
2. Check the fiber distribution frames to assess whether they allow easy
upgrades or expansions.
3. Determine whether there is spare capacity in existing ducts and conduits to
accommodate additional fiber strands if needed.
c. Supporting documents:
1. Documents to demonstrate upgradability of wireline DCI.
2. Photographic evidence of installed wireline DCI to document their capacity
for future expansion.
127iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
Compliance
S. No. Item description requirement (Upload/
(Yes/ No)
DCRA level)
Upgradability of existing
wireline DCI equipment’s
1. (switches/ routers/ Record
splitters/ PON etc.) and
relevant cables
Whether the bandwidth
supported through optical
2. Record and Upload
fiber with speed 1 Gbps or
higher?
Table 4.30: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If existing wireline infrastructure is on fiber and
1. 3
support minimum 1 Gbps to end users
If existing wireline infrastructure is on fiber and
2. 2
support minimum 500 Mbps to end users
If existing wireline infrastructure is on fiber and
3. 1
support minimum 100 Mbps to end users
Table 4.31: Scoring criteria
1284.6. Provision of Wired Connectivity Infrastructure
(Weightage – 20)
This criterion evaluates the availability, quality, and scalability of the wired connectivity
infrastructure within a property.
A robust wired network ensures high-speed, reliable, and low-latency digital connectivity,
supporting various applications such as business operations, smart building technologies
and residential broadband needs as per property use.
4.6.1. Sub-Criteria: Backhaul fiber connectivity (service provider to property)
(Weightage – 10)
i. Objective: A high-capacity fiber optic backhaul connection is essential to ensure
high-speed and uninterrupted digital connectivity for users within the property. The
presence of a dedicated fiber connection from the service provider to the property
enhances network performance, reduces latency, and supports high-bandwidth
applications such as video conferencing, cloud computing, and smart building
management systems.
ii. Assessment Methodology:
a. Fiber availability check:
1. Conduct a physical verification of the fiber optic backhaul infrastructure
connected to the service provider’s network.
2. Check redundancy measures, such as dual entry fiber paths, in place for
uninterrupted fiber connectivity in case of failure.
b. Bandwidth capacity check:
1. Record the provisioned Bandwidth capacity in the property for each service
provider.
i. BW capacity on fiber
ii. BW capacity on wireless
iii. BW on any other media (please specify)
c. Supporting documents:
1. Fiber cable details from service providers to the property and supporting
documents regarding available bandwidth from each service provider on
fiber.
129d. Documentation Review: Validate the Telecom/ Internet service provider
agreements and fiber/ bandwidth testing results.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
Compliance
S. No. Item description requirement (Upload/
(Yes/ No)
DCRA level)
1. Fiber testing results Record
Photographs of fiber
termination point at
2. Record and Upload
main telecom
room/telecom area
Table 4.32: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S.
Score Criteria
No.
[(5) *(No. of wireline service providers
having fiber backhaul)
(No. of wireline service providers
present in the property)]
Score
1. 10
Awarded = +
[(5) *(No. of wireless service providers
having fiber backhaul)
(No. of wireless service providers
present in the property)]
Table 4.33: Scorin g criteria
1304.6.2. Sub-Criteria: Fiber connectivity till user premises
(Weightage – 5)
i. Objective: Sub-criterion assesses whether high-capacity fiber-optic infrastructure
extends from the telecommunication room/transmission room/telecommunication
area up to the end-users within a property. The aim is to facilitate the extension of
digital connectivity to the residents, businesses, and offices. A fiber-optic connection
reaching the user premises guarantees superior bandwidth, lower latency, and
future-proof infrastructure capable of supporting evolving digital requirements such
as 5G backhaul, cloud services, and smart building applications. The well planned
and laid fiber cables from telecom room(s)/telecom area(s) to the user premises
(flat/ home/ office/ shop etc. as applicable) enables faster provisioning and easy to
maintain.
ii. Assessment Methodology
a. Physical Inspection: Verify that fiber-optic cabling extends up to each
residential, office, or commercial unit within the property.
b. Supporting documents:
1. Fiber network architecture showing fiber distribution from the telecom
room/telecom area or meeting point to each unit.
2. Fiber test reports confirming connectivity to each unit
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Fiber layout diagrams up
1. Record and Upload
to user premises
Sample fiber test reports
2. confirming connectivity Record sand Upload
to each user premise
Table 4.34: Compliance checklist
131iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If fiber connectivity is extended from telecommunication
1. 5 room/ transmission room/ telecommunication area to
all user units within the property
If fiber connectivity is extended from telecommunication
2. 4 room/ transmission room/ telecommunication area to a
minimum of 75% of user units within the property
If fiber connectivity is extended from telecommunication
3. 3 room/ transmission room/ telecommunication area to a
minimum of 50% of user units within the property
If fiber connectivity is extended from
telecommunication room/ transmission room/
4. 2
telecommunication area to a minimum of 30% of user
units within the property
Table 4.35: Scoring criteria
4.6.3. Sub-Criteria: Fiber connectivity in each room or office or commercial
space
(Weightage – 5)
i. Objective: The goal of this sub-criterion is to assess whether every individual space
within the property, whether a residential unit, office, or commercial
establishment—has fiber connectivity. This guarantees seamless high-speed internet
access across the entire property, eliminating connectivity dead zones and ensuring
a uniform digital experience for all occupants.
ii. Assessment Methodology:
a. Visual Inspection: Inspect rooms, offices, or commercial spaces on a sample
basis to confirm the presence of fiber-optic connectivity infrastructure and
termination points in each room/ office.
b. Supporting documents:
1. Network layout diagram for user units showing fiber terminations and
sample test reports for fiber terminations.
2. Site survey reports and photographic evidence.
132iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Network layout diagram
1. for user units showing Record
fiber terminations
Sample test reports for
2. fiber terminations Record and Upload
testing
Table 4.36: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If fiber connectivity is extended in each room/ office/
1. 5
commercial space of all user units within the property
If fiber connectivity is extended in each room/ office/
2. 4 commercial space of minimum 75% of user units within
the property
If fiber connectivity is extended in each room/ office/
3. 3 commercial space of minimum 50% of user units within
the property
If fiber connectivity is extended in each room/ office/
4. 2 commercial space of minimum 30% of user units within
the property
Table 4.37: Scoring criteria
1334.7. Availability of Service Providers
(Weightage – 15)
This criterion evaluates the number and diversity of wireline and mobile service providers
that have integrated their services with the Digital Connectivity Infrastructure (DCI) of a
property. A higher number of available providers ensure better service quality, redundancy,
and consumer choice.
4.7.1. Sub-Criteria: Number of wireline Internet Service providers having
integration with Digital Connectivity Infrastructure
(Weightage – 7.5)
i. Objective: The presence of multiple wireline Internet Service Providers (ISPs)
within a property significantly enhances competition, service quality, redundancy,
and network resilience, ensuring reliable and high-speed digital connectivity. A
multi-ISP infrastructure benefits property managers, businesses, and residents by
providing greater flexibility, improved service continuity, and optimized cost
structures.
ii. Assessment Methodology:
a. Verification of ISP Integration: Confirm the number of wireline TSP/
ISPs integrated with the DCI by inspecting the infrastructure and service
availability.
b. Telecom/Internet Service Provider Agreement Review: Verify
agreements with TSP/ISPs and sample integration test reports.
c. Validation: Verify that all integrated TSP/ISPs are operational.
d. Supporting documents:
1. Telecom/ Internet Service Provider (TSP/ ISP) Agreements.
2. Network integration certificates/ test reports.
3. Service subscription status.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Telecom/ Internet
1. Service Provider (ISP) Record
Agreements
134Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Network integration
2. certificates/ test Record
reports
Service subscription
3. Record and Upload
status
Table 4.38: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If 3 or more internet service providers have
1. 7.5 integration with DCI in the property with active
service subscription
If a minimum of 2 internet service providers
2. 5 have integration with DCI in the property with
active service subscription
If at least one internet service provider has
3. 2 integration with DCI in the property with active
service subscription
Table 4.39: Scoring criteria
4.7.2. Sub-Criteria: Number of Mobile Service providers having coverage or
integration with Digital Connectivity Infrastructure
(Weightage – 7.5)
i. Objective: The objective of this sub-criterion is to assess the extent to which
multiple mobile service providers (TSPs) are integrated with the property’s digital
connectivity infrastructure (DCI) or have adequate service coverage measured as per
methodology in section 4.8. Having multiple mobile service providers ensures users
have reliable network coverage, high-quality service, and reduced congestion,
particularly in high-density areas like commercial properties, residential complexes,
and office spaces.
135ii. Assessment Methodology:
a. Coverage Verification:
1. Confirm the number of Telecom Service Providers (TSPs) providing indoor
coverage for the property.
2. Validate integration of the DCI with In-Building Solutions (IBS)/ Small
Cells/ Wi-Fi offload for enhanced indoor mobile coverage.
b. Supporting documents:
1. Agreements signed with Telecom Service Providers.
2. Walk/drive test results and/or RF coverage map in the property
c. Documentation Review: Validate the TSP agreements and network
integration test reports.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
Compliance
S. No. Item description requirement (Upload/
(Yes/ No)
DCRA level)
Walk/drive test results
and/or RF coverage
1. Record and Upload
map in the property
Network performance
2. test results from Record
multiple operators
Agreements signed with
Telecom Service
3. Record
Providers (without
commercial details)
Table 4.40: Compliance checklist
136iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If 3 or more mobile service providers individually have
overall more than 75% coverage (RSRP ≥ -110 dBm) for
1. 7.5
4G/5G services in the property either through integration
with DCI or otherwise.
If at least two mobile service providers individually have
overall more than 75% coverage (RSRP ≥ -110 dBm) for
2. 5
4G/5G services in the property either through integration
with DCI or otherwise.
If at least one mobile service providers have overall more
than 75% coverage (RSRP ≥ -110 dBm) for 4G/5G services
3. 2
in the property either through integration with DCI or
otherwise.
Table 4.41: Scoring criteria
4.8. Service Performance
(Weightage – 25)
Service performance is a critical factor in evaluating the digital connectivity of a property.
This criterion assesses service performance parameters to assess digital experience in the
property including lifts and basements. For assessment of mobile service coverage, the
reference minimum signal strength for 2G/4G/5G technology shall be same as prescribed by
TRAI for publishing of coverage map under revised QoS regulation i.e. ‘THE STANDARDS
OF QUALITY OF SERVICE OF ACCESS (WIRELINE AND WIRELESS) AND BROADBAND
(WIRELINE AND WIRELESS) SERVICE REGULATIONS, 2024 (06 of 2024)’.
To assess service performance for mobile (data and voice services) and Wi-Fi services (data
services), at least one sample for each of 5x5 meter or less size of tile size will be collected as
far as feasible for respective service provider. For example, if the total public area of the
property is 10000 square meters, then a minimum of 400 samples in each day are to be
collected for relevant parameter. TRAI App shall be used for the testing of coverage and
download speeds. To calculate the download speeds for mobile and Wi-Fi services, all the
download speed samples shall be arranged in descending order (starting highest download
speed recorded during entire assessment period) and the 80th percentile value, arrived after
such arrangement, shall be considered the minimum download speed. For illustration, if a
total of 1200 samples have been collected during the assessment period, then these values
shall be arranged in descending order and 1200*0.8=960th value of download speed shall be
taken as minimum download speed for the mobile or Wi-Fi service.
137For assessment of voice service performance, a structured and repeatable methodology shall
be followed to measure key parameters. During the assessment, one test device (call
terminating) will be placed at a fixed location in the property and other device (call
originating) shall be used for sample collection around different areas of the property as per
sampling methodology. Each test call shall begin with dial initiation, and a maximum of 15
seconds shall be allowed for the call to be successfully established. Calls not connected within
this duration shall be recorded as failed attempts. For calls that are successfully established,
the call shall be maintained for a duration of 90 to 120 seconds to observe call stability and
identify any premature disconnections. After completion of the call duration, the call shall be
normally terminated. A wait time of 15 seconds shall be observed before initiating the next
call. This process shall be repeated in accordance with the sampling plan. The same
methodology shall be referred to in the subsequent sections where Call Setup Time, Call
Setup Success Rate, and Call Drop Rate are defined and calculated. The DCRA shall use
industry-standard tools for assessment of voice service performance. Further, DCRA must
ensure using the same tool for evaluating all service providers within a property to assess
voice service performance.
Figure 4.1: Call Flow for measuring Voice services performance
4.8.1. Sub-Criteria: Mobile network coverage and performance in public areas
of property
(Weightage – 6)
i. Objective: The mobile network performance in public areas (e.g., common area,
lobbies, corridors, lifts, basements) should meet minimum requirements for signal
strength and speed which is essential for superior user experience, safety, and
efficient operations.
ii. Assessment Methodology:
a. Conduct RF testing for mobile coverage in public spaces like lobbies, corridors,
common utilities like gym, banquet hall, garden, parking, lifts, basements, and
entrances using industry standard tools.
b. Assess data speed and voice call quality over minimum three days (preferably 10
am to 8 pm with samples uniformly distributed covering peak hours [10 am to
12 noon and 6 pm to 8 pm] in property) using prescribed methodology for each
138service provider whose coverage is available on the property and accounted
under criteria ‘4.7- Availability of Service Providers’. Measurements to be
carried out shall include peak as well as off-peak hours.
c. The call setup time, call setup success rate and call drop rate, for voice services,
will be measured as per the measurement methodology prescribed in section
4.8.1. ii. d. Number of test samples and methodology shall be as prescribed in
section 4.8 above.
d. The following methodology shall be used for calculating call setup success rate,
call drop rate and call setup time:
1. Call setup success rate: Call Setup Success Rate is defined as the ratio of
Established Calls to Call Attempts. ‘Established Calls’ mean the following
events have happened in call setup:
(a) Call attempt is made
(b) The signaling channel is allocated
(c) The call is routed to the outwards path of the terminating network
(d) An alert signal is received by caller in the form of ring back tone, busy
tone, or an announcement.
CSSR = (Total Call Established/ Total Call Attempt) *100
2. Call Drop rate: Call drop represents the service provider network’s ability
to maintain a call once it has been successfully established. This parameter
shall include both incoming calls and outgoing calls which, once they have
been established and have an assigned traffic channel/ bearer, are dropped,
or interrupted before their normal completion by the user, the cause of the
early termination being within the service provider’s network
Call Drop Rate = (Total Call Drop/Total Call Established) *100
3. Call setup time: Time taken from call initiate to call alerting/ringing.
Call Setup Time = T2- T1
T2- Ringing (VoLTE/VoNR),
T1- Invite (VoLTE/VoNR)
iii. Supporting documents
1. Walk/drive test results and/or RF coverage map of public areas
2. Speed test logs and call setup time, call setup success rate and call drop
rate reports.
139iv. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
Compliance
S. No. Item description requirement (Upload/
(Yes/ No)
DCRA level)
Walk/drive test results
1. and/or RF coverage map Record and Upload
of public areas
Speed test logs, call setup
2. time, call setup success Record and Upload
rate and call drop rate
Speed and coverage
samples mapped on the
3. Record and Upload
Layout maps
(floors/areas)
Table 4.42: Compliance checklist
v. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
Part A
If at least 3 service providers individually have overall
more than 85% mobile coverage (RSRP ≥ -110 dBm) for
4G/5G services in public areas (including common area,
1. 4
lifts, and basements), with minimum download speed of
10Mbps for 4G or 100 Mbps for 5G technology as
applicable.
If at least two service providers individually have overall
more than 85% mobile coverage (RSRP ≥ -110 dBm) for
4G/5G services in public areas (including common area,
2. 3
lifts, and basements), with minimum download speed of
10Mbps for 4G or 100 Mbps for 5G technology as
applicable.
140S. No. Score Compliance Requirement
If at least one service provider has more than 85%
mobile coverage (RSRP ≥ -110 dBm) for 4G/5G services
3. 2 in public areas (including common areas, lifts, and
basements), with minimum download speed of 10Mbps
for 4G or 100 Mbps for 5G technology as applicable.
Part B
If call drop rate ≤ 2% and call setup success rate ≥ 98%
1. 2
for each service provider
If call drop rate ≤ 2% or call setup success rate ≥ 98%
2. 1
for each service provider
Note 1: Refer methodology in Section 4.8 for calculation of minimum download
speed.
Note 2: This sub-criterion is evaluated in two parts — Part A and Part B. The
property shall be assessed separately under each part. The overall score for this
sub-criterion shall be the sum of the scores awarded in Part A and Part B.
Table 4.43: Scoring criteria
4.8.2. Sub-Criteria: Secure public Wi-Fi network coverage and performance in
public areas of property
(Weightage – 4)
i. Objective: Public Wi-Fi in the property may complement the mobile coverage.
However, it should be secure and offer a high level of performance, with fast speeds
and low latency. With secure and seamless public Wi-Fi coverage in the property,
consumers can avail the data and voice service. The assessment shall include
evaluating its Wi-Fi network availability, security measures in place, speed, and
latency required for reliable digital connectivity.
ii. Assessment Methodology
a. Identify all public areas within the property where Wi-Fi services are provided,
such as lobbies, lounges, cafeterias, parking areas, lifts, basements, and open
seating spaces.
b. Conduct sample WPA2/ WPA3 compliance checks for security.
c. Conduct speed and latency tests covering peak hours (10 am to 12 noon and 6 pm
to 8 pm) over minimum three days (preferably 10 am to 8 pm) using industry
standard tools using prescribed methodology.
141iii. Supporting documents
1. Speed Test Results: Logs of speed and latency test results from various
locations and times, demonstrating network reliability.
