(i).
(ii).
6251 GI/2021 (1)2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
ष
1.
Ø-la- dkxk sZfooj.k mRikndrk ekunaM
1. lhvksVh] ,uVhch vkjS ,lVhch esa izgfLrr ihvks,y mRikn flok; Q~;wjsal vkW;y
(i). ,p,lMh 1050 Vu@?kaVk
(ii). ,e,l 600 Vu@?kVa k
(iii). ukIFkk 750 Vu@gkÅl
2 ikbiykbuk sads ek/;e l sizgfLrr lhesaV 210 Vu@gkÅl@IokbaV
2.
Ø-la- ekud ?kaVk sal svf/kd okLrfod cFkZ ?kaVk sagsrq tqekuZ k izksRlkgu ¼los fd, x, cFkZ ?kaVk sads fy,½
ty;ku dh okLrfod dk;Z vof/k ¼iksr dk ifjpkyu iwjk gksus rd tqekuZ k ty;ku dh okLrfod dk;Z vof/k ¼iksr dk ifjpkyu iwjk izksRlkgu
dk;Zxr cFk Zesa cfFkaZx ds chp le;½ gksus rd dk;Zxr cFkZ esa cfFkZxa ds chp le;½
1 fofufnZ”V le; ds 5 ifzr’kr ds Hkhrj ‘kwU; fofufnZ”V le; ds 5 ifzr’kr ds Hkhrj ‘kwU;
2 5 ifzr’kr l svf/kd fofufnZ”V le; ds 15 izfr’kr rd 1.0 x cFkZ fdjk;k 5 izfr’kr l s vf/kd fofufnZ”V le; ds 15 izfr’kr 0.5 x cFkZ fdjk;k
rd
3 2.0 x cFkZ fdjk;k fofufnZ”V le; ds 15 izfr’kr ds ijs derj 1.0 x cFkZ fdjk;k
3. 19 2021
(i). 2016
189 05 2017
04 2017
श 4 ष
Ø-la- dkxks Z Vhih,p esa ekunaM njksa dk ykxw fd;k tuk Lka’kks/ku ds fy, vk/kkj
1 ihvks,y 650 04.06.2017 Hkkjr ljdkj dh cfFkaZx uhfr ds vuqlkj Vh,,eih dh vf/klwpuk th la- 189 fnukad 05-05-2017
lhesaV 190
2 Ikhvks,y 800 12.02.2018 cfFkaZx uhfr ds 7 ds [kaM 7-2 ij vk/kkfjr
lhesaV 210
3 Ikhvks,y 1000 15.06.2018 cfFkaZx uhfr ds 7 ds [kaM 7-2 ij vk/kkfjr
lhesaV 210
4 ,p,lMh 1050 14.03.2019 Vh,,eih dh vf/klwpuk th la- 60 fnukad 12 Qjojh 2019 & ihvks,y mRiknk sa ij mRikndrk esa
,e,l 600 egRoiw.k ZfHkUurk ds dkj.k] iRru }kjk ihvks,y mRiknk sads fy, lkekU; ekunaMk sadh ctk; iRru }kjk
ukIFkk 750 ,p,lMh] ,e,l vkjS ukIFkk gsrq ?kVdokj ekunaMksa dk l>q ko fn;k x;k FkkA
lhesaV 210
(ii). 14-03-2019 13-03-2021
(iii). 19
(iv).[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 3
(v). 7-2 60 70
(vi).
( ) 14-03-2019 15-03-2021
318 70
143
53 52
(ख) 955
543 774 38
51 69
88
7.3 70
(vii).
168 220
295
14-03-2019 15-03-2021
230 318
220 19
(viii). 64 210
73
7-2 60 70
230
55
(ix).
( ).
1.4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
Ø-la- dkxkZs
lhvkVs h] ,uVhch vkSj ,lVhch esa izgfLrr ihvks,y mRikn & ,p,lMh] ,e,l vkSj dk;Zfu”iknu ekunaM
ukIFkk
1. (i). ,p,lMh 1050 Vu@?kaVk
(ii). ,e,l 600 Vu@?kaVk
(iii). ukIFkk 750 Vu@?kaVk
2. ikbiykbuksa ds ek/;e ls igz fLrr lhesaV 230 Vu@?kaVk@IokbaV
(ख)
(i).
(ii). 6
(iii).
Ø-la- izksRlkgu tqekZuk
¼ekud ?kaVksa ls de cFkZ ?kaVksa ds fy,½ ¼ekud ?kaVksa ls vf/kd cFkZ ?kaVksa ds fy,½
okLrfod cFkZ ?kaVs izksRlkgu okLrfod cFkZ ?kaVs izksRlkgu
1. fofufnZ”V le; ds 5 izfr’kr ds Hkhrj ‘kwU; fofufnZ”V le; ds 5 izfr’kr ds Hkhrj ‘kwU;
2. 5 izfr’kr ls ekud cFkZ ?kaVksa ds 15 izfr’kr ds ij s 5 izfr’kr ls ekud cFkZ ?kaVksa ds 15 izfr’kr ds ij s 1.0 X cFkZ fdjk;k
0.5 X cFkZ fdjk;k
fuEurj vf/kd
3. ekud cFkZ ?kaVksa ds 15 izfr’kr ls ij sfuEurj 1.0 X cFkZ fdjk;k ekud cFkZ ?kaVksa ds 15 izfr’kr ls vf/kd 2.0 X cFkZ fdjk;k
(iv).
(v).
(d).
(ख).
(x).
(?k).
(ड).
(p). 30
(N).
(x).
(xi).
