GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
Nagarjuna Sagar Project – Modernisation Packages – Shifting of Electrical Poles and
Transformers from the canal banks of NSLBC – Estimated cost of .42.06 Lakhs-
Sanctioned – Orders – Issued.
------------------------------------------------------------------------------------------------------------
IRRIGATION & CAD (PW.M&MI.T1.A2) DEPARTMENT
G.O.Ms.No. 19 Dated: 03-03-2012
Read the following:
1. From the Chief Engineer, NSP, Hill Colony, Lr.No.CE/NSP/OT.4/AE.2/5201/90/
Vol.26, dt. 28-10-2009.
2. From the Chief Engineer, NSP, Hill Colony, Lr.No.CE/NSP/OT.4/AE.2/5201/90/
Vol.29, dt. 17-12-2011.
******
ORDER:
In view of the circumstances explained by the Chief Engineer, NSP in the letters
1st and 2nd read above, Government after careful examination hereby sanctioned an
amount of .42.06 Lakhs towards the payment of shifting charges of Electrical Poles and
Transformers to the Electricity Department for the distance between Km.81.00 to
104.00 of NSLBC.
2. The expenditure sanctioned in para 1 above shall be debited to the Head of
Account MH 4700-01-129 NSP – GH 11 Normal State Plan – SH 27 C&D – 270 – 272
maintenance.
3. This order issues with the concurrence of Finance (W&P) Department vide their
U.O.No.293/F2(1)/12-1, dt. 13-02-2012.
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
ADITYA NATH DAS
PRINCIPAL SECRETARY TO GOVERNMENT
To
The Chief Engineer, NSP, Hill Colony, Nalgonda.
The Finance (W&P) Department
The Prl. AG, AP, Hyderabad.
SF/SC
// Forwarded :: By Order //
SECTION OFFICER