2. Wi-Fi Security Audit Reports: Reports confirming compliance with
WPA2/WPA3 security standards, network authentication mechanisms, and
encryption configurations.
iv. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Wi-Fi speed test
1. Record and Upload
results
Wi-Fi security audit
2. Record
reports
Speed samples
3. mapped on the Layout Record and Upload
maps (floors/areas)
Table 4.44: Compliance checklist
v. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S.
Score Compliance Requirement
No.
If minimum download speed of 20 Mbps is available
1. 4 from Wi-Fi in public or common area of the property
(including lifts and basements).
If minimum download speed of 10 Mbps is available
2. 2 from Wi-Fi in public or common area of the
property (including lifts and basements).
Note: Refer methodology in Section 4.8 for calculation of minimum download
speed.
Table 4.45: Scoring criteria
1424.8.3. Sub-Criteria: Mobile network coverage and performance in non-public
areas
(Weightage – 5)
i. Objective: The mobile network should maintain high performance in private or
restricted areas, such as residential flats, offices, conference rooms, executive cabins
etc. within a property. The objective of this criterion is to assess the availability of
mobile network coverage in private areas of the property.
ii. Assessment Methodology
a. Conduct RF testing for mobile coverage in pre-defined non-public areas using
industry standard tools.
b. Assess data speed and voice call quality over minimum three days (preferably 10
am to 8 pm with samples uniformly distributed covering peak hours [10 am to 12
noon and 6 pm to 8 pm] in property) using prescribed methodology for each
service provider whose coverage is available on the property and accounted
under criteria ‘4.7- Availability of Service Providers’. Measurements to be carried
out shall include peak as well as off-peak hours.
c. The call setup time, call setup success rate and call drop rate, for voice services,
will be measured as per the measurement methodology prescribed in section
4.8.3. ii. d. Number of test samples and methodology shall be as prescribed in
section 4.8 above.
d. The following methodology shall be used for calculating call setup success rate,
call drop rate and call setup time:
1. Call setup success rate: Call Setup Success Rate is defined as the ratio of
Established Calls to Call Attempts. ‘Established Calls’ mean the following
events have happened in call setup:
(a) Call attempt is made
(b) The signaling channel is allocated
(c) The call is routed to the outwards path of the terminating network
(d) An alert signal is received by caller in the form of ring back tone, busy
tone, or an announcement.
CSSR = (Total Call Established/ Total Call Attempt) *100
1432. Call Drop rate: Call drop represents the service provider network’s ability
to maintain a call once it has been successfully established. This parameter
shall include both incoming calls and outgoing calls which, once they have
been established and have an assigned traffic channel/ bearer, are dropped,
or interrupted before their normal completion by the user, the cause of the
early termination being within the service provider’s network
Call Drop Rate = (Total Call Drop/Total Call Established) *100
3. Call setup time: Time taken from call initiate to call alerting/ringing.
Call Setup Time = T2- T1
T2- Ringing (VoLTE/VoNR),
T1- Invite (VoLTE/VoNR)
iii. Supporting documents
1. Walk/drive test results and/or RF coverage map of the area under test
2. Speed test logs and call setup time, call setup success rate and call drop rate
reports.
iv. Compliance check list: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Walk/drive test results
and/or RF coverage
1. Record and Upload
map of the area under
test
Speed test logs, call
setup time, call setup
2. Record and Upload
success rate and call
drop rate
Speed and coverage
samples mapped on
3. Record and Upload
the Layout maps
(floors/areas)
Table 4.46: Compliance checklist
144v. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
Part A
If at least 3 service providers individually have overall more
than 80% mobile coverage (RSRP ≥ -110 dBm) for 4G/5G
1. 4 services in non-public areas, with minimum download speed
of 10Mbps for 4G or 100 Mbps for 5G technology as
applicable.
If at least 2 service providers individually have overall more
than 70% mobile coverage (RSRP ≥ -110 dBm) for 4G/5G
2. 3 services in non-public areas, with average minimum
download speed of 10Mbps for 4G or 100 Mbps for 5G
technology as applicable.
If at least 2 service providers individually have overall more
than 50% mobile coverage (RSRP ≥ -110 dBm) for 4G/5G
3. 2 services in non-public areas, with average minimum
download speed of 10Mbps for 4G or 100 Mbps for 5G
technology as applicable.
Part B
If call drop rate ≤ 2% and call setup success rate ≥ 98% for
1. 1
each service provider
If call drop rate ≤ 2% or call setup success rate ≥ 98% for
2. 0.5
each service provider
Note 1: Refer methodology in Section 4.8 for calculation of minimum download
speed.
Note 2: This sub-criterion is evaluated in two parts — Part A and Part B. The
property shall be assessed separately under each part. The overall score for this
sub-criterion shall be the sum of the scores awarded in Part A and Part B.
Table 4.47: Scoring criteria
1454.8.4. Sub-Criteria: Secure public Wi-Fi network coverage and performance
in non-public areas
(Weightage – 5)
i. Objective: Public Wi-Fi in the property may complement the mobile coverage.
However, it should be secure and offer a high level of performance, with fast speeds
and low latency. With secure and seamless public Wi-Fi coverage in the property,
consumers can avail the data and voice service. The goal is to assess Wi-Fi coverage
in non-public areas, such as residential flats, enterprise workspaces, executive
offices, conference rooms, etc. These areas require reliable, high-speed, and
encrypted Wi-Fi connectivity to support business operations, data security, and
seamless enterprise communication.
ii. Assessment Methodology:
To evaluate compliance with this sub-criterion, the following steps will be
undertaken:
a. Identify all non-public areas within the property where Wi-Fi services are
provided.
b. Conduct sample WPA2/ WPA3 compliance checks for security.
c. Conduct speed and latency tests covering peak hours (10 am to 12 noon and 6 pm
to 8 pm) over minimum three days (preferably 10 am to 8 pm) using industry
standard tools using prescribed methodology.
iii. Supporting documents:
a. Speed Test Results: Logs of speed and latency test results from various
locations and times, demonstrating network reliability.
b. Wi-Fi Security Audit Reports: Reports confirming compliance with WPA2/
WPA3 security standards, network authentication mechanisms, and encryption
configurations.
iv. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/ DCRA
No. (Yes/ No)
level)
Wi-Fi security
1. Record
certifications
146Record maintenance
S. Compliance
Item description requirement (Upload/ DCRA
No. (Yes/ No)
level)
Wi-Fi speed test
2. Record and Upload
results
Speed samples
mapped on the
3. Record and Upload
Layout maps
(floors/areas)
Table 4.48: Compliance checklist
v. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S.
Score Compliance Requirement
No.
If minimum download speed of 20 Mbps is available from
1. 5
Wi-Fi in non-public area of the property
If minimum download speed of 10 Mbps is available from
2. 3
Wi-Fi in non-public area of the property
If minimum download speed of < 10 Mbps and > 2 Mbps
3. 2
is available from Wi-Fi in non-public area of the property
Note: Refer methodology in Section 4.8 for calculation of minimum download
speed.
Table 4.49: Scoring criteria
4.8.5. Sub-Criteria: Average download speed of different wireline network(s)
in respective highest speed plan
(Weightage – 5)
i. Objective: The objective of this sub-criterion is to assess the highest average
download speed supported by different wireline networks or service providers under
their offered plans in the property.
ii. Assessment Methodology:
a. Conduct speed tests using standard tools (TRAI App). Conduct tests during the
prescribed time window (preferably 10 am to 8 pm) including peak traffic
hour(s) (10 am to 12 noon and 6 pm to 8 pm) at least at five different user
locations distributed across the property as far as possible. Minimum five test
sample per location shall be collected.
147b. To calculate the average download speeds, all the download speed samples shall
be arranged in descending order (starting highest download speed recorded
during entire assessment period) and the 90th percentile value, arrived after
such arrangement, shall be considered the average download speed. For
illustration, if a total of 120 samples have been collected during the assessment
period, then these values shall be arranged in descending order and
120*0.9=108th value of download speed shall be taken as average download
speed.
c. Supporting documents: Speed test results with timestamps.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Speed test results
1. Record and Upload
with timestamps
Speed samples
mapped on the
2. Record and Upload
Layout maps
(floors/areas)
Table 4.50: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S.
Score Compliance Requirement
No.
If download speed of any two wireline network is more
1. 5
than 500 Mbps as calculated above [section 4.8.5 ii. b.]
If the download speed of any two wireline network is more
2. 4
than 250 Mbps as calculated above [section 4.8.5 ii. b.]
If the download speed of any two wireline network is more
3. 3
than 100 Mbps as calculated above [section 4.8.5 ii. b.]
If the download speed of any two wireline network is more
4. 2
than 50 Mbps as calculated above [section 4.8.5 ii. b.]
Table 4.51: Scoring criteria
1484.9. User Experience
(Weightage – 5)
User experience assesses user feedback on digital connectivity, including network reliability,
speed, latency, and ease of access. It considers factors like seamless browsing, streaming
quality, and minimal disruptions. A positive experience indicates robust connectivity, while
frequent issues highlight areas for improvement.
4.9.1. Sub-Criteria: User feedback on digital connectivity experience
(Weightage – 5)
i. Objective: The objective of this sub-criterion is to collect and analyze user feedback
regarding their experience with mobile, wireline, and Wi-Fi services in a property.
User insights help assess the real-world performance of the digital connectivity
infrastructure, identify gaps in service quality and drive improvements to enhance
the overall connectivity experience.
ii. Assessment Methodology:
a. Conduct structured surveys capturing user satisfaction on voice call quality, voice
call accessibility, voice call retainability, data speed (wireline and wireless),
latency, service uptime and coverage.
b. The feedback should be collected from a minimum of 10% of the users of the
property if the total users are less than 1000. In case total users are more than
1000, then feedback may be collected from a minimum of 100 users. The users
in survey should be distributed across gender and broad adult age groups.
iii. Supporting documents:
a. User feedback form (please refer to Appendix section for the indicative feedback
form).
iv. Compliance check list: The DCRAs shall prepare and maintain the compliance
summary in the following format.
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
1. User feedback form Record and Upload
Table 4.52: Compliance checklist
149v. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If 80% of users provide overall positive experience for
1. 5
digital connectivity in the property
If 70% of users provide overall positive experience for
2. 4
digital connectivity in the property
If 60% of users provide overall positive experience for
3. 3
digital connectivity in the property
If 50% of users provide overall positive experience
4. 2
for digital connectivity in the property
If 40% of users provide overall positive experience for
5. 1
digital connectivity in the property
Table 4.53: Scoring criteria
Note: Overall positive experience refers to the user feedback provided in the form
prescribed under Appendix 11.4 of this Manual. In this context, if a user has rated
the Overall Experience as 4 or higher, the experience shall be considered as
positive.
Note: In case of new property, where actual end users are yet to use services, the weightage
against ‘User Experience’ shall be merged with ‘Service Performance’ and will be distributed
equally among each sub-criterion. For instance, the complete weightage of ‘User Experience’
i.e. 5 will be distributed equally (1 each) among 5 sub-criteria of ‘Service Performance’.
Considering an example of 4.8.5 (Average download speed of different wireline network(s)
in respective highest speed plan), the maximum scoring in such scenario would change to 6.
Accordingly, the scores of scoring criteria (Table 4.51) will be updated to 6,5,4,3 for S. No.
1,2,3,4 respectively. Similar change will be incorporated for sub-criteria 4.8.2,4.8.4 and 4.8.5
of Section 4.8 (Service Performance) where score of each scoring criteria will be incremented
by 1. For sub-criteria 4.8.1 and 4.8.3, similar change will be incorporated for scoring in Part
A only i.e. scoring of Part B will remain the same.
1504.10. Summary of Rating Score
After assessment and scoring against each criterion and sub-criteria as per assessment
methodology, the DCRA shall prepare the summary of rating score in following format for
final updating in the rating platform for generating the rating certificate. It is to be noted that
the scores against each sub-criteria will be awarded strictly as per the scoring criteria given
above.
Score
Sub
awarded
Criteria Criteria Weightage Sub-Criteria Criteria
by
No. Weightage
DCRA
[a] [b] [c] [d]
[e]
Compliance to
applicable
4.1.1 Approved DCI
Model Building 2.5
design
Bye Laws
(MBBL) and
4.1 5
National
4.1.2 DCI
Building Code
implementation as
(NBC) for 2.5
per approved DCI
digital
design
connectivity
4.2.1 Provision for
expansion of telecom
Provision in 2
rooms and cable
civil
pathways
infrastructure,
4.2.2 Provision for
over and above
expansion of mobile
4.2 MBBL and NBC 5 2
and wireline
requirements,
connectivity
for ensuring
4.2.3 Ease of access
robust digital
of DCI installed for
connectivity 1
repair or
maintenance
Provision in 4.3.1 Redundancy of
1
power power source
infrastructure, 4.3.2 UPS power
2
4.3 over and above 5 backup for DCI
MBBL or NBC 4.3.3 Power
requirements, continuity 1
for ensuring monitoring
151Score
Sub
awarded
Criteria Criteria Weightage Sub-Criteria Criteria
by
No. Weightage
DCRA
[a] [b] [c] [d]
[e]
reliable digital 4.3.4 Building
1
connectivity Management System
4.4.1 Availability of
alternate entry paths
for digital 3
connectivity
infrastructure
Digital
Connectivity 4.4.2 Non-flooding
4.4 10
Infrastructure measures for DCI 3
Resilience installation
4.4.3.Implementation
of redundancy in
4
power source and
DCI paths
4.5.1 Availability of
the latest generation
4
Future of mobile
Readiness of connectivity
4.5 Digital 10
4.5.2 Support for
3
Connectivity
future bands
Infrastructure
4.5.3 Upgradability of
3
wireline DCI
4.6.1 Backhaul fiber
connectivity (service 10
provider to property)
Provision of 4.6.2 Fiber
Wired connectivity till user 5
4.6 20
Connectivity premises
infrastructure
4.6.3 Fiber
connectivity in each
5
room or office or
commercial space
152Score
Sub
awarded
Criteria Criteria Weightage Sub-Criteria Criteria
by
No. Weightage
DCRA
[a] [b] [c] [d]
[e]
4.7.1 Number of
wireline Internet
Service providers
having integration 7.5
with Digital
Connectivity
Availability of
Infrastructure
4.7 Service 15
4.7.2 Number of
Providers
Mobile Service
providers having
coverage or 7.5
integration with
Digital Connectivity
Infrastructure
4.8.1 Mobile network
coverage and
performance in 6*
public areas of
property
4.8.2 Secure public
Wi-Fi network
Service
4.8 25 coverage and
Performance 4*
performance in
public areas of
property
4.8.3 Mobile network
coverage and
5*
performance in non-
public areas
153Score
Sub
awarded
Criteria Criteria Weightage Sub-Criteria Criteria
by
No. Weightage
DCRA
[a] [b] [c] [d]
[e]
4.8.4 Secure public
Wi-Fi network
coverage and 5*
performance in non-
public areas
4.8.5 Average
download speed of
different wireline
5*
network(s) in
respective highest
speed plan
4.9.1 User feedback
User on digital
4.9 5 5#
Experience connectivity
experience
* In case of new property, where actual end users are yet to use services, these weightages
will be incremented by 1.
# In case of new property, where actual end users are yet to use services, this weightage
will be considered as 0.
Table 4.54: Summary of Rating Score
1545. Assessment Methodology for Category ‘B’ Properties
The regulation 25 under Section – VII “Rating criteria and process for evaluation of digital
connectivity and award of ratings” of the Regulation provides criteria, weightage and high-level
sub-criteria against each main criterion as indicated in column [a], [b], and [c] respectively in
Table 5.1. To enable uniform and objective assessment against each sub-criteria, the sub-
criteria weightage shall be as provided in column [d]. The sub-criteria weightage has been
arrived, factoring their relative importance for assessment of digital connectivity and
associated infrastructure for properties under Category ‘B’.
Sub
Criteria Criteria Weightage Sub-Criteria Criteria
No. Weightage
[a] [b] [c] [d]
5.1.1 Redundancy of power source 2
Provision in
power
5.1.2 UPS power backup for DCI 4
infrastructure
5.1 for ensuring 10
reliable
5.1.3 Power continuity monitoring 2
digital
connectivity
5.1.4 Building Management
2
System
5.2.1 Availability of alternate entry
paths for digital connectivity 3
infrastructure
Digital
Connectivity 5.2.2 Non-flooding measures for
5.2 10 3
Infrastructure DCI installation
Resilience
5.2.3 Implementation of
redundancy in power source and 4
DCI paths
5.3.1 Availability of the latest
4
Future generation of mobile connectivity
Readiness of
5.3 Digital 10 5.3.2 Support for future bands 3
Connectivity
Infrastructure
5.3.3 Upgradability of wireline DCI 3
155Sub
Criteria Criteria Weightage Sub-Criteria Criteria
No. Weightage
[a] [b] [c] [d]
5.4.1 Backhaul fibre connectivity
10
(service provider to property)
Provision of
Wired 5.4.2 Fibre connectivity till user
5.4 20 5
Connectivity premises
infrastructure
5.4.3 Fibre connectivity in each
5
room or office or commercial space
5.5.1 Number of wireline Internet
Service providers having
7.5
integration with Digital
Availability of Connectivity Infrastructure
5.5 Service 15
5.5.2 Number of Mobile Service
Providers
providers having coverage or
7.5
integration with Digital
Connectivity Infrastructure
5.6.1 Mobile network coverage and
performance in public areas of
6
property
5.6.2 Secure public Wi-Fi network
coverage and performance in 4
public areas of property
Service 5.6.3 Mobile network coverage and
5.6 25 5
Performance performance in non-public areas
5.6.4 Secure public Wi-Fi network
coverage and performance in non- 5
public areas
5.6.5 Average download speed of
different wireline network(s) in
5
respective highest speed plan
User 5.7.1 User feedback on digital
5.7 10 10
Experience connectivity experience
Table 5.1: Weightage for different sub-criteria for category ‘B’ properties
156The Digital Connectivity Rating Agency (DCRA) shall assess the digital connectivity and
associated infrastructure as per provisions of the Regulations. The assessment methodology
against each sub-criterion is provided in the following sections. The DCRA shall scrupulously
follow the assessment methodology and collect the artifacts, evidence or test results as
prescribed against respective sub-criteria under each main criterion. The required supporting
documents shall be preserved by the DCRA or uploaded to the rating platform as per the
requirement of the regulations, guidelines or rating manual issued or amended from time to
time. For awarding the score against each sub-criteria, ‘scoring criteria’ tables have been
provided in the following sections. A property can be awarded only one out of the given scores
in ‘scoring criteria’ table meeting the relevant compliance requirement as prescribed.