4
18 2019[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 5
5 26 2021
19 2021 9 2 18
2019 19 2021 19
2021 9 2 26 2021
iwoZ izLrko fnukad 19 tqykb Z 2021 esa izLrkfor ijS k 9 ¼2½ esa izLrkfor ‘krsa Z Lka’kkfs/kr iLz rko fnukad 26 tqykbZ 2021 esa iSjk 9 ¼2½ esa izLrkfor ‘krsa Z
(i). cFk Z esa iksr ds fojke ds fy, fofufnZ”V le; dh x.kuk mi;qZDr fofufnZ”V (i). cFk Z esa ikrs ds fojke ds fy, fofufnZ”V le; dh x.kuk mi;ZqDr
dk;Zfu”iknu ekunaMkas ds vk/kkj ij dh tk,xhA fofufnZ”V dk;Zfu”iknu ekunaMkas ds vk/kkj ij dh tk,xhA
(ii). ‘kq:vkr ls igys vkSj i.w k Z gksus ds ckn dh vkSipkfjdrkvkas ds fy, (ii). (d). ‘kq:vkr ls igys vkSj iw.k Z gkus s ds ckn dh vkSipkfjdrkvkas
visf{kr le; 6 ?kaVs ekuk tk,xkA ds fy, visf{kr le; 6 ?kaVs ekuk tk,xkA
-- ([k). db Z ihvks,y mRiknksa dh <qykbZ djus okys ikrs ksa ds
fy,] iRz;sd xszM ds dkxkZs ds fy, vfrfjDr nks ?kaV s ‘k:q vkr ls
igy s vkSj i.w kZ gkus s ds ckn dh vkiS pkfjdrkvksa ds fy, ekus
tk,axAs
-- (iii). dbZ ?kVdkas dk izgLru djus okys ty;kuksa ds fy,] ekud cFk Z
?kaV s fuEuor ~ ifjxf.kr fd, tk,ax%s
-- (d). ,dy ?kVd igz Lru ds le; ds fy, & ?kVd ds fy,
ykxw dk;Zfu”iknu ekunaMA
-- ([k). db Z ?kVdkas ds lger izgLru ds le; ds fy, &
lekukUrjr% igz fLrr ?kVdksa ds fy, ykxw dk;Zfu”iknu ekunaMkas
dk tkMs +A
(iii). cFk Z esa fofufnZ”V le; vftZr djus esa foQyrk vFkok lQyrk ds fy,] (iv). cFk Z esa fofufnZ”V le; vftZr djus esa foQyrk vFkok lQyrk
tqekuZ k@ikzRslkgu uhps rkfydkc) fd, x, vulq kj ykxw gkxs k% ds fy,] tqekuZ k@ikzRslkgu uhps rkfydkc) fd, x, vulq kj
ykxw gksxk%
Ø- izksRlkgu tqekuZ k
l-a ¼ekud ?kaVk sa ls de cFk Z ¼ekud ?kaVk sa ls vf/kd Ø- izksRlkgu tqekuZ k
?kaVka s ds fy,½ cFk Z ?kaVk sa ds fy,½ la- ¼ekud ?kaVk sa ls de ¼ekud ?kaVk sa ls vf/kd
1. fofufnZ”V ‘kwU; fofufnZ”V ‘kwU; cFk Z ?kaVk sa ds fy,½ cFk Z ?kaVk sa ds fy,½
le; ds 5 le; ds 5 1. fofufnZ”V ‘kwU; fofufnZ”V ‘kwU;
ifzr’kr ds ifzr’kr ds le; ds 5 le; ds 5
Hkhrj Hkhrj ifzr’kr ds ifzr’kr ds
2. 5 ifzr’kr ls 5 ifzr’kr ls 1.0 X Hkhrj Hkhrj
ekud cFkZ 0.5 X ekud cFkZ cFk Z 2. 5 ifzr’kr ls 5 ifzr’kr ls 1.0
?kaVk sa ds 15 cFk Z ?kaVk sa ds 15 fdjk;k ekud cFkZ 0.5 ekud cFkZ X cFkZ
ifzr’kr ds fdjk;k ifzr’kr ds ?kaVk sa ds 15 X cFkZ ?kaVk sa ds 15 fdjk;k
ij s fuEurj ij s mPprj ifzr’kr ds fdjk;k ifzr’kr ds
3. ekud cFkZ ekud cFkZ 2.0 X ij s fuEurj ij s mPprj
?kaVk sa ds 15 1.0 X ?kaVk sa ds 15 cFk Z 3. ekud cFkZ ekud cFkZ 2.0
cFk Z
ifzr’kr ls ifzr’kr ls fdjk;k ?kaVk sa ds 15 1.0 ?kaVk sa ds 15 X cFkZ
ij s fuEurj fdjk;k vf/kd ifzr’kr ls X cFkZ ifzr’kr ls fdjk;k
fdjk;k
ij s fuEurj vf/kd
(iv). mi;ZqDr rkfydk esa fu/kkZfjr tqekuZ k ty;ku dk dkxkZs ifjpkyu (v). mi;ZqDr rkfydk esa fu/kkfZjr tqekuZ k ty;ku dk dkxks Z ifjpkyu
ijw k djus esa yxu s okys vfrfjDr ?kaVk sa ¼vFkkrZ ~] okLrfod ?kaVs & ijw k djus esa yxus okys vfrfjDr ?kaVka s ¼vFkkrZ ~] okLrfod ?kaVs &
ekud ?kaVs½ ds fy, olwy fd;k tk,xkA ikzRslkgu iRz;sd ekud ?kaVs½ ds fy, olwy fd;k tk,xkA ikzRslkgu iRz;sd
vfrfjDr cpr fd, x, ?kaVs] vFkkrZ ~ ekud ?kaVk & okLrfod vfrfjDr cpr fd, x, ?kaVs] vFkkZr~ ekud ?kaVk & okLrfod ?kaVk
?kaVk ds fy, ns; gkxs kA ds fy, ns; gkxs kA
(v). tqekuZ k@ikzRslkgu dh x.kuk djus ds iz;kstu ds fy, iRz;sd (vi). tqekuZ k@ikzRslkgu dh x.kuk djus ds i;z kstu ds fy, iRz;sd
