Date: 2014-12-19Category: Extra OrdinaryState: Union GovernmentCountry: India
CORRIGENDUM. This Authority had passed an Order No. TAMP-43-2013-KPT dated 4 October, 2013 with reference to the proposal from the Kandla Port Trust (KPT) for notification of Reference tariff for Mega Container Terminal Project at Tuna-Tekra at Kandla Port Trust under Public Private Partnership.
Executive Summary:
This document is a corrigendum to a previous order (No. TAMP/43/2013-KPT) issued by the Tariff Authority for Major Ports (TAMP) on October 4, 2013, regarding the reference tariff for the Mega Container Terminal Project at Tuna-Tekra, Kandla Port Trust. The original order was notified on October 21, 2013. This corrigendum addresses a typographical error in the storage charge for Non-ICD CFS Export Empty containers. It was passed on December 2, 2014.
Key Points / Main Content:
Correction of Typographical Error:
* The document corrects a typographical error in the storage charge for Non-ICD CFS Export Empty containers exceeding 40 feet in length, specifically for the seventh slab (1922 days) of dwell time charges.
* The corrected storage charge in Schedule 3.2, Sl. No. 4 for Non-ICD CFS Export Empty containers after 1922 days is revised from ₹33273.59 to ₹3273.59.
Reference to Previous Order:
* The corrigendum refers to Order No. TAMP/43/2013-KPT dated October 4, 2013, which concerned the reference tariff for the Mega Container Terminal Project at Tuna-Tekra, Kandla Port Trust.
* The original order was made in pursuance of the Revised Guidelines for determination of Tariff for Projects at Major Ports, 2013.
Notification Details:
* The original order was notified in the Gazette of India Extraordinary Part III Section 4 on October 21, 2013, vide Gazette No. 275.
Impact Analysis:
Kandla Port Trust (KPT):
Impact: KPT needs to implement the corrected storage charges for Non-ICD CFS Export Empty containers as specified in the corrigendum.
Action Required: Update billing systems and inform relevant personnel about the corrected charges.
Mega Container Terminal Project Stakeholders:
Impact: Stakeholders involved in the Mega Container Terminal Project at Tuna-Tekra will be affected by the corrected tariff.
Action Required: Review and adjust financial planning and operational costs based on the corrected storage charges.
Exporters and Importers Using Kandla Port:
Impact: Exporters and importers utilizing Kandla Port for Non-ICD CFS Export Empty containers may experience a change in storage costs.
Action Required: Be aware of the corrected storage charges and adjust logistics and financial planning accordingly.
Key Entities Referenced
Tariff Authority for Major Ports: An authority responsible for determination of tariff for projects at major ports in India.
New Delhi: The capital city of India, where the notification was issued.
Kandla Port Trust: A major port trust in India, specifically mentioned in relation to a Mega Container Terminal Project.
Tuna-Tekra, Gujarat: Location of the Mega Container Terminal Project at Kandla Port Trust.
Public Private Partnership: A collaborative agreement between a government entity and a private company to finance, build, and operate projects.
Revised Guidelines for determination of Tariff for Projects at Major Ports, 2013: A set of guidelines used to determine the tariff for projects at major ports.
TAMP432013KPT: Order number related to the proposal from the Kandla Port Trust.
T.S. BALASUBRAMANIAN: Member Finance.