5.1. Provision in Power Infrastructure for Ensuring Reliable Digital
Connectivity
(Weightage – 10)
This criterion evaluates provisions in power infrastructure to ensure uninterrupted and
reliable power supply for digital connectivity.
5.1.1. Sub-Criteria: Redundancy of power source
(Weightage – 2)
i. Objective: The redundant power sources are essential for reliable operation of
digital connectivity. Under this sub-criterion, the availability of redundancy in power
sources is assessed to ensure that DCI remain operational even during power
failures. This redundancy may include backup generators or alternative power
systems.
ii. Assessment Methodology:
a. Verification of actual peak load and available capacity of redundant
power source:
1. Verify the availability of redundant power source for DCI.
2. Verify whether all key DCI and systems are on redundant power source like
alternate feeder or separate power generator.
b. Power Source Switching Tests: Check the functionality of the automatic
switchover mechanism between primary and backup power sources on a sample
basis.
c. Supporting documents:
1. Power layout diagrams.
2. DCI load switchover test report.
157d. Documentation Review: Verify the power layout diagrams, load test reports
submitted by the property manager.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
1. Power layout diagrams Record and Upload
Load switchover testing
2. Record and Upload
reports
Table 5.2: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If all digital connectivity services affecting load is
1. 2
supported/ fed by redundant power source
Table 5.3: Scoring criteria
5.1.2. Sub-Criteria: UPS power backup for DCI
(Weightage – 4)
i. Objective: The continuity of power supply is essential for uninterrupted digital
connectivity and Uninterrupted Power Supply (UPS) systems play an important role
in service availability for any telecom or information and communication technology
system. This sub-criterion will assess the availability and robustness of power
backup system in case of failure of input sources i.e. commercial power and
generator supply.
ii. Assessment Methodology
a. UPS backup verification for DCI:
1. Check from the line diagram whether all DCI systems are provided with UPS
backup.
2. Verify the DCI system rated load and correspond UPS power capacity
provided for DCI from commissioning reports or other authentic documents
to calculate the provisioned UPS backup time.
3. Check the availability of UPS system redundancy by way of load sharing
among multiple UPS if applicable.
4. Sample test the UPS system’s ability to provide uninterrupted power to the
DCI by simulating input power failure.
158b. Supporting documents:
1. Electrical system line diagram for key DCI elements including redundant
input sources and UPS system(s).
2. Test reports of UPS power backup time or other supporting document(s) with
full DCI load and other load if any.
iii. Compliance check list: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record
maintenance
Compliance
S. No. Item description requirement
(Yes/ No)
(Upload/ DCRA
level)
Electrical system line diagram
1. including redundant input Record and Upload
sources and UPS system(s)
Whether all key DCI systems
2. affecting service availability are Record
on UPS?
Whether UPS system has
3. Record
redundancy?
UPS switch over successfully
4. Record
tested during sample testing?
Whether duration of UPS
5. backup matches with available Record and Upload
test reports with full DCI load?
Table 5.4: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
UPS power backup for important DCI components > 3
1. 4
Hrs.
UPS power backup for important DCI components is ≥1
2. 2
and ≤3 Hrs.
Table 5.5: Scoring criteria
1595.1.3. Sub-Criteria: Power continuity monitoring
(Weightage – 2)
i. Objective: The power supply monitoring system plays an important role in
ensuring the power supply continuity to DCI. If the health of power systems like
generator or UPS or switch gear systems is not monitored on a continuous basis, it
may result in major interruption when input commercial power supply fails.
Therefore, this sub-criterion provides special emphasis on the implementation of
monitoring system in the property for power services.
ii. Assessment Methodology
a. Verification of Monitoring Dashboards: Verify availability of dashboards
or interfaces showing real-time power status, health status of UPS, generator(s),
alerts, and reports/alerts in case of power failures.
b. Validation of Automated Alerts: Test alert mechanisms for their ability to
notify maintenance team of power anomalies in real time.
c. Supporting documents: Monitoring system screenshots with alerts generated
during testing.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Monitoring system high
1. Record and Upload
level diagram
Capture monitoring
2. system dashboard Record and Upload
screenshot
Table 5.6: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as per
the following scoring criteria:
S. No. Score Compliance Requirement
The dashboard covers end-to-end health status
1. 2
monitoring of all power systems
The dashboard covers end-to-end health status
2. 1 monitoring of important power systems which may
affect DCI availability
Table 5.7: Scoring criteria
1605.1.4. Sub-Criteria: Building Management System
(Weightage – 2)
i. Objective: While power monitoring system manages power related installations,
building management system (BMS) encompasses monitoring of major building
services like fire alarms, access control, Heating, Ventilation Air conditioning
(HVAC), power systems etc. These facilities may affect the performance and
availability of DCI and digital connectivity services. Thus, availability of BMS in the
property enhances the DCI service availability and continuity. Therefore, this sub-
criterion has been incorporated as a part of assessment for an enabling system for
digital connectivity services.
ii. Assessment Methodology:
a. Real-Time Data Integration Tests: Verify that the DCI power, fire alarms
and HVAC management system is integrated with the BMS to provide centralized
control and monitoring for DCI systems.
b. BMS communication and notification validation: Validate that the BMS
receives accurate input data from related sensors or actuators and disseminates
to the operations team in configured timelines.
c. Supporting documents:
1. BMS system high level diagram for DCI system areas of the property.
d. Documentation Review:
1. Verify the BMS screenshots against system diagrams.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
Compliance
S. No. Item description requirement (Upload/
(Yes/ No)
DCRA level)
BMS system architecture
1. Record and Upload
diagrams
Test report on DCI power
systems, fire alarms and
2. Record and Upload
HVAC integration with
BMS
161Record maintenance
Compliance
S. No. Item description requirement (Upload/
(Yes/ No)
DCRA level)
Sample test report on
detection and notification
3. of main power supply Record and Upload
failure and takeover by
generator/ UPS for DCI
Table 5.8: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
On availability of BMS integration covering
1. 2 power, fire alarm and HVAC for telecom
room(s)/telecom area(s) in the property
On availability of BMS integration covering at
least two out of, power, fire alarm and HVAC
2. 1
for telecom room(s)/telecom area(s) in the
property
Table 5.9: Scoring criteria
5.2. Digital Connectivity Infrastructure Resilience
(Weightage – 10)
Digital connectivity infrastructure (DCI) resilience is a critical factor in ensuring
uninterrupted and high-quality digital connectivity for properties. Resilience refers to the
ability of the infrastructure to withstand disruptions, minimize downtime, and provide
redundancy in case of failures or network congestion.
5.2.1. Sub-Criteria: Availability of alternate entry paths for digital connectivity
infrastructure
(Weightage – 3)
i. Objective: To assess the availability of alternate external entry paths in the
property. The alternate entry paths enable the service providers to extend digital
connectivity with route diversity which reduces the service disruptions in case of
fault in one segment of the network ring including any damage within the property.
The availability of route diversity up to the telecom rooms/telecom areas is an ideal
scenario.
162ii. Assessment Methodology:
a. Physical verification as per design documents:
1. Examine on-site layouts for ducts from the entry points and cable pathways
to confirm the availability of alternate entry paths for DCI in the property.
2. Sufficient capacity for multiple service providers.
b. Supporting documents: Ducts and pathway layout diagrams to verify the
availability on site.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record
maintenance
S. Compliance
Item description requirement
No. (Yes/ No)
(Upload/ DCRA
level)
Ducts layout diagrams from
1. different external entry points for Record and Upload
fiber/ DCI
Pathway layout diagrams from
2. ducts to telecom room(s)/telecom Record and Upload
area(s) for fiber/ DCI
Table 5.10: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
Availability of alternate duct from property entry point and
1. 3
cable pathway routes till telecom room(s)/telecom area(s)
Availability of alternate duct from property entry point till
2. 2
telecom room(s)/telecom area(s)
Availability of alternate cable pathway routes from
3. 1 common location in property till telecom room(s)/telecom
area(s)
Table 5.11: Scoring criteria
1635.2.2. Sub-Criteria: Non-flooding measures for DCI installation
(Weightage – 3)
i. Objective: Flooding can cause significant damage to digital connectivity
infrastructure and disruption in digital connectivity. Measures like raised
installations, waterproof enclosures, and drainage systems may prevent flooding of
key DCI elements. This sub-criterion intends to the implementation of non-flooding
measures in the property to protect the DCI.
ii. Assessment Methodology:
a. Site Inspection:
1. Check with the site layout and actual location of telecom rooms/telecom area
if they are located on higher floors, away from potential flooding zones like
basements or ground floors.
2. Verify that power equipment like generator set, UPS, switch over panels are
installed on raised platforms or locations which are less susceptible to
flooding.
3. Verify that no water drain system is connected to the DCI rooms/telecom
rooms/telecom areas which can cause backflow.
b. Drainage System Review: Check the availability of drainage systems with
functional checks to prevent backflow of floodwaters.
c. Supporting documents:
1. Design and layout documentation to review infrastructure layouts to verify
that flood prevention measures align with best practices.
2. Sample photographic evidence for key DCI system as proof of
implementation.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance requirement
Item description
No. (Yes/ No) (Upload/ DCRA
level)
Site photos of whether DCI/
telecom room(s)/telecom
1. area(s) are above ground Record and Upload
floor as per design and
implementation?
164Record maintenance
S. Compliance requirement
Item description
No. (Yes/ No) (Upload/ DCRA
level)
Site photos of whether key
power systems like UPS/
Generators for DCI are
2. Record and Upload
installed on ground or higher
floor with non-flooding
consideration?
Site photos of whether
drainage system is
3. Record and Upload
implemented as per design
layout?
Table 5.12: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
Telecom/DCI room(s)/telecom area(s) and UPS are
1. 3 above ground floor and generators/ switching panels
are installed with non-flooding considerations
Only telecom/DCI room(s)/telecom area(s) is
implemented above ground floor and backup power
2. 2
system (UPS) is implemented with non-flooding
measure
If telecom/DCI room(s)/telecom area(s) and
3. 1 generator system is implemented with non-flooding
consideration
Table 5.13: Scoring criteria
5.2.3. Sub-Criteria: Implementation of redundancy in power source and DCI
paths
(Weightage – 4)
i. Objective: The redundant pathways for power and fiber cables inside the property
provide path diversity in extending digital connectivity within and across the floor
or building blocks. Redundancy should be applied to both the power supply and the
connectivity pathways for ensuring that the DCI through other path can take over
without impacting digital connectivity.
165ii. Assessment Methodology:
a. Redundancy Verification:
1. Review the DCI for the presence of at least two independent power sources
(e.g., main power grid and backup generators or UPS).
2. Examine the availability of path diversity for fiber or other cables across the
building blocks, basements, and towers from telecom/digital connectivity
infrastructure room(s)/telecom area(s).
3. Verify that digital connectivity till key aggregation points is supported by a
minimum of two physically separated paths.
b. Supporting documents:
1. Power and cable layout for DCI indicating path redundancy.
2. Sample test reports demonstrate that actual redundancy performance has
been tested during commissioning.
c. Documentation Review:
1. Verify power and cable layout diagram for DCI indicating path redundancy
with actual implementation.
2. Validate test reports to confirm that redundancy mechanisms function as
intended.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record
maintenance
S. Compliance
Item description requirement
No. (Yes/ No)
(Upload/ DCRA
level)
Whether DCI is supported
1. with redundant power Record
sources (Generator/UPS)?
Whether power system
network layout for DCI is
2. Record and Upload
implemented with path
diversity?
Whether sample test reports
3. demonstrate testing of Record and Upload
redundancy?
166Record
maintenance
S. Compliance
Item description requirement
No. (Yes/ No)
(Upload/ DCRA
level)
Whether path diversity for
fiber and other cables (DTH/
ethernet as applicable) across
the building blocks,
4. basements and towers from Record and Upload
telecom/digital connectivity
infrastructure
room(s)/telecom area(s) is
implemented?
Table 5.14: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If redundant paths are implemented for power
1. 4
system to DCI and fiber path in the property
If either the power system to DCI or the fiber path
2. 2
incorporate path redundancy
Table 5.15: Scoring criteria
5.3. Future Readiness of Digital Connectivity Infrastructure
(Weightage – 10)
Future readiness in digital connectivity infrastructure ensures that properties are equipped
to support next-generation telecom technologies, evolving connectivity needs and increasing
data demands. Future-ready property may be considered to have been designed to adapt,
scale, and integrate upcoming innovations in digital connectivity, enabling seamless
adoption of emerging technologies like 5G, advanced Wi-Fi and smart building solutions.
5.3.1. Sub-Criteria: Availability of the latest generation of mobile connectivity
(Weightage – 4)
i. Objective: The infrastructure should be equipped to support the latest generation
of mobile connectivity, such as 4G/5G and future network standards, to ensure
high-speed, low-latency, and reliable communication. The availability of advanced
mobile infrastructure significantly impacts digital connectivity performance and
user experience. This sub-criterion focuses on assessing whether a property has the
necessary infrastructure to support current and next-generation mobile networks
and is future-ready for upcoming technologies.
167ii. Assessment Methodology:
a. Inspection of latest technology installed Infrastructure:
1. Physical Verification: Inspect the property’s mobile network
infrastructure, providing coverage to the property including distributed
antenna systems (DAS), and backhaul connectivity.
2. Technology Support: Evaluate if the installed infrastructure is sufficient
to provide coverage in the different areas of the property.
b. Technical Validation:
1. Cross-check compatibility with current frequency bands with different
service providers for latest/ current technology.
c. Supporting documents:
1. List of the latest generation mobile connectivity equipment’s installed in the
property.
2. Photographs of installed latest generation mobile connectivity equipment.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Whether the equipment
installed supports the
1. Record
latest generation of
mobile connectivity?
Photographs of installed
2. latest generation mobile Record and Upload
connectivity equipment
Table 5.16: Compliance checklist
168iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S.
Score Compliance Requirement
No.
If equipment like DAS, RRU, Base Station, etc.
1. 4 supporting 5G and 4G technology are installed in the
property for mobile connectivity
If equipment like DAS, RRU, Base Station, etc.
2. 2 supporting 4G or 5G technology are installed in the
property for mobile connectivity
Table 5.17: Scoring criteria
5.3.2. Sub-Criteria: Support for future bands
(Weightage – 3)
i. Objective: To ensure long-term relevance and adaptability, digital connectivity
infrastructure must be designed to support the integration of future wireless
communication bands and evolving wired and mobile technologies. The rapid
evolution of telecommunications standards, frequency bands, and network
technologies necessitates a future-proof approach to infrastructure planning. This
enables seamless upgrades, minimizes costly retrofitting, and ensures properties
remain technologically competitive for years to come.
ii. Assessment Methodology:
a. Validate the support or upgradability of installed Digital Connectivity
Infrastructure (DCI) for future bands for latest technology.
b. Verify RF infrastructure installed like radio units, baseband units, duplexers,
combiners, and transmitters, as applicable, are capable for supporting upcoming
technologies and frequency bands.
c. Supporting documents:
1. Bill of Material (BoM) installed at the property and datasheets for relevant
equipment.
169iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format.
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Bill of Material (BoM)
installed at building
1. Record
along with datasheets
for relevant equipment
Whether DCI supports
future bands for mobile
2. or Wi-Fi network as Record and Upload
applicable as per
datasheets?
Table 5.18: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If installed infrastructure supports future bands for
4G and 5G technology and/or Wi-Fi network as per
1. 3
the extant National Frequency Allocation Plan issued
by DoT.
If installed infrastructure supports future bands for
2. 2 4G technology and/or Wi-Fi network as per the extant
National Frequency Allocation Plan issued by DoT.
If installed infrastructure supports future bands for
3. 1 4G technology or Wi-Fi network as per the extant
National Frequency Allocation Plan issued by DoT.
Table 5.19: Scoring criteria
5.3.3. Sub-Criteria: Upgradability of wireline DCI
(Weightage – 3)
Objective: Wireline digital connectivity infrastructure (DCI), such as fiber-optic
networks, plays a crucial role in ensuring high-speed internet access and seamless
communication. As technology evolves, infrastructure must be designed to
accommodate future upgrades, such as higher bandwidth capacities, new
transmission standards, and enhanced network architectures. This sub-criterion
evaluates whether the existing fiber-optic network can be scaled or upgraded
without requiring extensive rework.
170i. Assessment Methodology:
a. Existing bandwidth verification:
1. Assess the current fiber-optic network’s bandwidth capabilities to determine
if it supports high-speed data transfer (e.g., 1 Gbps, 10 Gbps, or higher).