ty;ku }kjk vftZr okLrfod dk;Zfu”iknu ds ifjdyu esa] ty;ku }kjk vftZr okLrfod dk;Zfu”iknu ds ifjdyu esa]
fuEufyf[kr dkj.kka s ls ifjpkyu dk :duk ‘kkfey ugha fd;k fuEufyf[kr dkj.kka s ls ifjpkyu dk :duk ‘kkfey ugha fd;k
tkrk g%S tkrk g%S
(d). mi laj{kd }kjk ;Fkk izekf.kr ljq f{kr ukSpkyu ds (d). mi laj{kd }kjk ;Fkk izekf.kr lqjf{kr ukSpkyu ds
fy, TokjHkkVk] MªkQ~V vkfn gsr q irz h{kkjr ty;kuks a dk dkbs Z fy, TokjHkkVk] MªkQ~V vkfn gsrq irz h{kkjr ty;kuks a dk dkbs Z
fojkeA fojkeA6 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
([k). ikbyV dh nsjh ls vkiwfr Z vkSj Vx dh vuiq yC/krk ([k). ikbyV dh nsjh ls vkifwr Z vkSj Vx dh vuiq yC/krk
lfgr iRru ds dkj.k ty;ku ds ukSpkyu esa dksb Z foyacA lfgr iRru ds dkj.k ty;ku ds ukSpkyu esa dksb Z foyacA
(x). eklS e laca/kh fojke vkSj foyacA (x). eklS e laca/kh fojke vkSj foyacA
(?k). iksrka s ds LFkkukra j.k ds dkj.k fojke vkSj foyacA (?k). iksrka s ds LFkkukra j.k ds dkj.k fojke vkSj foyacA
(³). iRru }kjk ikzf/kd`r cda jksa] ejEer vkfn ds fy, (³). iRru }kjk ikzf/kd`r cda jksa] ejEer vkfn ds fy,
ty;ku dk dkbs Z foLrkfjr fojkeA ty;ku dk dkbs Z foLrkfjr fojkeA
(p). vf/kdre 30 feuV dh vof/k rd Mqcko los{Zk.kka s esa (p). vf/kdre 30 feuV dh vof/k rd Mqcko losZ{k.kksa esa
yxu s okyk le;A yxu s okyk le;A
(N). cFk Z esa iRru }kjk miyC/k djok;s x, miLdj dk (N). cFk Z esa iRru }kjk miyC/k djok;s x, miLdj dk
[kjkc gkus k@vuqiyC/krkA [kjkc gkus k@vuqiyC/krkA
6 19 2021 26
2021 26 2021 27 2021
”
06 2021
7 06 2021
(i). 26 2021 6
88 69
(ii). 7 295
220
(iii).
(iv). 5
65
(v).
8 27 2021
27 2021
9
http://tariffauthority.gov.in
10
(i). 2016
ष ््
29 2017[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 7
(ii).
48 2018 18 2019
14 2019 13 2021
(iii). 7-2 60 70
14-03-2019
15-03-2021
18 2019 1050
600 750
14-03-2019 15-03-2021 955
543 774
38 51
69 7-3
70
14-03-2019
15-03-2021
(iv). 18 2019
ष ्् 210 14-03-2019 15-03-2021
168 220
230
220
64 210
73
7-2 60 70
230 558 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
210
77 218 77
45 58-44 210
210 230
220 210 230
2016 7-2
60 70
(v).
3 2019
2019
(vi). 3 2019
8-
5
ष ््
2016
(vii).
30
30
(viii). 14 2021
14 2021[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 9
11.1.
1.
Ø-la- dkxkZs fooj.k
mRikndrk ekunaM
1. lhvkVs h] ,uVhch vkSj ,lVhch esa izgfLrr ihvks,y mRikn & ,p,lMh] ,e,l vkSj ukIFkk
(i). ,p,lMh 1050 Vu@?kaVk
(ii). ,e,l 600 Vu@?kaVk
(iii). ukIFkk 750 Vu@?kaVk
2. ikbiykbuksa ds ek/;e ls igz fLrr lhesaV 230 Vu@?kaVk@IokbaV
2.
(i).
(ii) ( ) 6
(ख)
(iii).
(d)
(ख)
(iv).
ekud ?kaVksa ls vf/kd okLrfod cFkZ ?kaVksa gsrq tqekZuk izksRlkgu ¼lso fd, x, cFkZ ?kaVksa ds fy,½
Ø-la-
ty;ku dh okLrfod dk;Z vof/k ¼iksr dk ifjpkyu tqekZuk ty;ku dh okLrfod dk;Z vof/k ¼iksr dk ifjpkyu izksRlkgu
iwjk gksus rd dk;Zxr cFkZ esa cfFkZxa ds chp le;½ iwjk gksus rd dk;Zxr cFkZ esa cfFkZxa ds chp le;½
1 fofufnZ”V le; ds 5 izfr’kr ds Hkhrj ‘kwU; fofufnZ”V le; ds 5 izfr’kr ds Hkhrj ‘kwU;
5 izfr’kr ls vf/kd fofufnZ”V le; ds 15 izfr’kr rd 1.0 x 5 izfr’kr ls vf/kd fofufnZ”V le; ds 15 0.5 x cFkZ fdjk;k
2
cFkZ fdjk;k izfr’kr rd fuEurj
3 fofufnZ”V le; ds 15 izfr’kr ls mPprj 2.0 x fofufnZ”V le; ds 15 izfr’kr ds ij sderj 1.0 x cFkZ fdjk;k
cFkZ fdjk;k
(v).