pjftLVªh laö Mhö ,yö&33004@99 REGD. NO. D. L.-33004/99
vlk/kj.k
EXTRAORDINARY
Hkkx III—[k.M 4
PART III—Section 4
izkf/dkj ls izdkf'kr
PUBLISHED BY AUTHORITY
la- 373] ubZ fnYyh] 'kqØokj] fnlEcj 19] 2014@vxzgk;.k 28] 1936
No. 373] NEW DELHI, FRIDAY, DECEMBER 19, 2014/AGRAHAYANA 28, 1936
eeeeggggkkkkiiiiRRRRrrrruuuu iiii’’zz’’zz kkkkYYqqYYqq dddd iiiizkzkzkzkffff////kkkkddddjjjj....kkkk
‘‘‘‘kkkkffqqffqq))))iiii====
¼¼¼¼ffffnnnnllllEEEEccccjjjj 2222000011114444 dddd ss ss2222jjjj ss ssffffnnnnuuuu iiiikkkkffffjjjjrrrr½½½½
eEqcb]Z 10 fnlEcj] 2014
llll--aa--aa VVVVhhhh,,,,,,,,eeeeiiiihhhh@@@@44443333@@@@2222000011113333&&&&ddddiissiiss hhhhVVVVhhhh----&&&&&&&&bl izkf/kdj.k u s egkiRruk ssa e sa ifj;kts ukvk sa d s fy, i’z kYq d d s fu/kkZj.k gsr q l’a kkfs/kr fn’kkfun’sZ k] 2013] ftl s vf/klpw uk
l-a Vh,,eih@18@2013&fofo/k fnukda 30 flrEcj] 2013 }kjk vf/klfwpr fd;k x;k Fkk] d s vuqlj.k e sa lkotZ fud futh Hkkxhnkjh ¼ihihih½ d s rgr dkMa yk iRru U;kl
e sa ruq k&rds jk e sa exs k dVa us j VfeuZ y ifj;kts uk d s fy, lna Hk Z i’z kYq d dh vf/klpw uk gsr q dkMa yk iRru U;kl ¼dis hVh½ l s izkIr g,q izLrko d s lna Hk Z e as ,d vkn’s k
l-a Vh,,eih@43@2013&dis hVh fnukda 4 vDrcw j] 2013 ikfjr fd;k FkkA ;g vkn’s k 21 vDrcw j] 2013 dk s jkti= l a 275 }kjk Hkkjr dk jkti=] vlk/kkj.k ¼Hkkx III&[kMa 4½
ea sa vf/klfwpr fd;k x;k FkkA
2- lkro sa LycS vFkkZr ~ 19&22 fnu d s fy, 40^ l s vf/kd d s dVa us j d s fy, iRru ifjlj e sa dVa us j HkMa kj.k gsr q vuqlpw h 3-2&fojke le; iHzkkj e as Ø-l-a 4
xSj&vkbZlhMh@lh,Q,l fu;kZr&vk;kr dVa us j e sa fu/kkfZjr HkMa kj.k iHzkkj e sa ,d vlko/kkuho’k gbq Z Vkbfixa lca /akh =fqV n[s kh xb Z gAS 21 vDrcw j] 2013 dk s vf/klfwpr njeku e as idz V
izklfaxd en d s fy, HkMa kj.k iHzkkj vkSj fd;k x;k ‘kk/sku uhp s fn;k x;k g%S&&
vvvv////;;;;kkkk;;;; 3333]]]] vvvvuuuuqlqlqlqlppwwppww hhhh 3333----2222]]]] ØØØØ----llll--aa--aa 4444]]]] vvvvffff////kkkkllllppwwppww uuuukkkk eeee sasa sasa;;;;FFFFkkkkkkkk iiiiddzzddzz VVVV llllkkkkrrrrooookkkk aa aaLLLLyyyyccSSccSS vvvv////;;;;kkkk;;;; 3333]]]] vvvvuuuuqlqlqlqlppwwppww hhhh 3333----2222]]]] ØØØØ----llll--aa--aa 4444]]]] llllkkkkrrrrooookkkk aa aaLLLLyyyyccSSccSS ddddkkkk ss ssffffuuuuEEEEuuuuoooorrrr ~~ ~~iiii<<<<kk++kk++ ttttkkkk,,,,
iiiiRRRRrrrruuuu iiiiffffjjjjlllljjjj eeee sasa sasaHHHHkkkkMMaaMMaa kkkkffffjjjjrrrr ddddVVaaVVaa uussuuss jjjj dddd ss ssffffyyyy,,,, ffffoooojjjjkkkkeeee lllleeee;;;; iiiiHHzzHHzzkkkkkkkkjjjj%%%% iiiiRRRRrrrruuuu iiiiffffjjjjlllljjjj eeee sasa sasaHHHHkkkkMMaaMMaa kkkkffffjjjjrrrr ddddVVaaVVaa uussuuss jjjj dddd ss ssffffyyyy,,,, ffffoooojjjjkkkkeeee lllleeee;;;; iiiiHHzzHHzzkkkkkkkkjjjj%%%%
nnnnjjjj iiiiffzzffzzrrrr ddddVVaaVVaa uussuuss jjjj iiiiffzzffzzrrrrffffnnnnuuuu vvvvFFFFkkkkooookkkk mmmmllllddddkkkk HHHHkkkkkkkkxxxx (```` eeee )ssaassaa nnnnjjjj iiiiffzzffzzrrrr ddddVVaaVVaa uussuuss jjjj iiiiffzzffzzrrrrffffnnnnuuuu vvvvFFFFkkkkooookkkk mmmmllllddddkkkk HHHHkkkkkkkkxxxx (```` eeee)aassasas