2. Evaluate the type of fiber used and whether it can support technologies such
as Dense Wavelength Division Multiplexing (DWDM) or Passive Optical
Networks (PON).
b. Scalability review:
1. Inspect the physical infrastructure, including cable pathways, ducts, and
fiber termination points, to verify if additional fiber cables can be added in
the future without major structural modifications.
2. Check the fiber distribution frames to assess whether they allow easy
upgrades or expansions.
3. Determine whether there is spare capacity in existing ducts and conduits to
accommodate additional fiber strands if needed.
c. Supporting documents:
1. Documents to demonstrate upgradability of wireline DCI.
2. Photographic evidence of installed wireline DCI to document their capacity
for future expansion.
ii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record
maintenance
S. Compliance
Item description requirement
No. (Yes/ No)
(Upload/ DCRA
level)
Upgradability of existing
wireline DCI equipment’s
1. Record
(switches/ routers/ splitters/
PON etc.) and relevant cables
Whether the bandwidth
supported through optical
2. Record and Upload
fiber with speed 1 Gbps or
higher?
Table 5.20: Compliance checklist
171iii. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S.
Score Compliance Requirement
No.
If existing wireline infrastructure is on fiber and support
1. 3
minimum 1 Gbps to end users
If existing wireline infrastructure is on fiber and support
2. 2
minimum 500 Mbps to end users
If existing wireline infrastructure is on fiber and support
3. 1
minimum 100 Mbps to end users
Table 5.21: Scoring criteria
5.4. Provision of Wired Connectivity Infrastructure
(Weightage – 20)
This criterion evaluates the availability, quality, and scalability of the wired connectivity
infrastructure within a property.
A robust wired network ensures high-speed, reliable, and low-latency digital connectivity,
supporting various applications such as business operations, smart building technologies and
residential broadband needs as per property use.
5.4.1. Sub-Criteria: Backhaul fiber connectivity (service provider to property)
(Weightage – 10)
i. Objective: A high-capacity fiber optic backhaul connection is essential to ensure
high-speed and uninterrupted digital connectivity for users within the property. The
presence of a dedicated fiber connection from the service provider to the property
enhances network performance, reduces latency, and supports high-bandwidth
applications such as video conferencing, cloud computing, and smart building
management systems.
ii. Assessment Methodology:
a. Fiber availability check:
1. Conduct a physical verification of the fiber optic backhaul infrastructure
connected to the service provider’s network.
2. Check redundancy measures, such as dual entry fiber paths, in place for
uninterrupted fiber connectivity in case of failure.
172b. Bandwidth capacity check:
1. Record the provisioned Bandwidth capacity in the property for each service
provider.
i. BW capacity on fiber
ii. BW capacity on wireless
iii. BW on any other media (please specify)
c. Supporting documents:
1. Fiber cable details from service providers to the property and supporting
documents regarding available bandwidth from each service provider on
fiber.
d. Documentation Review: Validate the Telecom/ Internet service provider
agreements and fiber/ bandwidth testing results.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
Compliance
S. No. Item description requirement (Upload/
(Yes/ No)
DCRA level)
1. Fiber testing results Record
Photographs of fiber
termination point at
2. Record and Upload
main telecom
room/telecom area
Table 5.22: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Criteria
[(5) *(No. of wireline service providers
having fiber backhaul)
(No. of wireline service providers
present in the property)]
Score
1. 10
Awarded = +
[(5) *(No. of wireless service providers
having fiber backhaul)
(No. of wireless service providers
present in the property)]
Table 5.23: Scoring criteria
1735.4.2. Sub-Criteria: Fiber connectivity till user premises
(Weightage – 5)
i. Objective: Sub-criterion assesses whether high-capacity fiber-optic infrastructure
is extends from the telecommunication room/ transmission
room/telecommunication area up to the end-users within a property. The aim is to
facilitate the extension of digital connectivity to the residents, businesses, and
offices. A fiber-optic connection reaching the user premises guarantees superior
bandwidth, lower latency, and future-proof infrastructure capable of supporting
evolving digital requirements such as 5G backhaul, cloud services, and smart
building applications. The well planned and laid fiber cables from telecom
room(s)/telecom area(s) to the user premises (flat/home/office/shop etc. as
applicable) enables faster provisioning and easy to maintain.
ii. Assessment Methodology:
a. Physical Inspection: Verify that fiber-optic cabling extends up to each
residential, office, or commercial unit within the property.
b. Supporting documents:
1. Fiber network architecture showing fiber distribution from the telecom
room/telecom area or meeting point to each unit.
2. Fiber test reports confirming connectivity to each unit
iii. Compliance check list: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Fiber layout diagrams
1. Record and Upload
up to user premises
Sample fiber test reports
2. confirming connectivity Record and Upload
to each user premise
Table 5.24: Compliance checklist
174iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If fiber connectivity is extended from telecommunication
1. 5 room/ transmission room/telecommunication area to all
user units within the property
If fiber connectivity is extended from telecommunication
2. 4 room/ transmission room/telecommunication area to a
minimum of 75% of user units within the property
If fiber connectivity is extended from telecommunication
3. 3 room/ transmission room/telecommunication area to a
minimum of 50% of user units within the property
If fiber connectivity is extended from telecommunication
4. 2 room/ transmission room/telecommunication area to a
minimum of 30% of user units within the property
Table 5.25: Scoring criteria
5.4.3. Sub-Criteria: Fiber connectivity in each room or office or commercial
space
(Weightage – 5)
i. Objective: The goal of this sub-criterion is to assess whether every individual space
within the property, whether a residential unit, office, or commercial
establishment—has fiber connectivity. This guarantees seamless high-speed
internet access across the entire property, eliminating connectivity dead zones and
ensuring a uniform digital experience for all occupants.
ii. Assessment Methodology:
a. Visual Inspection: Inspect rooms, offices, or commercial spaces on a sample
basis to confirm the presence of fiber-optic connectivity infrastructure and
termination points in each room/ office.
b. Supporting documents:
1. Network layout diagram for user units showing fiber terminations and
sample test reports for fiber terminations.
2. Site survey reports and photographic evidence.
175iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
Item Compliance
S. No. requirement (Upload/
description (Yes/ No)
DCRA level)
Network layout
diagram for user
1. Record
units showing fiber
terminations
Sample test
reports for fiber
2. Record and Upload
terminations
testing
Table 5.26: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If fiber connectivity is extended in each room/ office/
1. 5
commercial space of all user units within the property
If fiber connectivity is extended in each room/ office/
2. 4 commercial space of minimum 75% of user units within
the property
If fiber connectivity is extended in each room/ office/
3. 3 commercial space of minimum 50% of user units within
the property
If fiber connectivity is extended in each room/ office/
4. 2 commercial space of minimum 30% of user units within
the property
Table 5.27: Scoring criteria
1765.5. Availability of Service Providers
(Weightage – 15)
This criterion evaluates the number and diversity of wireline and mobile service providers
that have integrated their services with the Digital Connectivity Infrastructure (DCI) of a
property. A higher number of available providers ensure better service quality, redundancy,
and consumer choice.
5.5.1. Sub-Criteria: Number of wireline Internet Service providers having
integration with Digital Connectivity Infrastructure
(Weightage – 7.5)
i. Objective: The presence of multiple wireline Internet Service Providers (ISPs)
within a property significantly enhances competition, service quality, redundancy,
and network resilience, ensuring reliable and high-speed digital connectivity. A
multi-ISP infrastructure benefits property managers, businesses, and residents by
providing greater flexibility, improved service continuity, and optimized cost
structures.
ii. Assessment Methodology:
a. Verification of ISP Integration: Confirm the number of wireline TSP/ ISPs
integrated with the DCI by inspecting the infrastructure and service availability.
b. Telecom/Internet Service Provider Agreement Review: Verify
agreements with TSP/ ISPs and sample integration test reports.
c. Validation: Verify that all integrated TSP/ ISPs are operational.
d. Supporting documents:
1. Telecom/ Internet Service Provider (TSP/ ISP) Agreements.
2. Network integration certificates/ test reports.
3. Service subscription status.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
Compliance
S. No. Item description requirement (Upload/
(Yes/ No)
DCRA level)
Telecom/ Internet
1. Service Provider Record
(ISP) Agreements
177Record maintenance
Compliance
S. No. Item description requirement (Upload/
(Yes/ No)
DCRA level)
Network integration
2. certificates/test Record
reports
Service subscription
3. Record and Upload
status
Table 5.28: Compliance checklist
iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If 3 or more internet service providers have
1. 7.5 integration with DCI in the property with active
service subscription
If a minimum of 2 internet service providers have
2. 5 integration with DCI in the property with active
service subscription
If at least one internet service provider has
3. 2 integration with DCI in the property with active
service subscription
Table 5.29: Scoring criteria
5.5.2. Sub-Criteria: Number of Mobile Service providers having coverage or
integration with Digital Connectivity Infrastructure
(Weightage – 7.5)
i. Objective: The objective of this sub-criterion is to assess the extent to which
multiple mobile service providers (TSPs) are integrated with the property’s digital
connectivity infrastructure (DCI) or have adequate service coverage measured as per
methodology in section 5.6. Having multiple mobile service providers ensures users
have reliable network coverage, high-quality service, and reduced congestion,
particularly in high-density areas like commercial properties, residential complexes,
and office spaces.
178ii. Assessment Methodology:
a. Coverage Verification:
1. Confirm the number of Telecom Service Providers (TSPs) providing indoor
coverage for the property.
2. Validate integration of the DCI with In-Building Solutions (IBS)/ Small
Cells/ Wi-Fi offload for enhanced indoor mobile coverage.
b. Supporting documents:
1. Agreements signed with Telecom Service Providers.
2. Walk/drive test results and/or RF coverage map in the property
c. Documentation Review: Validate the TSP agreements and network
integration test reports.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Walk/drive test results
and/or RF coverage map in
1. Record and Upload
the property
Network performance test
2. results from multiple Record
operators
Agreements signed with
Telecom Service Providers
3. Record
(without commercial
details)
Table 5.30: Compliance checklist
179iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If 3 or more mobile service providers individually
have overall more than 75% coverage (RSRP ≥ -
1. 7.5
110 dBm) for 4G/5G services in the property either
through integration with DCI or otherwise.
If at least two mobile service providers
individually have overall more than 75% coverage
2. 5 (RSRP ≥ -110 dBm) for 4G/5G services in the
property either through integration with DCI or
otherwise.
If at least one mobile service providers have
overall more than 75% coverage (RSRP ≥ -110
3. 2
dBm) for 4G/5G services in the property either
through integration with DCI or otherwise.
Table 5.31: Scoring criteria
5.6. Service Performance
(Weightage – 25)
Service performance is a critical factor in evaluating the digital connectivity of a property.
This criterion assesses service performance parameters to assess digital experience in the
property including lifts and basements. For assessment of mobile service coverage, the
reference minimum signal strength for 2G/4G/5G technology shall be same as prescribed by
TRAI for publishing of coverage map under revised QoS regulation i.e. ‘THE STANDARDS
OF QUALITY OF SERVICE OF ACCESS (WIRELINE AND WIRELESS) AND BROADBAND
(WIRELINE AND WIRELESS) SERVICE REGULATIONS, 2024 (06 of 2024)’.
To assess service performance for mobile (data and voice services) and Wi-Fi services (data
services), at least one sample for each of 5x5 meter or less size of tile size will be collected as
far as feasible for respective service provider. For example, if the total public area of the
property is 10000 square meters, then a minimum of 400 samples in each day are to be
collected for relevant parameters. TRAI App shall be used for the testing of coverage and
download speeds. To calculate the download speeds for mobile and Wi-Fi services, all the
download speed samples shall be arranged in descending order (starting highest download
speed recorded during entire assessment period) and the 80th percentile value, arrived after
such arrangement, shall be considered the minimum download speed. For illustration, if a
total of 1200 samples have been collected during the assessment period, then these values
180shall be arranged in descending order and 1200*0.8=960th value of download speed shall be
taken as minimum download speed for the mobile or Wi-Fi service.
For assessment of voice service performance, a structured and repeatable methodology shall
be followed to measure key parameters. During the assessment, one test device (call
terminating) will be placed at a fixed location in the property and other device (call
originating) shall be used for sample collection around different areas of the property as per
sampling methodology. Each test call shall begin with dial initiation, and a maximum of 15
seconds shall be allowed for the call to be successfully established. Calls not connected within
this duration shall be recorded as failed attempts. For calls that are successfully established,
the call shall be maintained for a duration of 90 to 120 seconds to observe call stability and
identify any premature disconnections. After completion of the call duration, the call shall be
normally terminated. A wait time of 15 seconds shall be observed before initiating the next
call. This process shall be repeated in accordance with the sampling plan. The same
methodology shall be referred to in the subsequent sections where Call Setup Time, Call
Setup Success Rate, and Call Drop Rate are defined and calculated. The DCRA shall use
industry-standard tools for assessment of voice service performance. Further, DCRA must
ensure using the same tool for evaluating all service providers within a property to assess
voice service performance.
Figure 5.1: Call Flow for measuring Voice services performance
5.6.1. Sub-Criteria: Mobile network coverage and performance in public areas
of property
(Weightage – 6)
i. Objective: The mobile network performance in public areas (e.g., common area,
lobbies, corridors) should meet minimum requirements for signal strength and
speed which is essential for superior user experience, safety, and efficient operations.
ii. Assessment Methodology:
a. Conduct RF testing for mobile coverage in public spaces like lobbies, corridors,
common utilities like gym, banquet hall, garden, parking, lifts, basements, and
entrances using industry standard tools.
181b. Assess data speed and voice call quality over minimum three days (preferably 10
am to 8 pm with samples uniformly distributed covering peak hours [10 am to 12
noon and 6 pm to 8 pm] in property) using prescribed methodology for each
service provider whose coverage is available on the property and accounted
under criteria ‘5.5- Availability of Service Providers’. Measurements to be
carried out shall include peak as well as off-peak hours.
c. The call setup time, call setup success rate and call drop rate, for voice services,
will be measured as per the measurement methodology prescribed in section
5.6.1. ii. d. Number of test samples and methodology shall be as prescribed in
section 5.6 above.
d. The following methodology shall be used for calculating call setup success rate,
call drop rate and call setup time:
1. Call setup success rate: Call Setup Success Rate is defined as the ratio of
Established Calls to Call Attempts. ‘Established Calls’ mean the following
events have happened in call setup:
(a) Call attempt is made
(b) The signaling channel is allocated
(c) The call is routed to the outwards path of the terminating network
(d) An alert signal is received by caller in the form of ring back tone, busy
tone, or an announcement.
CSSR = (Total Call Established/ Total Call Attempt) *100
2. Call Drop rate: Call drop represents the service provider network’s ability
to maintain a call once it has been successfully established. This parameter
shall include both incoming calls and outgoing calls which, once they have
been established and have an assigned traffic channel/ bearer, are dropped,
or interrupted before their normal completion by the user, the cause of the
early termination being within the service provider’s network
Call Drop Rate = (Total Call Drop/Total Call Established) *100
3. Call setup time: Time taken from call initiate to call alerting/ringing.
Call Setup Time = T2- T1
T2- Ringing (VoLTE/VoNR),
T1- Invite (VoLTE/VoNR)
iii. Supporting documents:
1. Walk/drive test results and/or RF coverage map of public areas
2. Speed test logs and call setup time, call setup success rate and call drop rate
reports.
182iv. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Walk/drive test results
1. and/or RF coverage map Record and Upload
of public areas
Speed test logs, call setup
2. time, call setup success Record and Upload
rate and call drop rate
Speed and coverage
samples mapped on the
3. Record and Upload
Layout maps
(floors/areas)
Table 5.32: Compliance checklist
v. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
Part A
If at least 3 service providers individually have overall
more than 85% mobile coverage (RSRP ≥ -110 dBm) for
4G/5G services in public areas (including common area,
1. 4
lifts, and basements) with minimum download speed of
10Mbps for 4G or 100 Mbps for 5G technology as
applicable.
If at least two service providers individually have overall
more than 85% mobile coverage (RSRP ≥ -110 dBm) for
4G/5G services in public areas (including common area,
2. 3
lifts, and basements) with minimum download speed of
10Mbps for 4G or 100 Mbps for 5G technology as
applicable.
If at least one service provider has overall more than
85% mobile coverage (RSRP ≥ -110 dBm) for 4G/5G
services in public areas (including common area, lifts,
3. 2
and basements) with minimum download speed of
10Mbps for 4G or 100 Mbps for 5G technology as
applicable.
183S. No. Score Compliance Requirement
Part B
If call drop rate ≤ 2% and call setup success rate ≥ 98%
1. 2
for each service provider
If call drop rate ≤ 2% or call setup success rate ≥ 98%
2. 1
for each service provider
Note 1: Refer methodology in Section 5.6 for calculation of minimum download
speed.
Note 2: This sub-criterion is evaluated in two parts — Part A and Part B. The
property shall be assessed separately under each part. The overall score for this
sub-criterion shall be the sum of the scores awarded in Part A and Part B.
Table 5.33: Scoring criteria
5.6.2. Sub-Criteria: Secure public Wi-Fi network coverage and performance in
public areas of property
(Weightage – 4)
i. Objective: Public Wi-Fi in the property may complement the mobile coverage.