(vi). ष ््
‘
( )10 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
(ख)
( )
( )
(ड).
( ) 30
( )
3.
30
11-2- 48 2018 18 2019
,
[जवज्ञापन-III/4/असा./386/2021-22]
TARIFF AUTHORITY FOR MAJOR PORTS
NOTIFICATION
Mumbai, the 11th October 2021
No.TAMP/41/2021-COPT: —In exercise of the powers conferred by Section 48 of the Major Port
Trusts Act, 1963 (38 of 1963), the Tariff Authority for Major Ports hereby approves Performance Norms based
Incentive and Penalty Scheme under the Berthing Policy 2016 at the Cochin Port Trust as in the Order appended
hereto.
Tariff Authority for Major Ports
Case No.TAMP/41/2021-COPT
Cochin Port Trust … Applicant
QUORUM
(i). Shri. T.S. Balasubramanian, Member (Finance)
(ii). Shri. Sunil Kumar Singh, Member (Economic)
ORDER
(Passed on this 1st day of October 2021)
This case relates to the proposal received from the Cochin Port Trust (COPT) seeking approval for the
Performance Norms based Incentive and Penalty Scheme under the Berthing Policy 2016.
2.1. This Authority vide its Order No.TAMP/48/2018-COPT dated 18 January 2019 has last approved
the revised Performance norm based Incentive / Penalty Scheme at COPT. This Order was notified in the Gazette of
India on 12 February 2019 vide Gazette No.60. The notified provision of performance and penalty/ incentive norms
came into effect after expiry of 30 days from date of notification of the Order in the Gazette of India and was valid for
two years.[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 11
2.2. The relevant extract of the said Order relating to revised productivity norms and incentive / penalty
prescribed in the said Order is given below:
1. Performance Norms:
Sr. No. Cargo Particulars Productivity Norms
1. POL products except Furnace oil, handled at
COT, NTB & STB
(i). HSD 1050 Tonnes / Hour
(ii). MS 600 Tonnes / Hour
(iii). Naphtha 750 Tonnes / House
2 Cement handled through Pipelines 210 Tonnes / House / Point
2. Incentive / Penalty:
For failure or success in achieving the stipulated time at berth, penalty / incentive will be applicable as tabulated
below:
Sr. No. Penalty for actual berth hours exceeding the Incentive (for Berth Hours saved)
normative hours
Actual working period of the Penalty Actual working period of the Incentive
ship (time between berthing ship (time between berthing
at the working berth till at the working berth till
completion of vessel’s completion of vessel’s
operation) operation)
1 Within 5% of the stipulated time Nil Within 5% of the stipulated Nil
time
2 More than 5% to 15% of the 1.0 x Berth Hire Lower beyond 5% to 15% of 0.5 x Berth Hire
stipulated time the stipulated time
3 2.0 x Berth Hire Lower beyond 15% of the 1.0 x Berth Hire
stipulated time
3. The main points made by COPT in its proposal dated 19 July 2021 are summarised below:
(i). In accordance with the Berthing Policy issued by Ministry of Shipping, Government of India in June 2016,
the Performance Norms based Incentive and Penalty Scheme was implemented in Cochin Port with effect from 04
June 2017 after approval and notification by Tariff Authority for Major Ports (TAMP) vide Gazette No.189 dated 05
May 2017. The said Scheme for cargo operations at COPT was instituted for POL Products except Furnace Oil,
handled at COT, NTB & STB, and Cement handled through Pipelines, and the norms fixed during last 4 years as
given below:
Sl. Norms in Applicability of the
Cargo Basis for revision
No. TPH rates
1 POL 650 04.06.2017 TAMP’s Notification G No. 189 dated 05.05.2017 in
Cement 190 accordance with the GOI Berthing Policy
2 POL 800 12.02.2018 Based on Clause 7.2 of 7 of Berthing Policy
Cement 210
3 POL 1000 15.06.2018 Based on Clause 7.2 of 7 of Berthing Policy
Cement 210
4 HSD 1050 14.03.2019 TAMP’s Notification G No.60 dated 12 February 2019 –
MS 600 Due to Significant variation in productivity across POL
Naphtha 750 products commodity-wise norms for HSD, MS and
Cement 210 Naphtha was suggested by port instead of the common
norms for POL Products.
(ii). The present productivity norms were effective from 14.03.2019 with a validity of two years, upto 13.03.2021
(iii). However, due to oversight and the COVID-19 Pandemic disrupting normal life, the proposal for renewal of
the Scheme could not be submitted within the stipulated time. The delay in submitting the proposal may kindly be
condoned.
(iv). The implementation of the ‗Performance Norms based Incentive and Penalty Scheme‘ under the Berthing
Policy has contributed to improvement in productivity for the cargo under the scheme.
(v). As per Clause 7.2 of the Berthing Policy, the port should increase the norms if more than 60-70% of the
ships are achieving the set norms. Accordingly, the following revised ‗Performance Norms based Incentive and
Penalty Scheme for POL Products – HSD, MS and Naphtha handled at COT, NTB & STB; and Cement handled
through pipelines is proposed for renewal of the Scheme.12 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
(vi). POL Products – HSD, MS and Naphta – handled at COT, NT & STB
(a). COPT analyzed the performance of ships those handled HSD, MS and Naphtha at COT, NTB &
STB for the period from 14.03.2019 to 15.03.2021. Out of the 318 ships that handled these products, 70 ships had
handled two products; HSD and MS simultaneously; 143 ships had handled HSD alone; 53 ships had handled MS
alone and 52 ships had handled Naphtha alone. While BPCL handled all the three Products, IOCL and HPCL
handled import of HSD & MS.
