GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
NABARD–RIDF XVI – Vishakapatnam district - Providing BT surface on road
from Gorapalli R&B road at 3/2 to BN Road at 34/5 via Kotnivanipalem –
Granting of Extension of agreement time up to 31.3.2012 with out imposing
liquidated damages- Orders – Issued.
-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x
PANCHAYAT RAJ AND RURAL DEVELOPMENT (PROGS.II) DEPARTMENT
G.O.Rt.No. 276 Dated: 16.02.2012
Read the following:
1. G.O.Rt.No.1004,PR&RD(Progs.II)Dept,dated. 12.7.2010
2. From the CE, PR, NABARD, Hyd, Lr.No.NB8/DEE-II/
NABARD/ RIDFXVI/Gorapalli/2010-11,dt 2.11.2011.
*****
ORDER:
In the circumstances reported by the Chief Engineer, Panchayat Raj,
NABARD, Hyderabad in his letter 2nd read above, Government after careful
examination of the proposal, hereby grant Extension of Agreement Time up to
31.3.2012, i.e for (179) days without imposing liquidated damages, in respect
of work, “Providing BT surface on road from Gorapalli R&B road at 3/2 to BN
Road at 34/5 via Kotnivanipalem” in Vishakapatnam district, sanctioned under
NABARD RIDF XVI, as the delay was not attributed to the contractor.
2. The Chief Engineer, Panchayat Raj, NABARD, Hyderabad, is requested to
take necessary action accordingly.
3. A copy of this order is available on the Internet and can be accessed at
www.ap.gov.in/goir.
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
C.R.BISWAL
PRINCIPAL SECRETARY TO GOVERNMENT
To
The Chief Engineer, Panchayat Raj, NABARD, Hyderabad.
The Superintending Engineer, Panchayat Raj, Vishakapatnam district.
Copy to:
The PS to Minister (Panchayat Raj & RWS)
Sc / Sf
//FORWARDED::BY ORDER//
SECTION OFFICER