However, it should be secure and offer a high level of performance, with fast speeds
and low latency. With secure and seamless public Wi-Fi coverage in the property,
consumers can avail the data and voice service. The assessment shall include
evaluating its Wi-Fi network availability, security measures in place, speed, and
latency required for reliable digital connectivity.
ii. Assessment Methodology:
a. Identify all public areas within the property where Wi-Fi services are provided,
such as lobbies, lounges, cafeterias, parking areas, lifts, basements, and open
seating spaces.
b. Conduct sample WPA2/ WPA3 compliance checks for security.
c. Conduct speed and latency tests covering peak hours (10 am to 12 noon and 6 pm
to 8 pm) over minimum three days (preferably 10 am to 8 pm) using industry
standard tools using prescribed methodology.
184iii. Supporting documents:
1. Speed Test Results: Logs of speed and latency test results from various
locations and times, demonstrating network reliability.
2. Wi-Fi Security Audit Reports: Reports confirming compliance with WPA2/
WPA3 security standards, network authentication mechanisms, and encryption
configurations.
iv. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Wi-Fi speed test
1. Record and Upload
results
Wi-Fi security audit
2. Record
reports
Speed samples
3. mapped on the Layout Record and Upload
maps (floors/areas)
Table 5.34: Compliance checklist
v. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If minimum download speed of 20 Mbps is
1. 4 available from Wi-Fi in public or common area of
the property (including lifts and basements).
If minimum download speed of 10 Mbps is
2. 2 available from Wi-Fi in public or common area of
the property (including lifts and basements).
Note: Refer methodology in Section 5.6 for calculation of minimum download
speed.
Table 5.35: Scoring criteria
1855.6.3. Sub-Criteria: Mobile network coverage and performance in non-public
areas
(Weightage – 5)
i. Objective: The mobile network should maintain high performance in private or
restricted areas, such as residential flats, offices, conference rooms, executive cabins
etc. within a property. The objective of this criterion is to assess the availability of
mobile network coverage in private areas of the property.
ii. Assessment Methodology:
a. Conduct RF testing for mobile coverage in pre-defined non-public areas using
industry standard tools.
b. Assess data speed and voice call quality over minimum three days (preferably 10
am to 8 pm with samples uniformly distributed covering peak hours [10 am to 12
noon and 6 pm to 8 pm] in property) using prescribed methodology for each
service provider whose coverage is available on the property and accounted
under criteria ‘5.5- Availability of Service Providers’. Measurements to be carried
out shall include peak as well as off-peak hours.
c. The call setup time, call setup success rate and call drop rate, for voice services,
will be measured as per the measurement methodology prescribed in section
5.6.3. ii. d. Number of test samples and methodology shall be as prescribed in
section 5.6 above.
d. The following methodology shall be used for calculating call setup success rate,
call drop rate and call setup time:
1. Call setup success rate: Call Setup Success Rate is defined as the ratio of
Established Calls to Call Attempts. ‘Established Calls’ mean the following
events have happened in call setup:
(a) Call attempt is made
(b) The signaling channel is allocated
(c) The call is routed to the outwards path of the terminating network
(d) An alert signal is received by caller in the form of ring back tone, busy
tone, or an announcement.
CSSR = (Total Call Established/ Total Call Attempt) *100
1862. Call Drop rate: Call drop represents the service provider network’s ability
to maintain a call once it has been successfully established. This parameter
shall include both incoming calls and outgoing calls which, once they have
been established and have an assigned traffic channel/ bearer, are dropped,
or interrupted before their normal completion by the user, the cause of the
early termination being within the service provider’s network
Call Drop Rate = (Total Call Drop/Total Call Established) *100
3. Call setup time: Time taken from call initiate to call alerting/ringing.
Call Setup Time = T2- T1
T2- Ringing (VoLTE/VoNR),
T1- Invite (VoLTE/VoNR)
iii. Supporting documents:
1. Walk/drive test results and/or RF coverage map of the area under test
2. Speed test logs and call setup time, call setup success rate and call drop rate
reports.
iv. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Walk/drive test
results and/or RF
1. Record and Upload
coverage map of the
area under test
Speed test logs, call
setup time, call setup
2. Record and Upload
success rate and call
drop rate
Speed and coverage
samples mapped on
3. Record and Upload
the Layout maps
(floors/areas)
Table 5.36: Compliance checklist
187v. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
Part A
If at least 3 service providers individually have overall more
than 80% mobile coverage (RSRP ≥ -110 dBm) for 4G/5G
1. 4 services in non-public areas, with minimum download
speed of 10Mbps for 4G or 100 Mbps for 5G technology as
applicable.
If at least 2 service providers individually have overall more
than 70% mobile coverage (RSRP ≥ -110 dBm) for 4G/5G
2. 3 services in non-public areas, with average minimum
download speed of 10Mbps for 4G or 100 Mbps for 5G
technology as applicable.
If at least 2 service providers have overall more than 50%
mobile coverage (RSRP ≥ -110 dBm) for 4G/5G services in
3. 2 non-public areas, with average minimum download speed
of 10Mbps for 4G or 100 Mbps for 5G technology as
applicable.
Part B
If call drop rate ≤ 2% and call setup success rate ≥ 98%
1. 1
for each service provider
If call drop rate ≤ 2% or call setup success rate ≥ 98% for
2. 0.5
each service provider
Note 1: Refer methodology in Section 5.6 for calculation of minimum download
speed.
Note 2: This sub-criterion is evaluated in two parts — Part A and Part B. The
property shall be assessed separately under each part. The overall score for this
sub-criterion shall be the sum of the scores awarded in Part A and Part B.
Table 5.37: Scoring criteria
1885.6.4. Sub-Criteria: Secure public Wi-Fi network coverage and performance in
non-public areas
(Weightage – 5)
i. Objective: Public Wi-Fi in the property may complement the mobile coverage.
However, it should be secure and offer a high level of performance, with fast
speeds and low latency. With secure and seamless public Wi-Fi coverage in the
property, consumers can avail the data and voice service. The goal is to assess Wi-
Fi coverage in non-public areas, such as residential flats, enterprise workspaces,
executive offices, conference rooms, etc. These areas require reliable, high-speed,
and encrypted Wi-Fi connectivity to support business operations, data security,
and seamless enterprise communication.
ii. Assessment Methodology:
To evaluate compliance with this sub-criterion, the following steps will be
undertaken:
a. Identify all non-public areas within the property where Wi-Fi services are
provided.
b. Conduct sample WPA2/WPA3 compliance checks for security.
c. Conduct speed and latency tests covering peak hours (10 am to 12 noon and 6 pm
to 8 pm) over minimum three days (preferably 10 am to 8 pm) using industry
standard tools using prescribed methodology.
iii. Supporting documents:
1. Speed Test Results: Logs of speed and latency test results from various
locations and times, demonstrating network reliability.
2. Wi-Fi Security Audit Reports: Reports confirming compliance with WPA2/
WPA3 security standards, network authentication mechanisms, and encryption
configurations.
189iv. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
Wi-Fi security
1. Record
certifications
2. Wi-Fi speed test results Record and Upload
Speed samples mapped
3. on the Layout maps Record and Upload
(floors/areas)
Table 5.38: Compliance checklist
v. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S.
Score Compliance Requirement
No.
If minimum download speed of 20 Mbps is available from
1. 5
Wi-Fi in non-public area of the property.
If minimum download speed of 10 Mbps is available from
2. 3
Wi-Fi in non-public area of the property.
If minimum download speed of < 10 Mbps and > 2 Mbps
3. 2
is available from Wi-Fi in non-public area of the property.
Note: Refer methodology in Section 5.6 for calculation of minimum download
speed.
Table 5.39: Scoring criteria
1905.6.5. Sub-Criteria: Average download speed of different wireline network(s)
in respective highest speed plan
(Weightage – 5)
i. Objective: The objective of this sub-criterion is to assess the highest average
download speed supported by different wireline networks or service providers under
their offered plans in the property.
ii. Assessment Methodology:
a. Conduct speed tests using standard tools (TRAI App). Conduct tests during the
prescribed time window (preferably 10 am to 8pm) including peak traffic
hour(s) (10 am to 12 noon and 6 pm to 8 pm) at least at five different user
locations distributed across the property as far as possible. Minimum five test
samples per location shall be collected.
b. To calculate the average download speeds, all the download speed samples shall
be arranged in descending order (starting highest download speed recorded
during entire assessment period) and the 90th percentile value, arrived after
such arrangement, shall be considered the average download speed. For
illustration, if a total of 120 samples have been collected during the assessment
period, then these values shall be arranged in descending order and
120*0.9=108th value of download speed shall be taken as average download
speed.
c. Supporting documents: Speed test results with timestamps.
iii. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Item Compliance
requirement (Upload/ DCRA
No. description (Yes/ No)
level)
Speed test results
1. Record and Upload
with timestamps
Speed samples
mapped on the
2. Record and Upload
Layout maps
(floors/areas)
Table 5.40: Compliance checklist
191iv. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S.
Score Compliance Requirement
No.
If download speed of any two wireline network is more
1. 5
than 500 Mbps as calculated above [section 5.6.5 ii. b.]
If the download speed of any two wireline network is more
2. 4
than 250 Mbps as calculated above [section 5.6.5 ii. b.]
If the download speed of any two wireline network is more
3. 3
than 100 Mbps as calculated above [section 5.6.5 ii. b.]
If the download speed of any two wireline network is more
4. 2
than 50 Mbps as calculated above [section 5.6.5 ii. b.]
Table 5.41: Scoring criteria
5.7. User Experience
(Weightage – 10)
User experience assesses user feedback on digital connectivity, including network reliability,
speed, latency, and ease of access. It considers factors like seamless browsing, streaming
quality, and minimal disruptions. A positive experience indicates robust connectivity, while
frequent issues highlight areas for improvement.
5.7.1. Sub-Criteria: User feedback on digital connectivity experience
(Weightage – 10)
i. Objective: The objective of this sub-criterion is to collect and analyze user feedback
regarding their experience with mobile, wireline, and Wi-Fi services in a property.
User insights help assess the real-world performance of the digital connectivity
infrastructure, identify gaps in service quality and drive improvements to enhance
the overall connectivity experience.
ii. Assessment Methodology:
a. Conduct structured surveys capturing user satisfaction on voice call quality, voice
call accessibility, voice call retainability, data speed (wireline and wireless),
latency, service uptime and coverage.
b. The feedback should be collected from a minimum of 10% of the users of the
property if the total users are less than 1000. In case total users are more than
1000, then feedback may be collected from a minimum of 100 users. The users in
survey should be distributed across gender and broad adult age groups.
192iii. Supporting documents:
1. User feedback form (please refer to Appendix section for the indicative feedback
form).
iv. Compliance checklist: The DCRAs shall prepare and maintain the compliance
summary in the following format:
Record maintenance
S. Compliance
Item description requirement (Upload/
No. (Yes/ No)
DCRA level)
1. User feedback form Record and Upload
Table 5.42: Compliance checklist
v. Scoring criteria: The DCRA shall award score against this sub-criterion as
follows:
S. No. Score Compliance Requirement
If 80% of users provide overall positive experience for
1. 10
digital connectivity in the property
If 70% of users provide overall positive experience for
2. 8
digital connectivity in the property
If 60% of users provide overall positive experience
3. 6
for digital connectivity in the property
If 50% of users provide overall positive experience for
4. 4
digital connectivity in the property
If 40% of users provide overall positive experience for
5. 2
digital connectivity in the property
Table 5.43: Scoring criteria
Note: Overall positive experience refers to the user feedback provided in the form
prescribed under Appendix 11.4 of this Manual. In this context, if a user has rated
the Overall Experience as 4 or higher, the experience shall be considered as
positive.
1935.8. Summary of Rating Score
After assessing and scoring against each criterion and sub-criteria as per assessment
methodology, the DCRA shall prepare the summary of rating score in following format for
final updating in the rating platform for generating the rating certificate. It is to be noted that
the scores against each sub-criteria will be awarded strictly as per the scoring criteria given
above.
Sub Score
Criteria Criteria Weightage Sub-Criteria Criteria awarded
No. Weightage by DCRA
[a] [b] [c] [d] [e]
5.1.1 Redundancy of
2
Provision in power source
power
5.1.2 UPS power
infrastructure 4
backup for DCI
5.1 for ensuring 10
5.1.3 Power continuity
reliable
2
monitoring
digital
connectivity 5.1.4 Building
2
Management System
5.2.1 Availability of
alternate entry paths
3
for digital connectivity
infrastructure
Digital
5.2.2 Non-flooding
Connectivity
5.2 10 measures for DCI 3
Infrastructure
installation
Resilience
5.2.3 Implementation
of redundancy in
4
power source and DCI
paths
5.3.1 Availability of the
Future latest generation of 4
Readiness of mobile connectivity
5.3 Digital 10 5.3.2 Support for
3
Connectivity future bands
Infrastructure
5.3.3 Upgradability of
3
wireline DCI
194Sub Score
Criteria Criteria Weightage Sub-Criteria Criteria awarded
No. Weightage by DCRA
[a] [b] [c] [d] [e]
5.4.1 Backhaul fibre
connectivity (service 10
provider to property)
Provision of 5.4.2 Fibre
Wired connectivity till user 5
5.4 20
Connectivity premises
infrastructure 5.4.3 Fibre
connectivity in each
5
room or office or
commercial space
5.5.1 Number of
wireline Internet
Service providers
having integration 7.5
with Digital
Connectivity
Availability of
Infrastructure
5.5 Service 15
5.5.2 Number of
Providers
Mobile Service
providers having
coverage or 7.5
integration with
Digital Connectivity
Infrastructure
5.6.1 Mobile network
coverage and
6
performance in public
areas of property
5.6.2 Secure public
Wi-Fi network
Service
5.6 25 coverage and 4
Performance
performance in public
areas of property
5.6.3 Mobile network
coverage and
5
performance in non-
public areas
195Sub Score
Criteria Criteria Weightage Sub-Criteria Criteria awarded
No. Weightage by DCRA
[a] [b] [c] [d] [e]
5.6.4 Secure public
Wi-Fi network
coverage and 5
performance in non-
public areas
5.6.5 Average
download speed of
different wireline
5
network(s) in
respective highest
speed plan
5.7.1 User feedback on
User
5.7 10 digital connectivity 10
Experience
experience
Table 5.44: Summary of Rating Score
1966. Award of Rating and Renewal
The Digital Connectivity Rating is a standardized measure used to evaluate the quality,
reliability, and readiness of a property's digital infrastructure and on ground service
performance. The rating process assesses multiple factors, including infrastructure,
regulatory compliance, service performance, and user experience.
Once the assessment is completed, a final rating is assigned, helping property owners,
tenants, and service providers make informed decisions regarding digital connectivity in that
location. The rating also plays a crucial role in attracting potential businesses and residents
who prioritize seamless digital connectivity.
Additionally, this rating is subject to renewal at periodic intervals, ensuring that properties
maintain or improve their connectivity standards over time.
6.1. Classification of Ratings
Following the detailed assessment process outlined in Chapter 4 and 5 of this manual, a
cumulative score is assigned to each property. Based on this score, a corresponding Digital
Connectivity Rating from 1 star to 5 star is awarded, which serves as an indicator of the
property's readiness to support high-speed and reliable digital services.
Digital Connectivity Rating to be
Score Range
S. No.
awarded
1. >=25-32
2. >32-40
3. >40-48
4. >48-56
5. >56-64
6. >64-72
7. >72-80
8. >80-88
9. More than 88
Table 6.1: Rating Scorecard
1976.2. Validity Period of Ratings
The validity period refers to the duration for which a property’s Digital Connectivity Rating
remains effective before requiring reassessment and renewal.
The difference in validity periods between categories is likely based on factors such as:
i. Infrastructure Stability: Well-equipped properties with robust digital
infrastructure may have longer validity periods.
ii. Usage and Demand: Properties with higher connectivity demands may require
more frequent reassessments.
iii. Regulatory Compliance: Changes in technology standards and regulations
may impact validity duration.
The validity period for Category ‘A’ Category and ‘B’ properties shall be as prescribed by the
Authority from the date of issue of the rating certificate.
6.3. Reassessment Process
To ensure the continued accuracy and relevance of digital connectivity ratings, rating
platform provides a structured mechanism for property managers to apply for re-rating
within the validity period of the existing digital connectivity rating certificate (Regulation 29).
This process enables properties to reflect infrastructure upgrades, technological
advancements, and regulatory compliance improvements, ensuring that the rating remains
aligned with the latest connectivity standards.
6.3.1. Eligibility Criteria for Re-rating
A property shall be eligible for re-rating under the following circumstances:
i. Full upgrade of Digital connectivity infrastructure (DCI): If a property has
undergone a comprehensive enhancement of its telecom infrastructure, the property
manager may seek re-rating to reflect the improvements. Such upgrades may
include:
a. Expansion of fiber optic networks.
b. Installation of in-building solutions to improve indoor coverage.
c. Enhancement of power backup systems for digital infrastructure to ensure.
seamless connectivity.
d. Integration of smart network management systems.
198ii. Technological upgradation leading to demand for Re-rating by end
users: If there has been a significant upgrade in the technology deployed at the
property and end users or tenants demand a reassessment, a re-rating may be
considered. Examples of such technological advancements include:
a. Deployment of 5G, Wi-Fi or high-speed fiber networks to enhance connectivity.
b. Significant improvements in broadband speed, latency, and network resilience.
c. Implementation of next-generation digital services, such as IoT-enabled
automation.
d. Increased demand for an upgraded rating due to expanding digital service
requirements from occupants, enterprises or businesses operating within the
property.
iii. Other changes affecting the rating as per regulatory criteria
If any modifications or improvements impact the property’s compliance with DCRA
rating parameters, a re-rating application may be submitted. Such changes may
include:
a. Increase in the number of telecom service providers offering wired or wireless
services at the property
b. Upgraded compliance with Model Building Bye-Laws (MBBL) and National
Building Code (NBC) for digital infrastructure
c. Expansion of telecom facilities to previously underserved areas within the
property, ensuring enhanced access
d. Improvement in service reliability, redundancy, and fault tolerance mechanisms
6.4. Renewal Process
To ensure the continuity of a property’s digital connectivity rating, DCRA mandates that
property managers apply for renewal of their rating before its expiry.