(b). The average productivity in the above period was found to be 955 TPH for HSD, 543 TPH for MS
and 774 TPH for Naphtha. The norms were achieved by 38% of ships carrying HSD, 51% of ships carrying MS and
69% (inadvertently mentioned by port as 88% and subsequently corrected) of ships carrying Naphtha. As per Clause
No. 7.3 of the Berthing Policy, exception is that if more than 70% of ships cannot meet norms, the Chairman, in
consultation with Board can relax the norm. However, it is proposed to retain the norms for POL Products – HSD,
MS and Naphtha handled at COT, NTB & STB at the existing level.
(vii). Cement handled through Pipelines:
While analyzing the productivity of Cement vessels, the average productivity was found to be 220TPH (the
figure of 295TPH was communicated wrong inadvertently by COPT) for the 168 ships that were handled in the two
year period from 14.03.2019 to 15.03.2021. Out of the four cement companies operating at the port, three companies
are bringing self-unloading ships, and the average productivity of Cement for these companies was found to be 230
TPH (inadvertently mentioned as 318TPH). The fourth operator, Zuari Cements, brings normal ships that have to be
unloaded using a shore based un-loader with distinctly lower productivity, and the decline of the average productivity
to 220 TPH is because of this. None of the Zuari Cements 19 ships could achieve the prescribed norm. The operator
has, however, indicated to the port that they plan to shift to self-unloading ships as in the case of the other operators.
(viii). On analysis, it is seen that 64% of the ships achieved the norm of 210 TPH per point; and if the
ships of Zuari Cements are excluded, 73% of the ships achieved the norm. Clause 7.2 of the Policy stipulates that if
more than 60%-70% of ships are achieving the set norms, then, the port should increase the norms. Therefore, the
norm for Cement handled through Pipelines is proposed to be revised to 230 TPH per point, which was achieved by
55% of the total ships.
(ix). Accordingly, the revised ‗Performance Norms based Incentive and Penalty Scheme‘ for POL
Products – HSD, MS and Naphtha handled at COT, NTB & STB; and Cement handled through Pipelines is proposed
for examination and approval by this Authority, as under:
(a). Incentive & Penalty Scheme based Performance Norms:
1. Performance Norms
Sr. no. Cargo
POL Products – HSD, MS and Naphtha – handled at COT, NTB Performance norms
& STB
1. (i). HSD 1050 Tonnes/Hour
(ii). MS 600 Tonnes/Hour
(iii). Naphtha 750 Tonnes/Hour
2. Cement handled through Pipelines 230 Tonnes/Hour/Point
(b). Incentive & Penalty:
(i). The stipulated time for a vessel‘s stay at berth will be calculated based on the performance norms
prescribed above.
(ii). Time required for pre-commencement and post-completion formalities shall be considered as 6
hours.
(iii). For failure or success in achieving the stipulated time at berth, penalty / incentive will be applicable
as tabulated below:
Sr. Incentive Penalty
No. (For Berth Hours less than Normative Hours) (For Berth Hours exceeding Normative Hours)
Actual Berth Hours Incentive Actual Berth Hours Penalty
1. Within 5% of Normative Berth Within 5% of Normative Berth Nil
Nil
Hours Hours
2. Lower beyond 5% to 15% of More than 5% to 15% of 1.0 X Berth Hire
0.5 X Berth Hire
Normative Berth Hours Normative Berth Hours
3. Lower beyond 15% of Normative More than 15% of Normative 2.0 X Berth Hire
1.0 X Berth Hire
Berth Hours Berth Hours[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 13
(iv). Penalty prescribed in the above table will be levied for additional hours (i.e., Actual Hours – Normative
Hours) taken to complete the ship‘s cargo operation. Incentive will be payable for every additional hour saved, i.e.
Normative Hour-Actual Hour.
(v). In computing actual performance achieved by each ship for the purpose of calculating penalty / incentive,
stoppage of operation on account of the following are to be excluded.
(a). Any stay of ships waiting for tide, draft, etc. for safe sailing as certified by the Deputy Conservator.
(b). Any delay in sailing of the ship due to the port including late supply of pilot and unavailability of
tug.
(c). Weather related stoppages and delays.
(d). Stoppages and delays due to shifting of vessels.
(e). Any extended stay of the ship for bunkers, repair etc., authorized by the port.
(f). Time consumed for draft surveys upto maximum period of 30 minutes.
(g). Break-down/ non availability of Port provided equipment at berth.
(x). It is also requested to kindly extend the validity of the prevailing scheme until the revised scheme is
approved and notified by this Authority.
(xi). Approval of the Board of Trustees of the COPT as required will be obtained and intimated to this Authority.
4. On perusing the proposal of COPT, it is seen that the COPT has proposed to revise the Performance
norms for Cement only. For other cargo items viz. HSD, MS and Naptha, the port for the reasons stated has
proposed to retain the existing norms prescribed in the Order dated 18 January 2019.
5. Subsequently, the COPT vide its email dated 26 July 2021 has forwarded the revised
conditionalities w.r.t Para 9 (2) of its earlier proposal dated 19 July 2021 citing that a few existing conditionalities
prescribed in the Order dated 18 January 2019 were found omitted in its proposal dated 19 July 2021. A comparative
statement showing proposed conditionalities at Para 9 (2) in its earlier proposal dated 19 July 2021 and incorporated
in its communication dated 26 July 2021 (omitted conditionalities are highlighted in Bold) is given below:
Proposed conditionalities at Para 9 (2) proposed in Proposed conditionalities at Para 9 (2) in the revised
the earlier proposal dated 19 July 2021 proposal dated 26 July 2021
(i). The stipulated time for a vessel’s stay at berth will (i). The stipulated time for a vessel’s stay at berth will
be calculated based on the stipulated performance be calculated based on the stipulated performance
norms as mentioned above. norms as mentioned above.