ØØØØ----llll--aa--aa ffffoooooooojjjj....kkkk
22220000^^^^ llll ss ssvvvvffff////kkkkdddd
ØØØØ----llll--aa--aa ffffoooooooojjjj....kkkk
22220000^^^^ llll ss ssvvvvffff////kkkkdddd 44440000^^^^ yyyyEEEEcccckkkkbbbb ZZ ZZllll ss ss
22220000^^^^ yyyyEEEEcccckkkkbbbb ZZ ZZrrrrdddd 44440000^^^^ yyyyEEEEcccckkkkbbbb ZZ ZZllll ss ssvvvvffff////kkkkdddd 22220000^^^^ yyyyEEEEcccckkkkbbbb ZZ ZZrrrrdddd
44440000^^^^ yyyyEEEEcccckkkkbbbb ZZ ZZrrrrdddd 44440000^^^^ yyyyEEEEcccckkkkbbbb ZZ ZZrrrrdddd vvvvffff////kkkkdddd
4 xSj&vkbZlhMh@lh,Q,l fu;kZr & [kkyh 4 xSj&vkbZlhMh@lh,Q,l fu;kZr & [kkyh
19-22 fnu 1091.20 2182.40 33273.59 19-22 fnu 1091.20 2182.40 3273.59
Vh- ,l- ckyklqcgz ~e.;u] lnL; foÙk
[foKkiu&III@4@vlk-@143@2014]
5038 GI/2014 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC. 4]
TARIFF AUTHORITY FOR MAJOR PORTS
CORRIGENDUM
(Passed on this 2nd day of December, 2014)
Mumbai, the 10th December, 2014
No. TAMP/43/2013-KPT.—This Authority had passed an Order No. TAMP/43/2013-KPT dated 4 October,
2013 with reference to the proposal from the Kandla Port Trust (KPT) for notification of Reference tariff for Mega
Container Terminal Project at Tuna-Tekra at Kandla Port Trust under Public Private Partnership (PPP) in pursuance of
the Revised Guidelines for determination of Tariff for Projects at Major Ports, 2013, which was notified vide Notification
No. TAMP/18/2013-Misc. dated 30 September, 2013. This Order was notified in the Gazette of India Extraordinary
(Part III-Section 4) on 21 October, 2013 vide Gazette No. 275.
2. An inadvertent typographical error is noticed in the storage charge prescribed in Sl. No. 4 Non-ICD/CFS
Export-Empty container in Schedule 3.2-Dwell Time Charges for container storage in the port premises for container
above 40' for the seventh slab i.e. 19-22 days. The Storage charge for the relevant item appearing in the Scale of Rates
notified on 21 October, 2013 and the correction made is given below:—
Chapter 3, Schedule 3.2, Sl. No. 4, seventh slab as Chapter 3, Schedule 3.2, Sl. No.4, seventh slab to be
appearing in the Notification read as given below
DWELL TIME CHARGES FOR CONTAINER, DWELL TIME CHARGES FOR CONTAINER, STORED
STORED IN THE PORT PREMISES: IN THE PORT PREMISES:
Sl. Rate per container per day or part Sl. Rate per container per day or part thereof
No. thereof (in ````) No. (in ````)
Particulars Particulars
Over 20' to Over 20' to
Upto 20' in Above 40' Upto 20' in Above 40' in
upto 40' in upto 40' in
length in length length length
length length
4 Non-ICD/ CFS Export - Empty 4 Non-ICD/ CFS Export - Empty
19-22 days 1091.20 2182.40 33273.59 19-22 days 1091.20 2182.40 3273.59
T.S. BALASUBRAMANIAN, Member (Finance)
[ADVT.-III/4/Exty./143/2014]
Printed by the Manager, Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.