The renewal process ensures that properties continue to meet the regulatory, technical, and
service performance standards required for maintaining their digital connectivity
classification (Regulation 19). The property manager may apply for renewal of ratings well
in advance for continuity of rating for the property.
6.4.1. Application Timeline and Submission
A property manager who intends to renew the digital connectivity rating certificate for a
property under their ownership, control, or management must submit a renewal
application on the rating platform at least 120 days prior to the expiry of the existing rating.
This advance submission ensures sufficient time for assessment, verification, and issuance
of the renewed certificate without any lapse in rating status.
199The renewal application may include:
i. Any changes or upgrades made to the digital connectivity infrastructure since the
last assessment.
ii. A self-declaration of continued compliance with the applicable Model Building Bye-
Laws (MBBL), National Building Code (NBC), and DCRA guidelines.
iii. Payment of the renewal processing fee as per the prescribed schedule.
The application for renewal shall be made through the rating platform.
6.4.2. Assessment and Verification Process
Upon receiving the renewal request, DCRA will undertake a comprehensive reassessment
to verify that the property still meets the required connectivity standards. The assessment
process shall be similar to that followed for award of ratings first time and may inter-alia
include:
i. Review of documentation: Validation of submitted records, compliance reports,
and service provider agreements.
ii. Infrastructure inspection: A physical or digital audit of the property’s telecom
infrastructure, ensuring continued adherence to the original rating criteria.
iii. Performance evaluation: Assessment of service reliability, network availability,
user feedback, and any upgrades implemented since the last rating period.
iv. Regulatory compliance check: Verification of compliance with MBBL, NBC, and
other applicable digital infrastructure standards.
If the property meets or exceeds the required standards, the Digital Connectivity Rating
Certificate will be renewed for the next validity period.
6.4.3. Renewal Outcome and Rating Status
The property will receive a renewed rating certificate, valid for the next certification cycle,
with updated documentation reflecting the latest assessment.
2007. Reporting and Feedback Mechanism
A well-defined stakeholder reporting, and feedback mechanism is essential for maintaining
transparency, accountability, and continuous improvement in the digital connectivity rating
process for properties. This mechanism ensures that all stakeholders, including property
managers, service providers, infrastructure providers, and end users have a structured
platform to report issues against the rated, provide feedback, and suggest improvements to the
property manager related to digital connectivity within rated properties.
7.1. Monitoring and Reporting Mechanism
DCRA is responsible for overseeing feedback and complaints related to the ratings awarded
to properties throughout the rating certificate’s validity as per following provisions regulation
11.
i. “Every DCRA shall monitor feedback or complaints received from service
providers or end users during the validity of the rating certificate of the
properties, as received through the rating platform, concerning the ratings
awarded by DCRA.
ii. Every DCRA shall examine feedback or complaints received under sub-regulation
(1) and evaluate the need for either review of rating awarded or corrective actions
required by the property manager and take follow up action with the property
manager, if required, for resolving such identified issues.”
7.2. Mechanism for Stakeholder Feedback
A standardized feedback mechanism will be provided in the rating platform to enable
feedback-based oversight on the status of digital connectivity in rated properties during
validity of ratings. Stakeholder feedback will be made available to the concerned property
manager and DCRA against each rated property. The stakeholders will be required to validate
themselves to submit feedback through the platform. The feedback from the stakeholders
shall be supported with relevant evidence(s).
The high-level approach for feedback lifecycle will include:
i. Feedback Categories:
a. Connectivity Performance: Reports on issues such as poor network
coverage, insufficient infrastructure, or slow internet speeds.
b. Infrastructure Gaps: Identification of areas requiring upgrades to meet TRAI
standards.
c. General Suggestions: Recommendations to improve the overall framework
and efficiency.
201ii. Feedback Processing and Resolution by property manager:
a. Acknowledgment: Feedback will be acknowledged automatically by rating
platform.
b. Review and evaluation: All feedback received during a month/ quarter
(based on volume of feedback or issues) will be reviewed by the property
manager for evaluation of any corrective action required. In case any corrective
action is proposed, it will be updated on the rating platform for information of
concerned stakeholders. In addition, property managers may also use other
channels of communication for this purpose.
iii. Yearly review of stakeholder feedback by DCRA:
DCRA shall review the issues and feedback reported by stakeholders at least on a
yearly basis from the date of issue of rating certificate. However, in the case of large
number of feedback/complaints for any rated property, DCRA shall undertake
review as per requirement or as directed by the Authority. The summary report of
such reviews covering analysis of feedback, conclusion, and recommended actions
by the property manager, if any, shall be uploaded against each property.
iv. Corrective action by the property manager:
The property manager concerned shall take corrective action, if any recommended
by DCRA, in a time-bound manner within the timelines suggested by the DCRA. The
action taken report by the property manager shall be uploaded against the property
for review by the DCRA and closure of observations.
7.3. Addressing Non-Compliance
Any instance of non-compliance by the property manager or DCRA shall be dealt in
accordance with the provisions of the regulations.
2028. Appeal Process
To uphold transparency, fairness, and accountability, the rating framework provides a
structured appeal process for property managers who wish to challenge their assigned rating.
This chapter details the procedures, timelines, and regulatory provisions governing appeals,
ensuring they are handled promptly and impartially.
The appeal process, under regulation 27, offers property managers a formal mechanism to
request a review of their rating if they believe the assessment does not accurately represent the
digital connectivity infrastructure of their property.
8.1. Filing of Appeal by Property Manager
Property managers who are dissatisfied with the Digital Connectivity Rating assigned to their
property by DCRA may file an appeal through the rating platform. The appeal process ensures
a fair opportunity for property managers to challenge their rating based on valid concerns
and supporting evidence. The appeal must be submitted within 30 days of the date of
issuance of the rating certificate as per the sub-clause (1) of regulation 27.
The appeal justification may include the following:
i. Justification for the appeal, citing specific criteria and sub-criteria that require
reconsideration.
ii. Supporting documentation, technical reports, or third-party assessments validating
the concerns raised.
iii. Any additional evidence demonstrating improvements in digital connectivity
infrastructure that may not have been considered during the initial rating
assessment.
8.2. Review of Appeal by DCRA
Once an appeal is submitted, the Digital Connectivity Rating Agency (DCRA) concerned will
conduct a review of the rating assessment against indicated criteria or sub-criteria under
appeal. DCRA shall evaluate the grounds of appeal, verify the submitted evidence, and, if
necessary, conduct a re-evaluation of the property’s connectivity infrastructure for respective
parameter(s) as may be required.
A final decision on the appeal will be made within 60 days of receipt of the appeal, following
the process outlined by the Authority.
If the review finds merit in the appeal, DCRA may:
i. Revise the rating based on newly presented evidence.
ii. Uphold the original rating if no discrepancies or new qualifying factors are identified.
iii. Recommend corrective actions to the property manager for potential re-rating in the
future.
2038.3. Escalation of Appeal to the Authority
If the property manager is still not satisfied with the decision of the DCRA, they may escalate
the appeal to the Telecom Regulatory Authority.
i. The escalation must be filed within 30 days from the date of DCRA’s appeal decision.
ii. The appeal must be submitted in the prescribed format and include all necessary
documentation clearly indicating the point of appeal against the DCRA decision
iii. A specified fee, as determined by the Authority, must accompany the appeal
submission.
iv. No appeal shall be entertained by the Authority after expiry of the period as provided
under the regulations.
8.4. Examination of Appeal by Authority
Upon receiving an escalated appeal, the Telecom Regulatory Authority will conduct an
independent review to ensure that the final decision is fair and justified.
i. Independent Case Assessment: The Authority may directly evaluate the case
based on submitted evidence and regulatory provisions.
ii. Expert Panel Review: The Authority may appoint a specialized panel of experts
to conduct a detailed examination and provide recommendations.
The Authority shall ensure that all relevant technical, regulatory, and procedural aspects
are evaluated before making a final decision.
2049. Review and Updates of Rating Manual
To ensure that the Digital Connectivity Rating Manual remains relevant, accurate, and aligned
with industry advancements, a structured review and update process will be undertaken at
regular intervals. This process will account for technological evolution, regulatory changes,
stakeholder feedback, and performance insights, ensuring that the rating framework remains
effective in assessing and improving digital connectivity in properties.
9.1. Process for Periodic Updates
To maintain the relevance, accuracy, and effectiveness of the rating manual for digital
connectivity inside properties, periodic updates will be conducted through a structured and
inclusive approach.
The process begins with stakeholder feedback collection, where inputs from key entities such
as property managers, DCRAs, service providers, infrastructure providers, and technical
experts are gathered. This helps identify gaps, challenges, and areas for improvement in
existing rating criteria.
Based on insights from stakeholder feedback and benchmarking, a draft revision of the
manual will be developed, incorporating necessary modifications and refinements. This draft
will then undergo validation through expert reviews, where subject matter specialists will
assess the proposed changes to ensure technical accuracy, regulatory compliance, and
feasibility of implementation.
This structured process guarantees that the rating manual remains adaptive, future-ready,
and reflective of the latest industry advancements, thereby promoting high-quality, resilient,
and future-proof digital connectivity infrastructure in properties.
20510. Best Practices for Digital Connectivity in Properties
To ensure high-quality, resilient, and future-ready digital connectivity in properties, a
structured set of guidelines and best practices help to minimize cost, improve aesthetics, and
improve user experience. These best practices are indicative in nature to help property
managers, infrastructure providers, and service providers in designing and implementing
digital connectivity solutions that meet current and future technological requirements while
ensuring seamless user experience.
10.1. Best Practices for Digital Connectivity
To ensure high-quality digital connectivity in properties, the following best practices should
be adopted:
i. Digital Connectivity Infrastructure Planning
Digital connectivity infrastructure should be planned right from the building design
stage like plan for water, fire system and electricity. Incorporating digital
connectivity infrastructure during the initial design phase of a property is critical for
seamless deployment of broadband and wireless technologies while reducing
considerable cost compared to retrofitting of DCI.
Key considerations include:
a. Conduit and Cable Pathways: Ensuring dedicated and well-structured
pathways for fiber optic and ethernet cables, avoiding bottlenecks and future
installation challenges.
b. Dedicated Telecom Spaces: Allocating sufficient space for telecom
rooms/telecom area, network equipment and distribution points within the
building.
c. Regulatory Compliance: Aligning digital connectivity infrastructure with
Model Building Bye-Laws (MBBL), National Building Code (NBC), and telecom
regulations to avoid future rework or legal issues.
d. Collaboration with Service Providers: Engaging with service providers
and DCI design experts in early in the project to ensure optimal network design.
The National Building Code may be referred to for further details which provides
detailed guidelines for planning digital connectivity/ ICT infrastructure in the
buildings.
206ii. High Speed Internet Readiness:
To meet the increasing demand for high-speed, low-latency internet, properties
should:
a. Deploy fiber optic backbone connectivity as the primary infrastructure for
internet distribution. Fiber-optic networks offer higher bandwidth capacity,
faster speeds, and lower latency compared to traditional copper-based
networks.
b. Ensure multiple fiber entry points in the property to enable connectivity
from different ISPs, increasing network resilience and competition-driven
pricing benefits for end-users.
c. Provision scalable bandwidth options to accommodate future demands,
ensuring seamless support for 5G, IoT, AI applications, and cloud services.
d. Implement structured cabling systems (Category 6/6A and fiber optic
cabling) for internal network distribution, ensuring high-speed connectivity
across all areas of the property.
iii. Wireless Network Optimization
Wireless connectivity plays a pivotal role in digital infrastructure, and optimized
in-building solutions are essential for ensuring uninterrupted coverage and high-
speed connectivity. Key strategies include:
a. Distributed antenna systems (DAS): Deploying DAS solutions to enhance
cellular coverage in large properties, high-rise apartments, and commercial
spaces, eliminating dead zones.
b. Small cells deployment: Installing small cell technology in dense urban
environments to boost wireless network capacity, particularly for 4G and 5G
networks.
c. Wi-Fi offloading and optimization: Implementing high-density Wi-Fi
solutions to offload mobile data traffic, ensuring optimal indoor coverage and
performance.
d. Intelligent network management: Leveraging AI-driven self-optimizing
networks (SON) to dynamically adjust power levels, frequencies, and coverage
areas for enhanced user experience.
207iv. Redundancy and Resilience
To prevent service disruptions and downtime, properties must integrate robust
redundancy and resilience measures in their digital connectivity infrastructure.
These include:
a. Multiple ISP Connections: Establishing connectivity from two or more
internet service providers to ensure a failover in case of a primary network
outage.
b. Backup Power Supply: Ensuring continuous operation of network
equipment through uninterrupted power supply (UPS)/ battery backups, and
generators.
c. Alternate Routing Paths: Designing redundant cable pathways to prevent
single points of failure, ensuring continuous connectivity even in case of fiber
cuts or infrastructure damage.
d. Disaster Recovery Plans: Implementing automated failover mechanisms to
restore network swiftly after failures.
v. Smart Building Integration
Smart buildings integrate IoT-enabled sensors, automation, and AI-driven
management systems to enhance connectivity performance, energy efficiency, and
security. Key aspects include:
a. Smart network monitoring: Using AI-powered network analytics to detect
anomalies, optimize bandwidth allocation, and proactively resolve connectivity
issues.
b. Energy efficient networking: Utilizing power-saving features in network
devices and employing smart energy management systems to reduce operational
costs and environmental impact.
c. Integration with Smart Building Management Systems (BMS):
Enabling real-time control of network operations through a centralized BMS for
efficient fault detection and system management.
208vi. Future Proofing
Properties must be designed with future-ready digital connectivity infrastructure to
support emerging technologies and next-generation network advancements.
Future-proofing measures include:
a. 5G ready infrastructure: Deploying fiber-based backhaul and small cell
solutions to accommodate 5G deployment within buildings.
b. Edge computing integration: Ensuring support for edge data centers within
properties to minimize latency and improve data processing for smart
applications, AR/VR, and AI-driven analytics.
c. IPv6 adoption: Implementing IPv6-compliant networks to accommodate the
growing number of connected devices and ensure future scalability.
10.2. Integration of Connectivity Infrastructure in Design and Construction
To achieve seamless integration of digital connectivity infrastructure in building design and
construction, following may be considered:
i. Pre-wiring for connectivity: Include dedicated ducts and cable trays for fiber,
ethernet, and power cables.
ii. Structured cabling standards: Adopt structured cabling solutions in
compliance with national standards of BIS, TEC, etc.
iii. Equipment rooms and space allocation: Allocate space for telecom
equipment, server rooms, and network operation centers within the building.
iv. Network equipment: Plan sufficient network equipment in common areas,
lobbies, workspaces, and residences to ensure seamless connectivity based on
expected footfall and traffic.
10.3. Collaboration with stakeholders
Property managers should collaborate with concerned stakeholders right from planning
stage to build resilient and future ready DCI in the properties and facilitate RoW permissions
for telecom, internet service providers and digital connectivity infrastructure providers to
deploy fiber and wireless solutions efficiently. Collaboration with end users and
understanding their needs is the best way to plan and deliver digital connectivity
infrastructure which meets the expectations.
20921011. Appendix
11.1. Frequently Asked Questions (FAQ)
i. What is the purpose of Digital Connectivity Rating for properties?
The Digital Connectivity Rating is an initiative by the Telecom Regulatory Authority of
India (TRAI) to assess and benchmark the quality of digital connectivity within
properties. The primary objective is to encourage property managers to build digitally
connected and future ready smart properties and assess whether properties are equipped
with robust digital infrastructure, enhancing user experience for tenants, residents, and
businesses.
ii. What is the regulatory framework for the rating system?
Digital Connectivity Rating is governed by the provisions in “Rating of Properties for
Digital Connectivity Regulations, 2024” and further follow-up orders or guidelines issued
by TRAI.
iii. What parameters are assessed in the rating process?
The rating system evaluates properties based on the rating criteria provided in the
regulations. Some of the key aspects assessed under the framework include:
a. Availability of Connectivity Options: Access to mobile networks
(2G/3G/4G/5G), Wi-Fi, fiber broadband, and private networks.
b. Indoor Coverage Quality: Signal strength and coverage within the building,
including basements, elevators, and floors.
c. Digital Infrastructure Readiness: Deployment of in-building solutions (IBS),
distributed antenna systems (DAS), small cells and optical fiber backbones.
d. Network and power Redundancy: Availability of backup connectivity and power
sources to ensure uninterrupted services.
e. Future-Readiness: Scalability and ease of integration with advanced technologies,
including 5G and IoT solutions.
211iv. Who benefits from this rating system?
a. Property Managers: Gain recognition and competitive advantage by providing
high-quality digital infrastructure.
b. Consumers: Enjoy uninterrupted connectivity for work, entertainment, and
communication.
c. Service Providers: Identify opportunities for infrastructure upgrades and
improved service delivery.
d. Government Authorities and Regulators: Promote digital connectivity
infrastructure and ensure consumer trust and protection. The improved digital
connectivity further drives digital economy and business opportunities in the country.
v. Is the Digital Connectivity Rating mandatory under TRAI regulations?