(ii). Time required for pre-commencement and post (ii). (a). Time required for pre-commencement and
completion formalities shall be considered as 6 post completion formalities shall be considered as
hours. 6 hours.
-- (b). For vessels carrying multiple POL
products, additional two hours for each ``````
grade of cargo shall be considered for pre-
commencement and post completion
formalities.
-- (iii). For ships handling multiple commodities, the
Normative Berth Hours will be computed as
under
-- (a). For the time of single commodity handling
– Performance norm applicable for the
commodity.
-- (b). For the time of concurrent handling of
multiple commodities – Sum of the
Performance norms applicable for the
commodities handled simultaneously.
(iii). For failure or success in achieving the stipulated (iv). For failure or success in achieving the stipulated
time at berth, penalty / incentive will be applicable time at berth, penalty / incentive will be applicable
as tabulated below: as tabulated below:
S. Incentive Penalty S. Incentive Penalty
No. (for Berth Hours (for Berth Hours No. (for Berth Hours (for Berth Hours
less than Normative exceeding less than exceeding
Hours) Normative Hours) Normative Hours) Normative Hours)
1. Within 5% Nil Within 5% Nil 1. Within 5% Nil Within 5% Nil
of of of of
Normative Normative Normative Normative
Berth Hours Berth Berth Berth
Hours Hours Hours14 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
2. Lower 0.5 x More than 1.0 x 2. Lower 0.5 x More than 1.0 x
beyond Berth 5% to Berth beyond Berth 5% to Berth
5% to Hire 15% of Hire 5% to Hire 15% of Hire
15% of Normative 15% of Normative
Normative Berth Normative Berth
Berth Hours Berth Hours
Hours Hours
3. Lower 1.0 x More than 2.0 x 3. Lower 1.0 x More than 2.0 x
Beyond Berth 15% of Berth Beyond Berth 15% of Berth
15% of Hire Normative Hire 15% of Hire Normative Hire
Normative Berth Normative Berth
Berth Hours Berth Hours
Hours Hours
(iv). Penalty prescribed in the above table will be levied (v). Penalty prescribed in the above table will be levied
for additional hours (i.e., Actual Hours – Normative for additional hours (i.e., Actual Hours – Normative
Hours) taken to complete the ship’s cargo Hours) taken to complete the ship’s cargo
operation. Incentive will be payable for every operation. Incentive will be payable for every
additional hour saved, i.e. Normative Hour – Actual additional hour saved, i.e. Normative Hour –
Hour. Actual Hour.
(v). In computing actual performance achieved by each (vi). In computing actual performance achieved by
ship for the purpose of calculating penalty / each ship for the purpose of calculating penalty /
incentive, stoppage of operation on account of the incentive, stoppage of operation on account of the
following are to be excluded. following are to be excluded.
(a). Any stay of ships waiting for tide, draft etc. for (a). Any stay of ships waiting for tide, draft etc. for
safe sailing as certified by the Deputy Conservator. safe sailing as certified by the Deputy
(b). Any delay in sailing of the ship due to the Port Conservator.
including late supply of pilot and unavailability of (b). Any delay in sailing of the ship due to the Port
tug. including late supply of pilot and unavailability of
(c). Weather related stoppages and delays. tug.
(d). Stoppages and delays due to shifting of (c). Weather related stoppages and delays.
vessels. (d). Stoppages and delays due to shifting of
(e). Any extended stay of the ship for bunkers, vessels.
repair etc. authorized by the Port. (e). Any extended stay of the ship for bunkers,
(f). Time consumed for draft surveys upto repair etc. authorized by the Port.
maximum period of 30 minutes. (f). Time consumed for draft surveys upto
(g). Break-down/ non-availability of Port provided maximum period of 30 minutes.
equipment of berth. (g). Break-down/ non-availability of Port provided
equipment of berth.
6. In accordance with the consultation process prescribed, a copy each of the COPT proposal received
vide email dated 19 July 2021 and subsequent email dated 26 July 2021 was circulated vide our letter dated 26 July
2021 and 27 July 2021 respectively to the users/ user organisations seeking their comments. A copy each of the
comments received from the users/ user organisations was forwarded to the COPT as feedback information. The
COPT has furnished its comments on the comments of users/ user organisations vide its email dated 06 September
2021.
7. Further, the COPT vide its email dated 06 September 2021 has also made following submissions:
(i). In the proposal sent to TAMP on 26 July 2021 at Para 6, norms achieved for ships carrying Naphtha
were inadvertently mentioned as 88% which may please be read as 69%.
(ii). Further, at Para 7 of their proposal the average productivity of cement vessels which were
mentioned as 295 TPH may also be read as 220 TPH.
(iii). It may kindly be noted that the aforesaid revisions do not warrant any change in the norms
proposed.
(iv). The proposal was placed in the meeting of the Board of Trustees of COPT held on 12 August 2021
vide Agenda Item No.D-5 and Board vide Resolution No.65 resolved to approve the proposal. A copy of Board
Agenda and Resolution is also furnished.
(v). TAMP may kindly approve the revised scheme and extend the validity of the prevailing scheme
until the revised scheme is approved and notified by this Authority.
8. A joint hearing in this case was held on 27 August 2021 through Video Conferencing. The COPT
made a power point presentation and has also furnished a copy of the presentation vide its email dated 27 August
2021. The COPT and the concerned users / user organizations have made their submissions at the joint hearing.[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 15
9. The proceedings relating to consultation in this case are available on records at the office of this
Authority. An excerpt of the comments received and arguments made by the concerned parties will be sent
separately to the relevant parties. These details will also be made available at our website http://tariffauthority.gov.in.
10. With reference to the totality of the information collected during the processing of this case, the
following position emerges:
(i). The Ministry of Shipping (MOS) in June 2016 has issued the Berthing Policy for Dry Bulk Cargo
for Major Ports, and directed all the Major Port Trusts to implement the norms with incentives and penalties. The
policy lays down standardized guidelines for all major ports to compute performance norms for different dry bulk
commodities, taking into account the infrastructure available at ports. The Berthing Policy does not cover Liquid
cargo like POL Products (except Furnace Oil, Benzene and Vaccum Residue) and cement handling through pipe line.
The Cochin Port Trust (COPT), however, with an aim to improve the productivity at the port at the benchmark level
and incentivize the vessel for improved performance and penalize if performance is below the proposed performance
level, had sought approval of performance standards for the above two predominant cargo handled at the port along
with penalty / incentive linked to the productivity levels which was approved by this Authority vide Order dated
29 March 2017.
(ii). Subsequently, in accordance with the Berthing Policy, the port reviewed the actual Performance for
these commodities and proposed commodity wise performance norms for POL Products viz., High Speed Diesel
(HSD), Motor Spirit (MS) and Naphtha instead of common performance for POL products then prevailing along with
revised performance norms for Cement handled through pipelines. This Authority vide Order No.TAMP/48/2018-
COPT dated 18 January 2019 has approved the revised performance norms and Incentive/ Penalty linked to
performance norms for HSD, MS and Naphtha and for Cement handled through pipelines for cargo operations at
COPT as proposed by the COPT. The said Order came into effect from 14 March 2019 and was valid upto for two
years, i.e. 13 March 2021.
(iii). Clause 7.2 of the Berthing Policy stipulates that if more than 60%-70% of ships are achieving the
set-norms, then the port should increase the norms. The Berthing Policy requires the ports to review the performance
norms every quarter in the first year until target norms are achieved.
In view of the above, the COPT has reviewed the productivity actually achieved at the port in the two years
period from 14.03.2019 to 15.03.2021 vis-à-vis the prescribed Performance Norms.
The Performance norms prescribed in the last Order dated 18 January 2019 is 1050 tonnes / hour for HSD, 600T /
hour for Motor Spirit and 750 T / hour for Naphtha. The port has reported that the average productivity achieved
during the period of two years from 14.03.2019 till 15.03.2021 is 955 T/hour for HSD, 543 T/hour for Motor Spirit
and 774 T/hour for Naphtha. The port has further reported that the prescribed norms were achieved by 38% of ships
carrying HSD, 51% of ships carrying MS and 69% of ships carrying Naphtha. The port has cited clause 7.3 of the
Berthing Policy, which states that if more than 70% of ships cannot meet the norms, the Chairman in consultation
with the Board can relax the norm. The port has, however, proposed to retain the prevailing norms for POL products
viz., HSD, MS and Naphtha handled at COT, NTB and STB.
In view of the above position, and recognising the COPT has proposed to retain the existing norms for POL
products viz., HSD, MS and Naphtha handled at COT, NTB and STB on the basis of actual performance achieved at
the port from 14.03.2019 to 15.03.2021 and the same is approved by the Board of Trustees of COPT, this Authority is
inclined to approve the same as proposed by the port for the said cargo items of POL products viz., HSD, MS and
Naphtha handled at COT, NTB and STB.
(iv). As regards cement handled through pipeline, the Performance norms prescribed in the last Order
dated 18 January 2019 is 210 TPH. The port has reported that the average productivity achieved during the period of
two years from 14.03.2019 till 15.03.2021 at 220 TPH for the 168 ships.
Out of the four cement companies operating at the port, three companies are bringing self-unloading ships, and the
average productivity of Cement by these companies is reported to be 230 TPH. The fourth operator, Zuari Cements,
brings normal conventional ships that have to be unloaded using a shore based un-loader which decline the average
productivity to 220 TPH. The operator has, however, indicated to the port that they plan to shift to self-unloading
ships as in the case of the other operators.
The COPT has further confirmed that 64% of the ships achieved the norm of 210 TPH per point; and if the
ships of Zuari Cements are excluded, 73% of the ships have achieved the prescribed norm. Clause 7.2 of the Policy
stipulates that if more than 60%-70% of ships are achieving the set norms, then, the port should increase the norms.
Therefore, the norm for Cement handled through Pipelines is proposed to be revised to 230 TPH per point, which was
achieved by 55% of the total ships.16 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEC.4]
The Ultra Tech Cement Limited (UCL) has requested to retain the performance standard at the existing level
of 210 TPH on the grounds that average productivity achieved is not consistent; it varies from ship to ship based on
its evacuation. In response, the COPT has categorically stated that from the analysis done by the port, out of the 77
ships of Ultra Tech Cements, the average productivity of the ships is found to be 218 TPH. Further, 45 out of 77
ships (58.44%) have achieved the norm of 210 TPH and above. Hence, the COPT has viewed that the marginal
increase in the norm from 210 TPH to 230 TPH is not expected to impact the customer adversely.
Further, the Penna Cement Industries Limited (PCIL) has requested that the cement performance parameters for
cement handled through pipelines be grouped into categories on the basis of distance of the silo from the vessel.
The port while admitting that distance between the ship and the silo impacts productivity, has justified its proposal
stating that when cement as a commodity across different terminals is analyzed, the average productivity is found to
be of 220 TPH. The proposal to increase the norm marginally from 210 to 230 TPH was in consideration of the
differences among the terminals.
Clause 7.2 of the Berthing Policy, 2016 issued by the MOS requires the Major Port Trusts to review the
norms and increase the norms if more than 60%-70% of ships are achieving the set-norms until target norms are
reached. The proposal of the COPT complies with the said clause of the Berthing Policy. The request made by the
UCL to maintain status quo in the performance norms is not found to be in line with the Berthing Policy.