Currently, the rating system is voluntary. However, TRAI strongly encourages
participation by property developers and property owners, and service providers to plan
digital connectivity in the real estate sector from its inception and get it rated under TRAI
rating framework.
vi. What types of properties are covered under the rating framework?
The rating framework applies to all property types, including:
a. Residential complexes
b. Office spaces and commercial properties
c. Malls and retail outlets
d. Educational institutions
e. Healthcare facilities
f. Airports
g. Metro rail
h. Stadiums and open spaces
vii. What is the objective of classification of Properties for Rating?
The objective of classification or grouping of properties is solely for the purpose of
applying the rating criteria which are relevant to assess the digital connectivity in the
respective category or group of properties.
212viii. What challenges might property managers face in achieving higher ratings?
Property managers may encounter the following challenges:
a. Limited infrastructure for in-building solutions such as DAS or fiber backbone.
b. High costs are associated with upgrading outdated systems.
c. Difficulty in integrating services from multiple telecom service providers.
TRAI encourages collaborations between property managers and telecom providers to
overcome these barriers.
ix. Are there incentives for properties that achieve higher ratings?
While there are no mandatory financial incentives outlined by TRAI, properties with
higher ratings benefit from enhanced marketability, tenant satisfaction, and alignment
with smart city goals. Property managers may also see more demand for digital connected
properties.
x. How can property manager apply for the Digital Connectivity Rating?
On applications can be submitted through the process specified in TRAI’s guidelines.
Typically, this involves:
a. One time registration on rating platform
b. Apply for rating of property and provide relevant details
c. Choose the DCRA of your choice
d. Submit the application
e. The rating process starts.
xi. Where can I find TRAI’s official guidelines for the rating system?
TRAI’s regulation and orders/guidelines for the Digital Connectivity Rating framework
are available on its official website i.e. www.trai.gov.in.
xii. How does this initiative align with India’s telecom policy?
The rating system aligns with the objectives of the National Digital Communications
Policy (NDCP), 2018, which emphasizes:
a. Enhancing broadband penetration
b. Promoting ICT readiness across sectors
c. Ensuring affordable and reliable digital connectivity
By setting a rating framework for digital connectivity inside properties where more data
is used than at street or open areas, TRAI contributes broader goals of creating a digitally
inclusive society.
213xiii. How does the rating process promote innovation in building design?
By encouraging the integration of future-ready digital infrastructure, TRAI’s rating
system motivates property managers to adopt innovative solutions, such as:
a. Smart building technologies
b. Energy-efficient network equipment
c. Seamless integration of IoT devices and 5G networks
This fosters a more competitive and technology-driven property development.
xiv. What are the key provisions that the DCRA must evaluate to assess
compliance with the applicable Model Building Bye-Laws (MBBL) and
National Building Code (NBC)?
The DCRA needs to evaluate whether the property’s Digital Connectivity Infrastructure
(DCI) has been provided in the property as per the requirement of the latest applicable
National Building Code (NBC) issued by Bureau of Indian Standards (BIS) and Model
Building Bye-Laws (MBBL) issued by Ministry of Housing and Urban Affairs,
Government of India (MoHUA).
As per Regulation 24, for the purposes of rating for digital connectivity, MBBL issued by
MoHUA shall be referred in cases where Building Byelaws of Cities/State or Union
Territory do not have provisions for digital connectivity infrastructure.
For clarity and uniformity in assessment, the Authority has published a separate
“Checklist for compliance to MBBL and NBC in the Manual under Rating of Properties
for Digital Connectivity Regulations, 2024”. The DCRA shall undertake evaluation in
accordance with the items and compliance impact specified in the said Checklist, as
updated from time to time.
xv. After a property is rated, how is it ensured that its performance remains
consistent with the rating awarded?
The rating platform will have provisions to collect feedback, with supporting evidence,
from concerned stakeholders about maintenance or DCI performance issue, if any.
Based on the feedback received, DCRA can review the property’s rating and update it, if
necessary, as per provision of regulation 28. Before any change to the rating, the property
manager will be given 90 days to resolve the issues or address the deficiencies
communicated through the platform.
214xvi. How will the continuity of digital connectivity be ensured in the property in
case there is a change in property ownership or property manager?
The regulation 22 states that in case of change of property manager or property
ownership, the property manager shall ensure smooth transfer of digital connectivity
infrastructure to the new property manager for continuity of digital connectivity till the
validity of the rating certificate awarded in respect of the property, and may include
suitable provisions in the agreement to ensure compliance of the provisions of the
regulations and terms and conditions of the rating certificate, post transfer of the
property. The failure of the property manager to intimate the change of property manager
or ownership to the Authority shall be considered as contravention of the regulations.
xvii. If a property undergoes expansion, how is the existing rating received for the
property treated and what steps can the property manager take to cover the
expansion?
In the event of a property expansion, the existing rating remains valid only for the portion
originally assessed.
However, the property managers are encouraged to apply for a re-rating for entire
property or new rating for the expanded property area. (Refer regulation 29)
xviii. What is the objective of introducing design-stage assessment for properties
under construction?
The objective of introducing design-stage assessments for properties under construction
is to provide structured visibility of Digital Connectivity Infrastructure (DCI)
preparedness at the planning and construction stage, when properties are often marketed
and sold. This mechanism enables Property Managers to integrate digital connectivity
requirements into the building design in a systematic manner and allows prospective
buyers and tenants to understand the intended level of digital connectivity.
xix. Can the “Designed for XX Stars” certificate be used in marketing and
promotional materials?
Yes, the Property Manager may use the “Designed for XX Stars” certificate for marketing
purposes during the construction phase, provided it is clearly represented as a design-
stage assessment only. The certificate shall not be presented as a final Digital Connectivity
Rating and shall not mislead consumers regarding the final rating outcome.
xx. Will the design-stage star level be publicly visible on the rating platform?
Yes. The design-stage star level assessed by the DCRA shall be displayed on the rating
platform with a clear indication that it is based on design-stage evaluation and not a final
215Digital Connectivity Rating. This ensures transparency while preserving clarity between
design-stage preparedness and final rating.
xxi. Can the target star rating declared by the Property Manager guarantee the
final rating?
No. The target star rating declared by the Property Manager at the application stage
represents an intended level of digital connectivity preparedness. The final Digital
Connectivity Rating shall be determined solely on the basis of on-ground assessment
conducted during Due Diligence Stage–II after completion of construction and
implementation of Digital Connectivity Infrastructure.
xxii. What is the objective of introducing the Optional Digital Connectivity Audit?
The objective of introducing the Optional Digital Connectivity Audit is to provide Property
Managers with an opportunity to assess the present level of Digital Connectivity
Infrastructure (DCI) in their property for internal evaluation and improvement purposes,
without immediately applying for a Digital Connectivity Rating under the Regulations.
This mechanism is intended to encourage proactive enhancement of digital connectivity
and wider adoption of best practices, while preserving the integrity of the formal rating
framework.
xxiii. Is the Optional Digital Connectivity Audit mandatory before applying for a
Digital Connectivity Rating?
No. Participation in an Optional Digital Connectivity Audit is entirely voluntary. It is not
a prerequisite for applying for a Digital Connectivity Rating and shall have no bearing on
the outcome of any rating assessment conducted under the Regulations.
xxiv. Does the Optional Digital Connectivity Audit result in a rating or certificate
under the Regulation?
No. The Optional Digital Connectivity Audit does not constitute a Digital Connectivity
Rating, provisional rating, interim rating, or certification under the Regulations. It is
conducted outside the formal rating framework and is intended solely for internal use by
the Property Manager.
xxv. What is the role of the Rating platform in the Optional Digital Connectivity
Audit?
The Rating Platform facilitates only the initiation of the audit request and enables status
tracking for transparency in timelines. The platform does not evaluate, validate, review,
or endorse the audit findings. The audit engagement, scope, timelines, and fee structure
are mutually agreed between the Property Manager and the selected DCRA.
216xxvi. Can the indicative score or indicative star level mentioned in the audit report
be used for marketing or public communication?
No. Any indicative score or indicative star level provided in the audit report is non-
binding and intended solely for internal reference. It shall not be represented as a Digital
Connectivity Rating under the Regulations and shall not be used in marketing,
promotional materials, or public communication as an official rating.
11.2. List of Applicable Standards and References
i. TRAI Regulation on Rating of Properties for Digital Connectivity,2024
ii. National Building Code, 2016 as amended from time to time.
iii. Model Building Bye-Laws (MBBL), 2016 as amended from time to time.
11.3. Documents Checklist
Master checklist of supporting documents from property manager to be recorded and uploaded
by Digital Connectivity Rating Agency (DCRA) as applicable depending upon the category of
property i.e. Category ‘A’ or Category ‘B’ is as follows:
Record
maintenance
S.
Criteria Sub Criteria Supporting document evidence requirement
No.
(Upload/
DCRA level)
Approved DCI design documents by Record and
1.
Approved competent authority Upload
Digital
Design drawings certified by
2. Connectivity Record
Compliance to competent authority
Infrastructure
Applicable
(DCI) design Design compliance with MBBL and Record and
3. Model
NBC standards Upload
Building Bye
Laws (MBBL) As-build DCI is as per approved Record and
4.
and National design Upload
Building Code
Record and
5. (NBC) for
DCI
Photographs of DCI
Upload
implementation
Digital
as per approved
Connectivity Site inspection reports for DCI with Record and
6.
DCI design
design comparisons Upload
Testing and Commissioning
7. Record
certificates for DCI as applicable
217Record
maintenance
S.
Criteria Sub Criteria Supporting document evidence requirement
No.
(Upload/
DCRA level)
Building layout plans for DCI or ICT
Provision for infrastructure duly marked and Record and
8.
expansion of signed by DCRA and property Upload
telecom rooms manager
and cable Expansion feasibility reports – DCI
Provision in Record and
9. pathways or ICT infrastructure pathways and
Civil Upload
telecom rooms/telecom areas
Infrastructure,
over and Provision for Record and
10. Updated network diagrams
above MBBL expansion of Upload
and NBC mobile and
requirements, wireline Record and
11. Future expansion plans
for Ensuring connectivity Upload
Robust Digital
Connectivity Site photos showing maintenance Record and
12. Ease of access
pathways Upload
of DCI installed
for repair or
13. maintenance Maintenance checklists Record
Record and
14. Power layout diagrams
Upload
Redundancy of
Provision in power source
Record and
15. Load switchover testing reports
Power
Upload
Infrastructure,
Electrical system line diagram
over and Record and
16. including redundant input sources
above MBBL Upload
and UPS system(s)
or NBC
Whether all key DCI systems
requirements,
17. affecting service availability are on Record
for Ensuring UPS power
UPS?
Reliable backup for DCI
Whether UPS system has
Digital
18. Record
redundancy?
Connectivity
UPS switch over successfully tested
19. Record
during sample testing?
218Record
maintenance
S.
Criteria Sub Criteria Supporting document evidence requirement
No.
(Upload/
DCRA level)
Whether duration of UPS backup
Record and
20. matches with available test reports
Upload
with full DCI load?
Monitoring system high level Record and
21.
Power
diagram Upload
continuity
Capture monitoring system Record and
monitoring
22.
dashboard screenshot Upload
Record and
23. BMS system architecture diagrams
Upload
Test report on DCI power systems,
Record and
24. Building fire alarms and HVAC integration
Upload
Management with BMS
System
Sample test report on detection and
notification of main power supply Record and
25.
failure and takeover by Upload
generator/UPS for DCI
Ducts layout diagrams from different Record and
26. Availability of
external entry points for fiber/ DCI Upload
alternate entry
paths for digital
connectivity Pathway layout diagrams from ducts
Record and
27. to telecom room(s)/telecom area(s)
infrastructure
Upload
for fiber/ DCI
Digital
Connectivity
Site photos of whether DCI/telecom
Infrastructure
room(s)/telecom area(s) are above Record and
28. Resilience
ground floor as per design and Upload
Non-flooding implementation?
measures for
Site photos of whether key power
DCI installation
systems like UPS/ Generators for
Record and
29. DCI are installed on ground or
Upload
higher floor with non-flooding
consideration?
219Record
maintenance
S.
Criteria Sub Criteria Supporting document evidence requirement
No.
(Upload/
DCRA level)
Site photos of whether drainage
Record and
30. system is implemented as per design
Upload
layout?
Whether DCI is supported with
31. redundant power sources Record
(Generator/UPS)?
Whether power system network
Record and
32. layout for DCI is implemented with
Upload
path diversity?
Implementation
of redundancy
Whether sample test reports Record and
33. in power source
demonstrate testing of redundancy? Upload
and DCI paths
Whether path diversity for fiber and
other cables (DTH/ethernet as
applicable) across the building
Record and
34. blocks, basements and towers from
Upload
telecom/digital connectivity
infrastructure room(s)/telecom
area(s) is implemented?
Whether the equipment installed
Availability of
35. supports the latest generation of
the latest Record
mobile connectivity?
Future generation of
Readiness of mobile Photographs of installed latest
Record and
36. Digital connectivity generation mobile connectivity
Upload
Connectivity equipment
Infrastructure
Bill of Material (BoM) installed at
Support for
37. building along with datasheets for Record
future bands
relevant equipment
220Record
maintenance
S.
Criteria Sub Criteria Supporting document evidence requirement
No.
(Upload/
DCRA level)
Whether DCI supports future bands
Record and
38. for mobile or Wi-Fi network as
Upload
applicable as per datasheets?
Upgradability of existing wireline
DCI equipment’s
39. Record
(switches/routers/splitters/PON
Upgradability
etc.) and relevant cables
of wireline DCI
Whether the bandwidth supported
Record and
40. through optical fiber with speed 1
Upload
Gbps or higher?
41. Backhaul fiber Fiber testing results Record
connectivity
(service
Photographs of fiber termination
provider to Record and
42. point at main telecom room/telecom
property) Upload
area
Fiber layout diagrams up to user Record and
43.
Provision of premises Upload
Fiber
Wired
connectivity till
Connectivity
user premises
Sample fiber test reports confirming Record and
44. Infrastructure
connectivity to each user premise Upload
Fiber Network layout diagram for user
45. Record
connectivity in units showing fiber terminations
each room or
office or
commercial Sample test reports for fiber Record and
46.
space terminations testing Upload
221Record
maintenance
S.
Criteria Sub Criteria Supporting document evidence requirement
No.
(Upload/
DCRA level)
Telecom/Internet Service Provider
47. Number of Record
(ISP) Agreements
wireline
Internet Service
providers
Network integration certificates/test
48. having Record
reports
integration with
Digital
Connectivity
Record and
49. Service subscription status
Infrastructure
Upload
Availability of
Service
Providers
Walk/drive test results and/or RF Record and
50.
Number of coverage map in the property Upload
Mobile Service
providers
Network performance test results
51. having coverage Record
from multiple operators
or integration
with Digital
Connectivity Agreements signed with Telecom
52. Infrastructure Service Providers (without Record
commercial details)
Walk/drive test results and/or RF Record and
53.
coverage map of public areas Upload
Mobile network
coverage and
Service
Speed test logs, call setup time, call Record and
performance in
54.
Performance
setup success rate and call drop rate Upload
public areas of
property
Speed and coverage samples mapped Record and
55.
on the Layout maps (floors/areas) Upload
222Record
maintenance
S.
Criteria Sub Criteria Supporting document evidence requirement
No.
(Upload/
DCRA level)
Record and
56. Wi-Fi speed test results
Upload
Secure public
Wi-Fi network
coverage and
57. Wi-Fi security audit reports Record
performance in
public areas of
property
Speed samples mapped on the Record and
58.
Layout maps (floors/areas) Upload
Walk/drive test results and/or RF Record and
59.
coverage map of the area under test Upload
Mobile network
coverage and
Speed test logs, call setup time, call Record and
60. performance in
setup success rate and call drop rate Upload
non-public
areas
Speed and coverage samples mapped Record and
61.
on the Layout maps (floors/areas) Upload
62. Wi-Fi security certifications Record
Secure public
Wi-Fi network
Record and
63. coverage and Wi-Fi speed test results
Upload
performance in
non-public
Speed samples mapped on the Record and
64. areas
Layout maps (floors/areas) Upload
Average
download speed Record and
65. Speed test results with timestamps
of different Upload
wireline
223Record
maintenance
S.
Criteria Sub Criteria Supporting document evidence requirement
No.
(Upload/
DCRA level)
network(s) in
respective
Speed samples mapped on the Record and
66.
highest speed
Layout maps (floors/areas) Upload
plan
User feedback
User on digital User feedback logs from helpdesk Record and
67.
Experience connectivity systems Upload
experience
22411.4. User Feedback Form
This form is to evaluate the feedback of end user/ consumer on digital connectivity
experience in the property. Your feedback will help in assessing the level of digital
connectivity inside the property for award of Star rating under TRAI regulations.
(a) Name of property: _________, (b) URIN (As per rating platform):_________
(c) Type of property: ☐ Residential ☐ Commercial ☐ Government Properties
☐ Shopping mall ☐ Stadium ☐ Hospitality
☐ Transport corridor ☐ Other – Please specify:
(To be filled by DCRA)
Kindly provide your feedback on the scale of 1-5 by writing relevant number in the box
against respective questions. Score 1 (poor) being the lowest, 2 (average), 3 (good),
4 (very good) and 5 (Excellent) being the highest.
Provide rating
between 1 to 5
1. Mobile Service Performance
i. How would you rate your mobile voice call experience?
ii. Are you satisfied with mobile internet performance?
2. Broadband Service Performance
i. How would you rate the ease of provisioning of new broadband
connections?
ii. How satisfied are you with the speed of the internet connection?
iii. How will you rate the resolution mechanism?