In view of the justification furnished by the port and recognizing that the proposal of the port intends to improve the
performance of the port and to improve turnaround time of vessel and is also approved by the Board of Trustees of
COPT and also since the proposal filed by the port is in compliance with the direction of Berthing Policy issued by
the MOPSW, this Authority approves the revised performance norms proposed by the port for cement handled
through pipeline
(v). The port has proposed to retain the existing incentive and penalty scheme and the conditionalities
prescribed in the January 2019 Order except the note (3) regarding validity period of the proposed Performance
Norms. That being so, the existing incentive and penalty scheme and the conditionalities prescribed in the January
2019 are continued to be prescribed. The validity of the Performance Norms is dealt with in the subsequent
paragraph.
(vi). The January 2019 Order at note no. (3) prescribes validity of Performance Norms for a period of
two years from the date it comes into effect as then proposed by the Port. Clause 8.5 of the Berthing Policy stipulate
that performance norms will be revised every quarter during the first year until target norms for commodity are
reached. Subsequent revisions will be done yearly or upon upgradation of berth infrastructure. The first year of
implementation of the penalty/ incentive linked to performance norms is already over and the port has during the first
year revised the norms twice based on quarterly review of the actual performance. That being so, in the absence of
COPT proposing the note as regards validity of the performance norms, the validity of the revised norms approved is
prescribed for a period of one year from the date it comes into effect in line with the Berthing Policy, 2016.
(vii). Ordinarily, the rates approved by this Authority have prospective effect after expiry of 30 days
from the date of notification of the Order in the Gazette of India. Therefore, the revised productivity norms approved
by this Authority comes into force after expiry of 30 days from the date of notification of the Order in the Gazette in
line with the approval generally accorded by this Authority.
(viii). As stated earlier, the Performance Norms approved in the last Order is valid upto 14 March 2021.
The COPT has requested that the validity of the prevailing Performance Norms which expired on 14 March 2021 to
be extended until the revised Performance norms come into effect. In view of the request made by the port, the
existing Performance norms is deemed to have been extended from the date of expiry till the revised Performance
Norms comes into effect.
11.1. In the result, and for the reasons given above and based on a collective application of mind, this
Authority approves the following revised Performance norms and inter linked incentive and penalty scheme:
―Incentive and Penalty Scheme based on Performance Norms
1. Performance Norms:
Sr. No. Cargo Particulars Productivity Norms
1. POL Products – HSD, MS and Naphtha – handled at COT, NTB
& STB:
(i). HSD 1050 Tonnes / Hour
(ii). MS 600 Tonnes / Hour
(iii). Naphtha 750 Tonnes / Hour
2. Cement handled through Pipelines 230 Tonnes / Hour / Point[भाग III—खण् ड 4] भारत का रािपत्र : असाधारण 17
2. Incentive/ Penalty
(i). The stipulated time for a vessel‘s stay at berth will be calculated based on the stipulated
performance norms as mentioned above.
(ii) (a). Time required for pre-commencement and post completion formalities shall be considered
as 6 hours.
(b). For vessels carrying multiple POL products, additional two hours for each additional grade of cargo
shall be considered for pre commencement and post completion formalities.
(iii). For ships handling multiple commodities, the ‗Normative Berth Hours will be computed as under:
(a). For the time of single commodity handling- Performance norm applicable for the
commodity.
(b). For the time of concurrent handling of multiple commodities - Sum of the Performance
norms applicable for the commodities handled simultaneously.
(iv). For failure or success in achieving the stipulated time at berth, penalty / incentive will be applicable as
tabulated below:
Penalty for actual berth hours exceeding the
Incentive (for Berth Hours saved)
normative hours
Actual working period of the Actual working period of the
Sr. No. ship (time between berthing at ship (time between berthing
the working berth till Penalty at the working berth till
Incentive
completion of vessel’s completion of vessel’s
operation) operation)
Within 5% of the stipulated
1 Within 5% of the stipulated time Nil Nil
time
More than 5% to 15% of the Lower beyond 5% to 15% of
2 1.0 x Berth Hire 0.5 x Berth Hire
stipulated time the stipulated time
More than 15% of the stipulated Lower Beyond 15% of the
3 2.0 x Berth Hire 1.0 x Berth Hire
time stipulated time
(v). Penalty prescribed in the above table will be levied for additional hour (i.e., Actual hours –
Normative Hours) taken to complete the ship‘s cargo operation. Incentive will be payable for every additional hour
saved i.e. Normative Hour – Actual hour.
(vi). In computing actual performance achieved by each ship for the purpose of calculating penalty /
incentive, stoppage of operation on account of the following are to be excluded:
(a). Any stay of ships waiting for tide, draft, etc. for safe sailing as certified by the Deputy
Conservator.
(b). Any delay in sailing of the ship due to the Port including late supply of pilot and
unavailability of tug.
(c). Weather related stoppages and delays.
(d). Stoppages and delays due to shifting of vessels
(e). Any extended stay of the ship for bunkers, repair, etc. authorized by the Port.
(f). Time consumed for draft surveys upto maximum period of 30 minutes
(g). Break-down / non-availability of port provided equipment at berth.
3. The performance and penalty/ incentive norms as specified above will be effective after expiry of 30 days
from date of notification of the Order in the Gazette of India and will remain valid for one year.‖
11.2. The validity of existing performance norms approved by this Authority vide Order
No.TAMP/48/2018-COPT dated 18 January 2019, is deemed to have been extended from the date of its expiry till the
revised performance norms in this Order approved comes into effect.
T.S. BALASUBRAMANIAN, Member (Finance)
[ADVT.-III/4/Exty./386/2021-22]