3. Mobile Network Coverage
i. How would you rate the wireless network coverage in indoor spaces?
ii. How would you rate the wireless network coverage in outdoor areas?
4. Overall Experience
i. How would you rate the overall digital connectivity at this property?
5. Suggestions for Improvement
Signature of the end user/ consumer Signature of DCRA representative
Name :
Mobile No. :
Email-ID :
22511.5. Template for declaration of maximum chargeable fee by DCRA (As per
regulation)
The below table covers the template for declaration of maximum chargeable fee by Digital
Connectivity Rating Agency (DCRA) as per the Section I - “Code of Conduct for DCRAs” clause
(vii) “Clear fee structure” in the “Rating of Properties for Digital Connectivity Regulations,
2024”:
Property Maximum
Type of
S. Category Area in chargeable
Classification Property
No. or Group sq.ft./ length fee by DCRA
in km (in ₹ / sq.ft.)
50,000 -
100,000 sq.ft.
Apartments, >100,000 -
independent 500,000 sq.ft.
1. Residential A houses, gated >500,000 -
communities or 1000,000
societies, etc. sq.ft.
>1000,000
sq.ft.
50,000 -
All properties of
100,000 sq.ft.
the Central
>100,000 -
Government, the
500,000 sq.ft.
State Government,
Government >500,000 -
2. A Courts, Public
Properties 1000,000
Sector
sq.ft.
Undertakings,
Local Bodies, >1000,000
Heritage Sites, etc. sq.ft.
Commercial office 50,000 -
complex, shopping 100,000 sq.ft.
malls, industrial >100,000 -
estates, SEZs, 500,000 sq.ft.
Commercial
3. A convention >500,000 -
Establishments
centres, Hospitals, 1000,000
Hotels, sq.ft.
Educational >1000,000
Institutions, etc. sq.ft.
Other private Airport, Bus 50,000 -
4. B
or public areas Station, Railway 100,000 sq.ft.
226Property Maximum
Type of
S. Category Area in chargeable
Classification Property
No. or Group sq.ft./ length fee by DCRA
in km (in ₹ / sq.ft.)
Station, multi- >100,000 -
modal logistic 500,000 sq.ft.
parks etc. >500,000 -
1000,000
sq.ft.
>1000,000
sq.ft.
50,000 -
100,000 sq.ft.
Stadiums or
Stadiums or >100,000 -
permanent spaces
Sport Arenas or 500,000 sq.ft.
of gathering with
5. spaces of B >500,000 -
seating capacity of
frequent 1000,000
more than 5000
gathering sq.ft.
persons
>1000,000
sq.ft.
Expressways,
100-500 km
Highways,
Transport
6. B Railways routes,
corridors >500-1000 km
Metro corridors
etc. >1000 km
Note: The ‘Property Area’ includes all areas like ground, basements, and other covered
/uncovered floors used by the residents or occupants or visitors.
***
227Annexure-IV
Declaration by Property Manager for Under-Construction Property
1. Declaration of Target Digital Connectivity Rating
I/ We, the undersigned, hereby declare that the DCI design of above-mentioned under-
construction property is targeted to achieve Digital Connectivity Rating of ______
Star(s) under the Rating of Properties for Digital Connectivity Regulations, 2024.
I/ We understand that this target rating is indicative and that the final rating shall be
awarded solely on the basis of actual assessment conducted by the concerned Digital
Connectivity Rating Agency (DCRA) in accordance with the applicable Regulations and
the Rating Manual.
2. Plan for Achieving the Declared Target Rating
I/ We further declare that, in addition to the standard requirements under the Application
for Rating of Property, a Sub-Criteria wise implementation plan for achieving the
declared target rating is being submitted along with this declaration.
The plan is provided in a structured tabular format, wherein details are specified against
each applicable criterion and sub-criterion under the Digital Connectivity Rating
framework, including:
i. the proposed measures, design provisions, or infrastructure planning to achieve
compliance; and
ii. the reference to relevant supporting documents.
All supporting documents referenced in the table are attached along with this declaration
or uploaded on the Digital Connectivity Rating Platform, as applicable.
2283. Sub-Criteria wise Plan and Supporting Documents (to be filled by Property
Manager):
Reference
Proposed Plan / Design Supporting
Criteria Target
Criteria Sub-Criteria Provision to Achieve Document /
No. Score
Target Score Response to
Questions
1.1 Approved DCI
1. Approved design
design
Compliance to 1. Provide compliance documents / building
applicable Model details based on plan / layout plans
Building Bye Laws “Checklist for etc.
1 (MBBL) and National compliance to MBBL and 2. “Checklist for
Building Code (NBC) NBC” and attach with compliance to MBBL
1.2 DCI
for digital this declaration. and NBC”
implementation as per
connectivity 2. Any other details…. 2. Any other relevant
approved DCI design
document
1. Does your property
have provision for
expansion of telecom 1. Approved design
2.1 Provision for room/ telecom areas, documents / building
expansion of telecom horizontal and vertical plan / layout plans
rooms and cable pathways in design etc.
pathways documents / layout plans 2. Any other relevant
Provision in civil as per 4.2.1 of rating document
infrastructure, over manual?
and above MBBL and 2. Any other details…
2
NBC requirements, 1. Is provision for
for ensuring robust expansion of mobile and
digital connectivity wireline connectivity 1. Approved design
2.2 Provision for planned as per 4.2.2 of documents / building
expansion of mobile Rating Manual and plan / layout plans
and wireline present in design etc.
connectivity documents / layout plans 2. Any other relevant
etc.? document
2. Any other details…
229Reference
Proposed Plan / Design Supporting
Criteria Target
Criteria Sub-Criteria Provision to Achieve Document /
No. Score
Target Score Response to
Questions
1. Is provision for
physical accessibility and 1. Approved design
labelling planned as per documents / building
2.3 Ease of access of
4.2.3 of Rating manual plan / layout plans
DCI installed for repair
and present in design etc.
or maintenance
documents / layout plans 2. Any other relevant
etc.? document
2. Any other details…
1. Is Redundant power
source planned for all 1. Power layout
3.1 Redundancy of digital connectivity diagrams.
power source services as per 4.3.1 of 2. Any other relevant
Rating Manual? document
2. Any other details…
1. Is UPS power backup
for important DCI 1. Electrical system
3.2 UPS power backup components planned as line diagram
for DCI per 4.3.2 of Rating 2. Any other relevant
Manual? document
2. Any other details…
Provision in power
infrastructure, over
1. Is Power monitoring
and above MBBL or
3 system being
NBC requirements,
implemented/provisioned
for ensuring reliable
as per 4.3.3 of Rating
digital connectivity
Manual? Will the 1. Monitoring system
3.3 Power continuity dashboard in monitoring high level diagram
monitoring system cover end-to-end 2. Any other relevant
health status monitoring document
of all power system as
per 4.3.3 of Rating
Manual?
2. Any other details…
1. Is BMS being
1. BMS system high
implemented/provisioned
3.4 Building level diagram
as per 4.3.4 of Rating
Management System 2. Any other relevant
Manual? Is BMS
document
integration planned to
230Reference
Proposed Plan / Design Supporting
Criteria Target
Criteria Sub-Criteria Provision to Achieve Document /
No. Score
Target Score Response to
Questions
cover power, fire alarm
and HVAC for telecom
room(s)/ telecom area(s)
in the property as per
4.3.4 of Rating Manual?
2. Any other details…
1. Is there provision of
alternate duct and cable 1. Ducts and
4.1 Availability of
pathway routes till Pathway layout
alternate entry paths
telecom rooms / telecom diagram
for digital connectivity
areas as per 4.4.1 of 2. Any other relevant
infrastructure
Rating Manual? document
2. Any other details….
1. Are non-flooding 1. Design and layout
Digital Connectivity 4.2 Non-flooding
measures taken as per documents
4 Infrastructure measures for DCI
4.4.2 of Rating Manual? 2. Any other relevant
Resilience installation
2. Any other details…. document
1. Is there provision of
redundant paths for
1. Power and cable
4.3 Implementation of power system to DCI and
layout diagrams
redundancy in power fiber path in the property
2. Any other relevant
source and DCI paths as per 4.4.3 of Rating
document
Manual?
2. Any other details…
1. Whether the
planned/installed 1. List of latest
equipment supports the generation mobile
Future Readiness of 5.1 Availability of the
latest generation of connectivity
5 Digital Connectivity latest generation of
mobile connectivity as equipment
Infrastructure mobile connectivity
per 4.5.1 of the rating 2. Any other relevant
manual? document
2. Any other details…
231Reference
Proposed Plan / Design Supporting
Criteria Target
Criteria Sub-Criteria Provision to Achieve Document /
No. Score
Target Score Response to
Questions
1. BoM or List and
1. Is there provision of
datasheets of
supporting future bands
5.2 Support for future infrastructure
in infrastructure as per
bands installed /planned
4.5.2 of Rating Manual?
2. Any other relevant
2. Any other details…
document
1. Is there provision for 1. Document to
planned fiber-optic demonstrate
5.3 Upgradability of network to be scaled and upgradability of
wireline DCI upgraded as per 4.5.3 of wireline DCI
rating manual? 2. Any other relevant
2. Any other details… document
1. For how many
different type of service
providers have you
provisioned backhaul
6.1 Backhaul fiber fiber connectivity as per
connectivity (service 4.6.1 of rating manual?
provider to property) 2. How many tie-ups with
service providers do you
have right now for the
property?
3. Any other details…
Provision of Wired
1. % of unit within the
6 Connectivity
property planned for fiber
infrastructure 6.2 Fiber connectivity
connectivity as per 4.6.2
till user premises
of the rating manual?
2. Any other details…
1. % of unit within the
property where fiber
connectivity is planned in
6.3 Fiber connectivity
each room/ office/
in each room or office
commercial space as per
or commercial space
4.6.3 of the rating
manual?
2. Any other details…
232Reference
Proposed Plan / Design Supporting
Criteria Target
Criteria Sub-Criteria Provision to Achieve Document /
No. Score
Target Score Response to
Questions
1. For how many internet
service providers have
you provisioned
7.1 Number of wireline
capability to integrate
Internet Service
with DCI as per 4.7.1 of
providers having
the rating manual?
integration with Digital
2. How many tie-ups with
Connectivity
service providers do you
Infrastructure
have right now for the
property?
3. Any other details…
Availability of Service 1. For how many service
7
Providers providers is coverage
planned for 4G/5G
services in the property
7.2 Number of Mobile either through integration
Service providers with DCI or otherwise as
having coverage or per 4.7.2 of rating
integration with Digital manual? What is the
Connectivity expected coverage for
Infrastructure each service provider?
2. How many tie-ups with
service providers do you
have right now for the
property?
3. Any other details…
1. For how many service
providers is mobile
coverage for 4G/5G
services planned in public
8.1 Mobile network
areas (including common
coverage and
8 Service Performance area, lifts, and basements)
performance in public
of the property as per
areas of property
4.8.1 of rating manual?
2. What is the expected
mobile coverage and
minimum download
233Reference
Proposed Plan / Design Supporting
Criteria Target
Criteria Sub-Criteria Provision to Achieve Document /
No. Score
Target Score Response to
Questions
speed for 4G/5G
technology of each
service provider in these
areas as per 4.8.1 of
rating manual?
3. Any other details…
1. Is there provision of
Wi-Fi coverage in public
areas (including lifts and
basements) of property as
per 4.8.2 of rating
8.2 Secure public Wi-
manual?
Fi network coverage
2. What is the expected
and performance in
coverage and minimum
public areas of
download speed from Wi-
property
Fi in public areas as per
4.8.2 of rating manual?
For how many users is it
being planned?
3. Any other details…
1. For how many service
providers is mobile
coverage for 4G/5G
services planned in non-
public areas of the
property as per 4.8.3 of
8.3 Mobile network rating manual?
coverage and 2. What is the expected
performance in non- mobile coverage and
public areas minimum download
speed for 4G/5G
technology of each
service provider in these
areas as per 4.8.3 of
rating manual?
3. Any other details…
234Reference
Proposed Plan / Design Supporting
Criteria Target
Criteria Sub-Criteria Provision to Achieve Document /
No. Score
Target Score Response to
Questions
1. Is there provision of
Wi-Fi coverage in non-
public areas of property
as per 4.8.4 of rating
manual?
8.4 Secure public Wi- 2. What is the expected
Fi network coverage coverage and minimum
and performance in download speed from Wi-
non-public areas Fi in non-public areas as
per 4.8.4 of rating
manual?
For how many users is it
being planned?
3. Any other details…
1. Are there provisions
for wireline network in
the property as per 4.8.5
of Rating Manual?
2. For how many wireline
8.5 Average download network or service
speed of different providers have you
wireline network(s) in provisioned capability to
respective highest provide wireline network
speed plan in the property and what
is the expected download
speed of wireline network
as per 4.8.5 of Rating
Manual?
3. Any other details…
9.1 User feedback on
9 User Experience digital connectivity
experience
Notes:
235i. The target scores indicated above are indicative and based on design-stage planning.
Final scores shall be determined solely based on assessment during Due Diligence
Stage II.
ii. Only applicable criteria and sub-criteria shall be filled, as per the classification of the
property under Category ‘A’ or Category ‘B’. For Category ‘B’ properties, Criteria
No. 1 and Criteria No. 2 are not applicable and need not be filled in the above table.
iii. Details provided should be sufficient to demonstrate intent, feasibility, and design-stage
compliance, without requiring final as-built evidence.
iv. In respect of those criteria and sub-criteria which involve parameters (such as network
speed, coverage, no. of service providers etc.) that cannot be physically verified during
the under-construction stage, the assessment shall be based on the structured responses
provided in this declaration and the supporting documentary evidence submitted by the
Property Manager. Such assessment shall be indicative in nature and subject to
verification during Due Diligence Stage–II upon completion of construction and
commissioning of Digital Connectivity Infrastructure.
v. Reference documents may include approved design documents, building plans,
architectural drawings, layout plans, digital connectivity infrastructure designs,
schematics, or other relevant technical documents related to Digital Connectivity
Infrastructure.
I/ We hereby confirm that information provided in this declaration, the accompanying plan,
and supporting documents are true, correct, and complete to the best of our knowledge
and belief. I/ We shall extend full cooperation to the DCRA during assessment and comply
with all applicable provisions of the Regulations and the Rating Manual.
(Signature of authorized signatory with seal if applicable)
236Date:
Name:___________________
Designation:___________________
Contact No:___________________
E-mail Id:___________________
[To be signed by duly authorised person on behalf of organization]
***
237Annexure-V
Indicative Template for Optional Digital Connectivity Audit Report
(The following template is illustrative in nature and indicates the minimum details that may
be covered in an Optional Digital Connectivity Audit Report. DCRAs and Property
Managers may mutually agree to include additional details, as appropriate.)
1. Basic Details
(At a minimum, the following details may be included:)
(i) Name of Property
(ii) Property Address
(iii) Category of Property (Category ‘A’ / Category ‘B’)
(iv) Name and contact details of Property Manager
(v) Name of DCRA Conducting Audit
(vi) DCRA Registration ID (as per Rating Platform)
(vii) Date(s) of Audit (start and completion)
(viii) Any other relevant identification details
2. Disclaimer
(The report shall clearly indicate the following:)
(i) This Optional Digital Connectivity Audit has been conducted based on mutual
engagement between the Property Manager and the DCRA.
(ii) This audit is intended solely for internal evaluation and improvement purposes of
the Property Manager. This shall not create any right, expectation, or entitlement
with respect to award of a Digital Connectivity Rating.
(iii) Participation in such optional audit shall not be a prerequisite for applying for a
Digital Connectivity Rating and shall not have any bearing on the outcome of a
rating assessment undertaken under the Regulations.
238(iv) Any indicative score or indicative star level, if mentioned, shall be clearly marked
as non-binding and for internal reference only.
3. Summary of Audit (Including Indicative Positioning, if Mutually Agreed)
(The report may include:)
(i) Table of criteria and sub-criteria along with indicative scores (if calculated)
(ii) Overall indicative total score and indicative star level (clearly marked as non-
binding)
(iii) Potential improvement scenario after implementation of recommended actions
4. Sub-Criteria-wise Detailed Assessment
(For each applicable sub-criterion, the following minimum information may be covered.
Emphasis may be placed on sub-criteria where gaps are observed.)
For each applicable sub-criterion:
(i) Sub-Criterion Name / Code
(ii) Present Status of Digital Connectivity
(iii) Evidence Provided and/or Verified
(iv) Gap Identified (if any)
(v) Recommended Action for Property Manager and scope of improvement
(vi) Priority or impact level (if indicated)
(vii) Any additional information considered relevant by the DCRA
5. Declaration by DCRA
(An appropriate declaration may be included covering, inter alia, the following:)
(i) This Optional Digital Connectivity Audit has been conducted in good faith based
on the information, documentation, and access provided by the Property Manager.
(ii) This report shall not be construed as a Digital Connectivity Rating under the
Regulations and shall not create any entitlement or expectation with respect to
award of a Digital Connectivity Rating.
239(iii) This report reflects the status of Digital Connectivity Infrastructure as assessed on
[DD/MM/YYYY]. Any improvement or deterioration in digital connectivity
infrastructure occurring after this date are not covered in this report and may alter
the observations, findings, or indicative positioning contained herein.
6. Signature along with DCRA Details
(i) Authorized Signatory of DCRA :_________________
(ii) Name :________________
(iii) Designation :_______________________
(iv) DCRA Registration ID (as per Rating Platform) :_________________
(v) Date :_____________________
***
240Appendix-A: Office
Memorandum of DoT
dated 09th July 2025Annexure-A